604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc

DOC document 66 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-18-R-4256
Issued by
Department of the Navy Military Sealift Command

About this file

WI 604 Life Raft Certification

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
J_-_2_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0004.docx DOCX document
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
0115_B_Steel_Renewal_Amend_3.doc DOC document
N3220518R4256_AMEND_0003.docx DOCX document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_0002.docx DOCX document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
N32205-18-R-4256_Amend_0001.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
Q_AND_A_Responses___3.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_USNS_ARCTIC_MTA_SOLICITATION.docx DOCX document
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
JA_N32205-18-R-4256__11_July_2018_Redacted.pdf PDF
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N32205-18-R-4256_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_SHIP_REPAIR_ARCTIC_MTA.doc DOC document
Show all 50

USNS ARCTIC Mid-Term Availability has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

T-AOE 8

OUTFIT, FURNISHING & HABITABILITY

N32205-18-R-4256

28 SEPTEMBER 2016

ITEM NO. 604

CATEGORY “A”

N756/CSI/mz

LIFE RAFTS AND EMBARKATION LADDER CERTIFICATION REV-A

1.0 ABSTRACT:

1.1 This item describes the requirement to perform annual certification of the vessel’s life rafts and embarkation ladders.

2.0 REFERENCES:

2.1 NAVSEA Tech Manual S9086-TX-STM-010010 / CH-583V1R5; Section 12 – Liferafts and Abandon Ship Boat.

2.2 MSFSC Standard Work Item No. 002, “Inspection and Repair of Inflatable Liferafts”.

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity

3.1.1 PORT/STBD forward (01 deck house area) and PORT/STBD aft boat deck area (02 level).

Each rack has 5 rafts, for a total of 20 rafts.

3.1.2 Disembarkation Ladder; One (1) each installed at each life-raft location above.

3.2 Description/Manufacturer Data:

3.2.1 Life-raft Manufacturer:

Elliott Man Mk IV TO, SOLAS A Packed/USCG approved; 25 man inflatable raft in fiberglass casing shell; outfitted with Hydrostatic Release and Lanyard.

3.2.2 Disembarkation Ladders: SOLAS/USCG approved; 75 foot long. Six (6) Total.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors regardless of tier are advised to review all other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 Items will be considered out of date if they do not have at least six (6) months of remaining shelf life at the time of inspection.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide all labor, materials, equipment, rigging, staging, crane service, transportation, and shop facilities to accomplish the requirements of this work item.

7.2 Remove the inflatable life rafts from their respective stowages identified in paragraph 3, including any hydrostatic release devices and convey to SOLAS/U.S.C.G. approved repair facility.

7.3 Record each life-raft number and note exact cradle location. Record, photo document, and note rigging and securing arrangements of each raft to its cradle and orientation of Hydrostatic releases prior to disassembly.

7.3.1 Contractor shall notify the local USCG inspector and/or local ABS Surveyor to inspect life-rafts repairs, and witness life-raft testing requirements.

7.3.2 All items requiring annual replacement shall be priced into the work item. Replaced Items shall be held and presented to MSCREP prior to disposal.

7.3.3 Contractor shall submit a condition report providing an inventory of dated items in each raft that require renewal within 5 days of receiving rafts.

7.3.4 For bidding purposes 14 of 20 life rafts are beyond 10 years from date of manufacture.

7.3.4.1 14 of 20 life rafts will require NAP testing.

7.3.4.2 14 of 20 life rafts will require floor seam inspections.

7.3.4.3 0 of 20 life rafts will require 5 year gas inflation.

7.3.4.4 0 of 20 life rafts will require activation cylinder hydrostatic testing.

7.4 Temporarily remove the disembarkation ladders and inspect in accordance with current USCG and SOLAS-ABS rules and regulations.

7.5 Upon completion of all shop work, reinstall each life-raft in their original location, stow, rig and secure life-rafts as per original arrangements. Replace connecting and mounting hardware and fasteners.

7.6 Install name plates, notices, markings and test label plates for all new, modified and repaired equipment per USCG and ABS Regulations.

7.7 Submit “as-released” condition report listing repairs and/or equipage replacements accomplished to each life-raft. Submit “as released” condition report along with the certificate requirements specified in reference 2.1.2. Originals for ship force file, and copy of originals to MSCREP.

7.8 Submit “as-released” condition report and certificates for all disembarkation ladders.

7.9 Preparation of Drawings:

7.9.1 Provide copies of certificates of inspection with original to Ships Master and Electronic copies to MSCREP.

7.10 Manufacturer’s Representative:

7.10.1 Contractor shall employ the services of a USCG approved facility to accomplish life-raft repairs and certifications.

7.11 Marking: Mark the exterior of each life raft canister with the following:

7.11.1 Label the life rafts containers and release devices showing date of test, contractor's name, location and the USCG inspector’s initials.

8.0 GENERAL REQUIREMENTS: None additional.

604-1