0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx

DOCX document 25 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

New A Work Item 0509

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

MACHINERY, AUXILIARY N32205-18-R-4256

28 September 2016

ITEM NO. 509 CATEGORY “A” MSC/N756/JEB

CARGO JP5 FUEL VALVE OVERHAUL(AMEND 1)

1.0 ABSTRACT

1.1 This item describes the requirement to drain fuel, temporarily remove, overhaul and test Cargo JP5 Valves.

2.0 REFERENCES

2.1 NAVSEA Drawing 544-6360562, Cargo JP-5 System Diagram.

2.2 NAVSEA Technical Manual; S6435-M8-MMA-010; Power actuated Butterfly Valve.

3.0 ITEM LOCATION/DESCRIPTION/QUANTITY

3.1 Location: Cargo JP5 Pump Room (7-265-0-E).

3.2 Quantity/Description:

3.2.1 One (1) 20” Butterfly Valves CJPV3

4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR's including but not limited to GTR's 1 through 7, 22, 23, 25 and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review other Work Items under this contract, to determine their effect on the work required under this Work Item. Many of the definitions relating to performance of this Work Item are found in Work Item 001.

6.0 QUALITY ASSURANCE: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 With the assistance of ships force accomplish tag out of equipment identified in section 3.0

7.2 Provide labor and material to drain down the system in preparation for valve removal. Contractor to provide all labor and materials to open, contain, clean-up and dispose of fluids drained from system or the duration of work under this item. (For estimating purposes bid that 2500 gallons of JP-5 will need to drained to facilitate valve removal.)

7.3 Contractor is responsible to blank all openings during performance of work to avoid, entry of grit, dirt, water and other foreign matter. Contractor shall record electrical hook-up information for use when reinstalling valves. Piping blanks shall be installed immediately after valve removal. Piping blanks shall be installed with gaskets to prevent leakage.

7.4 Disconnect electrically and mechanically and convey valve listed in.3.0 to shop.

7.5 Remove valve actuator and disassemble valve. Match mark valve parts.

7.6 Inspect actuators and provide report to MSCREP for recommended repairs.

7.7 (CHECKPOINT): Layout valve components for inspection by MSCREP and CHENG. Following disassembly and inspection of valves, submit a report on all defective conditions found to the MSCREP.

7.8 Straighten stems to within 0.002 inch TIR. Weld build up and machine stems in way of packing glands where required to remove scoring and other damage. Polish stems to 32 RMS.

7.9 Chase and tap all threaded surfaces.

7.10 Replace with new all missing, incorrect and defective studs, nuts and fasteners with new stainless steel material.

7.11 Refurbish valves.

7.12 Dress and true gasket mating surfaces.

7.13 Assemble valve using new contractor furnished, packing, gaskets, seats, and seal rings; all seals, seats and sealing materials shall be OEM unless approved by MSCREP. Deteriorated fasteners shall be equivalent to original and suitable for the intended service.

7.14 Reinstall valve actuators and adjust to provide proper closing of valve, set mechanical, electrical stops, and over-torque stops. Mechanical and electrical stops shall be set to provide for optimum valve seating, final operating torque adjustments shall be made under operating conditions.

7.15 Return valves to ship and reinstall with new gaskets and stainless steel bolting material. Clean and refurbish mating flanges as required. Renew all damaged insulation if any.

7.16 Inspection and Test:

7.16.1 (CHECKPOINT): Hydrostatically test valves at designed test pressure and prove tight in presence of the MSCREP prior to reinstallation aboard ship. Allowable leakage: None

7.16.1.1 Apply test pressure to each side of seat and disc.

7.16.2 (CHECKPOINT): With the assistance of Ship’s Force, carry out an operational test of all disturbed systems to prove tightness of the respective equipment/system to the satisfaction of the CHENG and PPE: Allowable Leakage: None

7.17 Manufacturer's Representative:

7.17.1 Provide the services of an OEM certified Technical Representative to oversee the inspection, testing and setting of all valve/actuator units in this work item. Tech. Representative shall be present during inspection, valve/actuator installation, wiring, and testing.

7.17.2 Suggested Source:

Valve Automation Center of VA POC: Greg Hoitt Phone # 804.752.1000 10 Hill Carter Parkway Ashland, VA 23005

8.0 GENERAL REQUIREMENTS:

0509 - 1