0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc

DOC document 79 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-18-R-4256
Issued by
Department of the Navy Military Sealift Command

About this file

New B Work Item

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
N32205-18-R-4256_Amend_0001.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
JA_N32205-18-R-4256__11_July_2018_Redacted.pdf PDF
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_USNS_ARCTIC_MTA_SOLICITATION.docx DOCX document
SYNOPSIS_N32205-18-R-4256_USNS_ARCTIC.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SOURCES_SOUGHT_FOR_SHIP_REPAIR_ARCTIC_MTA.doc DOC document
Show all 50

USNS ARCTIC Mid-Term Availability has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

HULL, STRUCTURE

N32205-18-R-4256 28 September 2016

ITEM NO. 114

CATEGORY “B”

MSC/N756/JEB

WEATHER DECK DRAIN REPAIR Amend 1

1.0 ABSTRACT

1.1 This item describes the requirements to repair various weather deck drain piping sections throughout the vessel.

2.0 REFERENCES and ENCLOSURES:

2.1 REFERENCES:

2.1.1 NAVSEA Drawing 526-6360591J, Weather Deck Drains Diagram

2.1.2 Surface Preparation Standard, SSPC-SP-10, NEAR WHITE METAL BLAST CLEANING(Contractor must have)

2.1.3 Surface Preparation Standard, SSPC-SP-3, POWER TOOL CLEANING (Contractor must have)

3.0 LOCATION /DESCRIPTION/OUTFITTINGS:

3.1 Location: Various

3.2 Description: None Additional

3.3 Outfitting:

3.3.1 2.5 IPS, Schedule 40, SSL Pipe; 200 linear feet.

3.3.2 Stainless Steel Pipe Hangers; 40 ea.

3.3.3 Deck Drains, 6 each, per Ref 2.1.1

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL: None.

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR's, including but not limited to, GTR's 1 through 7 and 24.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review the other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 All welding Certification, Materials and Procedures shall be in accordance with American Bureau of Shipping (ABS) requirements.

7.0 STATEMENT OF WORK REQUIRED

7.1 Arrangement and outfitting: None Additional

7.2 Structural:

7.3 Mechanical and Fluids

7.3.1 The contractor and MSCREP shall perform a ship tour on day one to identify areas for repair. If more than 200 linear feet is identified, a contract change order shall be issued to cover the access linear footage.

7.3.2 Provide labor and material to replace deteriorated sections of weather deck drain piping. The following requirements apply to all of the piping repairs and surrounding area affected by this work item.

a Obtain required hot work certifications.

b Protect ships equipment and structure and deck coverings from damage in area of work.

c New pipe sections shall be targeted and templated from existing (as found required); and shaped, hung, fitted, and/or flanged as per existing arrangement.

d Estimate that 40 hours of pipe bending and shaping will be required.

e Replace gaskets in all new and disturbed mechanical joints.

f Contractor to replace all disturbed pipe hangers with new CRES hangers using new rubber lining material and new CRES hardware. Hanger replacement shall include hanger legs and support(s).

g Provide safe staging and platforms to work from while accomplishing work. For bidding purposes estimate that thirty feet of staging (total) will be required. If an excess of thirty feet is required, submit condition report and a contract change order shall be negotiated for the additional staging.

h Crop out and install new 2.5 IPS, Schedule 40, stainless steel drain pipe, pipe hangars, brackets, in way of deteriorated areas.

i Grind flush all scabs, scarfs and stubs smooth and flush to decks, bulkheads and structure.

j Estimate 400 hours of pipefitter labor.

k Estimate 80 feet of staging will be required; staging would be used in approximate 10 feet segments.

l Estimate that two deck pass through collars shall be required.

m Estimate 200 hours of firewatch services.

7.4 Electrical: None Additional

7.5 Electronics: None Additional

7.6 Preparation of Drawings and Documents:

7.7 Inspection and Test:

7.7.1 Accomplish the following test to the repaired deck drains:

7.7.2 CHECKPOINT: Perform a Static head hydro test by completely filling repaired deck drain pipe runs. Prove drains are free and clear in the presence of the MSCREP.

7.8 Painting

7.8.1 Grit blast all new pipe, standoffs, pipe hangars, and brackets to provide a 2-4 mil profile prior to installation and paint with contractor furnished inorganic zinc primer, one strip coat of epoxy primer, one full coat of epoxy primer and one full coat of urethane to match surrounding all coats to be 5-6 mils DFT unless specified otherwise in product application guide.

7.8.2 Perform SSPC-SP-3 on disturbed area to be painted. Feather to solid paint and paint all effected, soiled and disturbed area to match surroundings

7.9 Marking:

7.9.1 Replace or restore all markings effected by work under this item

7.10 Manufacturer’s Representative: None

8.0 GENERAL REQUIREMENTS:

8.1 None Additional