0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx

DOCX document 19 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

Revised Work Item 0507

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

T-AOE 8

MACHINERY, AUXILIARY N32205-18-R-4256

28 September 2016

ITEM NO. 507 CATEGORY “A” MSC/N756/JEB

SSDG TURBOCHARGER OVERHAUL_Amend 1

1.0 ABSTRACT:

1.1. This item describes the requirement to overhaul two Ship’s Service Diesel Generator Engines (SSDG) Exhaust Gas Turbocharger.

2.0 REFERENCES/ENCLOSURES:

2.1. ZTL 2613, ABB, Model VTC 254-13 Gas Turbochargers Technical Manual

3.0 LOCATION / DESCRIPTION:

3.1. Location:

3.1.1. Onboard USNS Arctic

3.2. Quantity: Two (2) each, Turbochargers. APL 053990066

3.3. Description:

3.3.1. Manufacturer’s Data:

3.3.2. Mfg. Asea Brown-Boveri (ABB).

3.3.3. Model: VTR 254 14Series.

3.3.4. Caterpillar Part Number: CAT 9Y6101.

4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIAL/SERVICES:

4.1 Government Furnished Equipment: None Additional.

4.2Government Furnished Material:
4.2.1 (2) SSDG Turbocharger: TYPE VTC254-14 / HT 832324.
4.3Government Furnished Services: None Additional.

5.0 NOTES

5.1. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7 and 24.

5.2. The contractor and all subcontractors, regardless of tier, are advised to review the other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Convey each turbocharger from ship to approved contractor shop for overhaul.

7.2. Transport each turbocharger and their associated components to contractors authorized OEM or Caterpillar repair facility. Prepare, package, crate or palletize each turbocharger and components prior to shipment/transport to repair facility.

7.3. Restore each Turbocharger to full OEM factory operating specifications. Accomplish an overhaul to each Turbocharger listed in section 3.0, in accordance with established procedures and recommendations, using references listed in section 2.0 as guidance. All parts associated with accomplishment of a standard overhaul shall be included in bid price.

7.3.1. Contractor shall employ the services of the authorized repair facility to accomplish overhaul work to each Turbocharger.

7.3.2. CHECKPOINT: Disassemble, clean, and lay-out for inspection Turbocharger parts and components. MSCREP or local ABS Surveyor shall inspect. Submit “as-found” condition report.

a. Additional repairs and parts renewals outside of Class-B overhaul, will be the subject of a separate RFP change order.

b. CHECKPOINT: Dynamically balance and align rotors. MSCREP or local ABS Surveyor shall witness. Submit condition report to MSCREP.

7.3.3. Reassemble Turbochargers upon completion of all repairs, inspections, and testing.

7.3.4. The authorized repair facility shall prepare, package, and crate each turbocharger and components to protect each unit for shipment back to ship and storage aboard for upt o three years.

7.4. Preparation of Drawings:

7.4.1. Submit “as-released” report documenting overhaul of Turbocharger to MSCREP Report shall detail the following:

a. Open and inspect results.

b. Inspection and testing completed.

c. Description of all repairs accomplished.

d. List of parts replaced.

7.5. Manufacturer’s Representative and Facility:

7.5.1. Provide the services of an ABB or Caterpillar Turbocharger repair facility to perform Turbocharger overhauls and repair requirements specified in this work item.

8.0 GENERAL REQUIREMENTS: None additional.