0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc

DOC document 69 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-18-R-4256
Issued by
Department of the Navy Military Sealift Command

About this file

AMENDED WI 0113

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
J_-_2_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0004.docx DOCX document
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_0002.docx DOCX document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
N32205-18-R-4256_Amend_0001.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
Q_AND_A_Responses___3.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_USNS_ARCTIC_MTA_SOLICITATION.docx DOCX document
JA_N32205-18-R-4256__11_July_2018_Redacted.pdf PDF
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N32205-18-R-4256_USNS_ARCTIC.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SOURCES_SOUGHT_FOR_SHIP_REPAIR_ARCTIC_MTA.doc DOC document
Show all 50

USNS ARCTIC Mid-Term Availability has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

HULL, STRUCTURE

N32205-18-R-4256 25 June 2018

ITEM NO. 113

CATEGORY “B”

MSC/N756/JEB

REPLACE SOUNDING TUBE DECK SOCKET COVERS Amend 3

1.0

ABSTRACT

1.1 This work item describes the requirements to replace five sounding tube deck sockets and covers. Amend 3 changes the requirement from replace deck on 7-265-2-JJ to trimming sounding tube between 01 level and Main Deck.

2.0

REFERENCES

2.1 NAVSEA DWG 085-6362912, BOOKLET OF GENERAL DRAWINGS

2.2 NAVSEA DWG 155-636553, Rev K, VENTS, SOUNDING TUBES & OVERFLOWS DIAGRAM.

2.3 NAVSEA DWG 810-135848, REV B, DECK PLATES FOR SOUNDING & FILLING CONNECTIONS.

3.0

ITEM LOCATION / DESCRIPTION

3.1 Item Location:

3.1.1 7-265-2-JJ (page 24/33, Ref 2.2)

3.1.2 5-580-1 (page 23/33, Ref 2.2)

3.1.3 5-580-2 (page 23/33, Ref 2.2)

3.1.4 4-625-2 (page 19/33, Ref 2.2)

3.1.5 3-685-1 (page 19/33, Ref 2.2)

3.1.6 Sounding Tube for DFM Tank 7-425-2-FF

3.1.7 Sounding Tube for DFM Tank 7-245-0-FF

3.2 Item Description/Manufacturers Data

3.2.1 Contractor Furnished Material:

3.2.1.1 Five (4) Deck Sockets and Covers identified in Material list of Ref 2.3.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0

NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.3 Accomplish the requirements of this Work Item in conjunction with the work described in Work Item 021 and 602.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Perform the requirements of this work requirement providing material, labor, and any special tools.

7.2 Provide Gas Free Certificate, Safe for Hot Work for top side area of repair. Gas Free requirements for tanks involved are covered by Work Item 021.

7.3 Provide fire watch services during all cutting, grinding and welding operations.

7.4 For the sounding tube deck sockets identified in Para 3.2.2 to 3.2.5, perform the following:

7.4.1 Remove all interior insulation in the vicinity of underdeck locations of the deck sockets.

7.4.2 Provide cover up and fire protection for equipment and habitability furniture in the underlying areas.

7.4.3 Stage area below deck socket locations to allow for any underdeck welding required. For bidding purposes, estimate no more than six feet of staging is required.

7.4.4 Crop out wasted deck sockets. Deck socket details are included in Detail 17-F (page 4/33) of Ref 2.2 and Ref 2.3.

7.4.5 Template replacement deck socket to fit.

7.4.6 Present fit up to ABS and MSCREP, prior to welding. All fit ups shall be callouts.

7.4.7 Weld deck sockets achieve full penetration. All weld repairs shall be final production weld inspected by ABS and the MSCREP.

7.4.8 Surface prep all areas disturbed by work.

7.4.9 Paint to match surrounding areas.

7.4.10 Air tests shall be performed to verify integrity of deck sockets and caps. Requirements for final air testing are covered in Work Item 103.

7.5 For the 7-425-2-FF Cargo Tank, stage sounding tube to the 45-foot mark.

7.5.1 Cut sounding tube to remove sounding tube plum bob.

7.5.2 Replace removed section with new piping of same material.

7.5.3 Prove sounding tube for travel of sounding tape.

7.5.4 Remove staging and restore tank.

7.5.5 Clean and gas free requirements are covered by WI 021.

7.6 For the 7-245-0-FF Tank, stage the 7-265-1-FF sounding tube to the 16 foot mark.

7.6.1 Cut sounding tube to remove thief sample fixture.

7.6.2 Replace removed section with new piping of same material.

7.6.3 Prove sounding tube for travel of sounding tape.

7.6.4 Remove staging and restore tank.

7.6.5 Clean and gas free requirements are covered by WI 021.

7.7 For the 7-265-2-JJ sounding tube, perform the following:

7.7.1 Perform joint inspection with MSCREP to identify location to cut subject sounding tube and cap line from 01 deck.

7.7.2 As part of joint inspection with MSCREP, identify the height from the main deck to cut sounding tube.

7.7.3 Provide and install a standard Navy sounding tube valve which allows for opening valve and performing tank sounding. This is to be installed on the sounding tube that extends up from the Main Deck.

7.7.4 Install pipe cap on sounding tube remnant from 01 level. Pipe cap shall be seal welded.

7.7.5 Provide any staging required to perform modification.

7.7.6 Provide gas free to seal weld cap.

7.7.7 Provide fire watches for seal weld cap.

8.0 GENERAL REQUIREMENTS: None Additional.

113-1

File details come from the government source that posted it.