0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc

DOC document 72 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

WI 0112

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

HULL, STRUCTURE

N32205-18-R-4256 28 September 2016

ITEM NO. 112

CATEGORY “A”

MSC/N756/JEB

CHT TANKS STEEL REPLACEMENT

1.0

ABSTRACT

1.1 This work item describes the requirements to replace CHT Tank wasted steel.

2.0

REFERENCES

2.1 NAVSEA Drawing 085-6362912, Booklet of General Drawings

2.2 NAVSEA DWG 593-6360567; CHT System Diagram

2.3 NAVSEA DWG 593-6931741; T-AOE 10 FWD CHT Tank (reference only)

2.4 NAVSEA DWG 500-6360751; Aft CHT Tank

2.5 ABS Rules for Building and Classing Steel Vessels, Part 7 (Contractor Obtain).

3.0

ITEM LOCATION / DESCRIPTION

3.1 Item Location

CHT Tanks

Description
Location
100% Capacity

(gals) Area

(sqft)

Fwd CHT Tank
3-161-1-Q
2600
860
Aft CHT Tank
3-605-0-Q
8610
1720

3.2 Item Description/Manufacturers Data

3.2.1 Contractor Furnished Material:

3.2.1.1

20.4 plate, ABS Grade A steel; quantity two hundred (200) sq. ft.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0

NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

5.3 Accomplish the requirements of this Work Item in conjunction with the work described in Work Item 021, 110 and 112.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Perform the requirements of this work requirement following the removal of the coating system is complete (Work Item 110), and thickness measurements have identified areas of wasted steel. (Work Item 1111)

7.2 Gas Free requirements, Safe For Men, Safe for Hot work is provided by Work Item 021.

7.3 Provide fire watch services during all cutting, grinding and welding operations.

7.4 Provide fire protection coverings all equipment associated with CHT Tanks. Fire warp protection shall be inspected and approved by the MSCREP prior to commencement of all cutting, grinding and welding operations.

7.5 Crop out wasted steel identified for replacement by findings of thickness measurements obtained in Work Item 112. For bidding purposes, estimate two hundred square feet of steel will require removal.

7.6 Template replacement inserts to fit identified steel renewal.

7.7 Prepare inserts and fit up all inserts for inspection by ABS and MSCREP, prior to welding. All fit ups shall be callouts.

7.8 Weld inserts to achieve full penetration on both sides of insert. All weld repairs shall be final production weld inspected by ABS and the MSCREP.

7.9 Perform weld integrity testing to the satisfaction of the ABS Surveyor. IF the attending ABS surveyor requires an air test, the air test shall be performed prior to the application of any coating systems.

8.0 GENERAL REQUIREMENTS: None Additional.