0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx

DOCX document 33 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

WI 0504

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

T-AOE 8

AUXILIARY MACHINERY N32205-18-R-4256

1 AUGUST 2017

ITEM NO. 504 Category “A” N756/CSI/PSR

PORT AND STBD RHIB DAVIT INSPECTION REV -

1.0 ABSTRACT:

1.1 This Work Item describes the requirement to perform the maintenance and testing (OEM, IMO and SOLAS) necessary for the re-certification of the Port & Stbd Side Single Point RHIB Davits(SPD).

2.0 REFERENCES

2.1 Technical Manual No. 80-817 for Model No. D6000FCTS Mfr. Allied Davits.

3.0 ITEM LOCATION/DESRCRIPTION:

3.1 01 Level Frame 435 Port and 410 STBD.

3.2 Quantity/Description:

3.2.1 Two (2) Model D6000FCTS Allied Systems Rescue Boat Davits.

3.2.2 Rated Capacity: Six-thousand (6,000) lbs.

3.2.3 Maximum Dynamic Test Load: Seven-thousand-two-hundred-fifty (7,250) lbs.

3.2.4 Maximum Static Test Load: Eleven-thousand-six-hundred (11,600) lbs.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment: None.

4.2 Government Furnished Material:

4.2.1 Accumulators, PN 235611; QTY: 8

4.2.2 CT5 SOLAS Winch, PN 67261; QTY: 2

4.2.3 Capscrew (Certified), PN 245130; QTY: 62

4.2.4 Capscrew (Certified), PN 245132; QTY: 8

4.2.5 Washer, PN 2518353, QTY: 126

4.2.6 Capscrew (Certified), PN 245131; QTY 28

4.3 Government Furnished Services: None.

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7 and 24.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review the other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Tag-Out all required systems and equipment. Drain and dispose of any liquids/solids in accordance with all federal, state, and local regulations.

7.2 Provide all labor and materials to accomplish work under this item.

7.3 Provide staging on port and starboard RHIB davits to accomplish the work described in the requirement.

7.4 Prior to starting any other work the technical representative shall visually inspect all hoisting equipment, hoisting fittings and slings to determine any apparent weakness in the fittings or in their attachment to the boats and to determine whether all parts appear to be in operable condition.

7.5 Following completion of the visual inspection the technical representative with the assistance of ships force shall test operated Safety Boat Davit (SBD), for the purpose of checking system pressures and operating safeties. Proper operation in all modes shall be verified. Submit an “as-found” condition report following preliminary visual and operational inspections along with recommendations for repairs not covered in this work item.

7.6 Remove RHIB Boats from respective davits. RHIB boats shall be stowed and covered with protective covering at a location within the contractor’s facility. Return boats to davits at completion of all maintenance and certifications.

7.7 Perform the following maintenance:

a. Grease all davit components.

b. Install and slush new winch cables for each davit.

c. Remove constant tension winch(s) from both port and starboard davits. Install new GFM constant tension winch(s) at both locations.

d. Remove accumulators from both davit locations and install GFM accumulators.

e. Remove all base cap screws and replace with new GFM cap screws. Base screws shall be replaced one at a time.

f. Change oil on winch gear and swing gear reducer.

g. Rebuild brakes on both winches.

7.8 Inspection/Testing:

7.8.1 (CHECKPOINT) In the presence of the Military Sealift Command Representative (MSCREP) and the American Bureau of Shipping (ABS) surveyor perform 1.1 time rated load weight test and operational checks of all systems per OEM, SOLAS, and IMO requirements. Set and demonstrate all safety devices and pressure regulators. Acceptance Criteria: All systems are to function to OEM requirements as described in Reference 2.2.

a. The technical representative shall make all adjustments and oversee any repairs.

b. Lower rated weight. Stop and hold the weight 6" above the water for 5 minutes without slippage.

c. Raise the weight and swing each Davit in and out.

d. Stow weight and repeat steps a through c, 3 times.

e. Demonstrate Constant tension winch functions and controls.

f. Submit a written report of all tests and inspections; deliver three copies of certification data stating IMO and SOLAS requirements have been met to the MSCREP and ABS surveyor within twenty-four (24) hours.

7.9 Painting:

7.9.1 Perform an SSPC-SP-11 to ten (10) SqFt of the davit and a SSPC-SP-3 to the remainder. Just prior to applying any coatings accomplish an SSPC-SP-1. Coat davits and painted surfaces of control equipment with one (1) coat of marine grade epoxy and one (1) coat of urethane to match existing paint scheme.

7.10 Manufacturer’s Representative:

7.10.1 A certified OEM representative for the Davit shall be present for all testing and repair work on the Davit

7.11 Preparation of Drawings: None.

8.0 GENERAL REQUIREMENTS: None Additional.