0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc

DOC document 79 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-18-R-4256
Issued by
Department of the Navy Military Sealift Command

About this file

WI 0503

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
J_-_2_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0004.docx DOCX document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_0002.docx DOCX document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
N32205-18-R-4256_Amend_0001.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
Q_AND_A_Responses___3.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_USNS_ARCTIC_MTA_SOLICITATION.docx DOCX document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
JA_N32205-18-R-4256__11_July_2018_Redacted.pdf PDF
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N32205-18-R-4256_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_SHIP_REPAIR_ARCTIC_MTA.doc DOC document
Show all 50

USNS ARCTIC Mid-Term Availability has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE 8)

MACHINERY, AUXILIARY

N32205-18-R-4256 28 September 2016

ITEM NO. 503

CATEGORY “A”

MSC/N756/JEB

REPLACE 100 FEET OF PIPING

1.0 ABSTRACT:

1.1. This item describes the replacement of up to one hundred feet of piping, in various locations throughout the ship.

2.0 REFERENCES:

2.1. NAVSEA Drawing 521-6360577; Sea Water Flushing System Diagram.

2.2. NAVSEA Drawing 256-6362969; Sea Water Cooling System Diagram.

2.3. NAVSEA Drawing 521-6360554; Firemain System Diagram.

3.0 ITEM LOCATION/DESCRIPTION: Various locations.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1. The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine their effect on the work items in this work package, which may be effected by the requirements of this item.

5.2. The contractor and all subcontractors, regardless of tier, are advised to review the other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1. Removals:

7.1.1. With the assistance of Ship’s Force Lock Out the affected piping.

7.1.2. Thoroughly drain and dispose of the residual liquids in accordance with the local, state and federal regulations.

7.1.3. Clean each area, gas free, and maintain work site Safe for Workers, Safe for Hot Work for duration of work.

7.1.4. Piping may be below the deck plates or up to eight feet above the deck.

7.1.5. Temporarily remove interferences required to facilitate this repair. Open deck area shall have a safety barrier installed.

7.1.6. Replace piping indentified. References 2.1 through 2.3 are provided for guidance.

a. Contractor is to assume that ten sections of pipe, each Ten (10) feet in length will be replaced. For bidding purposes assume three sections of the piping will be 8 IPS or above and seven sections will be 6 IPS or below. All piping shall be per Mil-T-16420 - 90/10 copper nickel, class 200, seamless.

b. Contractor is to assume that each section of pipe will include installation of two (2) different fittings (elbow, flange or other fitting) and one welded sleeve. All fittings to welded 90/10 CuNi, class 200.

c. All debris and scrap shall be disposed of by the contractor.

7.2. Cover all open pipe immediately to prevent contamination from various sources.

7.2.1. The covers shall be strong, durable material to prevent rupture and shall be securely fastened to prevent them from being dislodged by normal rough handling. A full face gasket shall be in place between the pipe flange and the cover used. Loose-fitting covers (wood plugs or rags) are not satisfactory. A loose cloth, such as a canvas cover, may be used under the following circumstances:

a. The contractor should have all materials assembled to affect repair on site prior to making entry into the system.

b. The opening is under observation while uncovered.

7.3. Installations:

7.3.1. Replace removed piping section using new material of identical size and material. Contractor may pre-fabricate the replacement section of piping in shop using the removed section as a template. ABS certified welders are required for the piping repairs.

7.4. Clean the replaced section piping.

7.5. Surface shall be visually free of grease, oil, flux, scale, dirt, loose particles and any other contamination foreign to the base metal.

7.6. Tap water residues on all metals and light superficial rust on carbon steel surfaces, caused by short time exposure to the atmosphere, are permitted.

7.7. Light dust on cleaned surfaces is not objectionable, provided that the quantity and size of the particle does not adversely affect system operations.

7.8. Inspection/Test:

7.8.1. Hydrostatically test new piping to 150 percent of system working pressure.

7.9. Paint/Lagging:

7.9.1. Renew lagging where old lagging was removed.

7.9.2. Paint all new and disturbed surfaces to match surrounding surfaces.

7.10. Preparation of Drawings: None

7.11. Manufacturer's Representative: None

8.0 GENERAL REQUIREMENTS: None Additional

503-1