0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx

DOCX document 31 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

New Work Item 0107

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

HULL, STRUCTURE N32205-18-R-4256

28 September 2016

ITEM NO. 107 CATEGORY “A” MSC/N756/JEB

7-105-0-JJ TANK TOP GAUGING AND STEEL REPLACEMENT

1.0 ABSTRACT:

1.1 This item describes the requirement to take ultrasonic thickness readings and provide report to MSCREP and the attending ABS Surveyor. Once readings are reviewed this item replaces section of deteriorated plate.

2.0 REFERENCES:

2.1 ABS Rules for Building and Classing Steel Vessels, Part 7 (Contractor Obtain).

2.2 MSC Drawing No. 085-8385180; Arctic, General Arrangement Plan

2.3 NAVSEA Drawing No. 141-6362169, Assembly 1st Platform

2.4 NAVSEA Drawing No. 501-6359953 – AMR Arrangement

2.5 NAVSEA Drawing No. 801-6360543, Scantling Drawing Fr 35 – Fr 205 01 Lvl and Below

2.6 NAVSEA Drawing No. 180-6362478; FDN Drawing Fr 105 to 165, First Plat

2.7 NAVSEA Drawing No. 500-6361985; Comp Arrg, A2-188, Fr105-165, First Plat, Center

2.8 29198-MAETS-USNS ARCTIC-DWG CONDITION REPORT.

2.9 29198-MAETS-USNS ARCTIC CONDITION REPORT

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location: AMR (4-105-0-E)

3.2 Quantity: 3000 readings total divided as necessary to take readings in AMR as determined by ABS surveyor

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1 through 7.

5.2 The contractor and all subcontractors regardless of tier are advised to review ALL other work items under this contract, to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 The technicians are to be qualified to ASME Code. Qualifications are to be reviewed and approved by MSCREP and attending ABS Surveyor.

NOTE: Use of an ABS approved UT Contractor is mandatory.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1 Clean and gas free requirements for the 7-105-0-JJ Cargo JP5 tank are covered by Work Item 021, Clean and Gas Free Tanks.

7.2 Mark and tag all deck plates in the AMR lower level (not the AMR Pump Room). Remove all deck plates and store in an area not to interfere with ongoing work. All fasteners shall be bagged and tied to each deck plate. Provide condition report for any damaged fasteners found.

7.3 Install caution/warning tape at bottom of ladder well to notify all personnel that deck plates are missing and care should be taken while transiting space.

7.4 Perform joint space inspection with ABS, Hull shop lead men, and MSCREP to identify areas for additional gauging within the 7-105-0-JJ Cargo JP-5 tank.

7.5 Stage 7-105-0-JJ tank to perform requirements of this work item. Work requirement shall be priced to stage entire tank. Initial examination of AMR bilges by contractor, ABS and MSCREP could determine that staging entire tank is not required. The government will seek a credit if it is determined entire tank staging is not required.

7.6 Perform UT thickness readings in AMR Bilges per ABS Rules: (See Para 3.2 for estimating purposes)

7.6.1 The technicians are to be qualified to ASME Code. Qualifications are to be reviewed and approved by MSCREP and attending ABS Surveyor. Qualification shall meet requirements of Reference 2.1; use of an ABS approved UT Contractor is mandatory.

7.6.2 The instruments used are to be calibrated on site with certified blocks acceptable to the ABS.

a. The UT equipment shall have following capabilities:

· Reading through the paint films

· Metal readings shall be accurate within 0.005 of an inch

· Shall be capable of detecting and defining laminations and/or other metal defects.

· Shall be capable of continuous scanning to determine the periphery of deteriorated areas below rejected metal thickness.

7.6.3 See Reference 2.8 and 2.9 for previous thickness readings taken in the #1 & 2 AC Plant Coamings.

7.6.4 Referring to References 2.2 through 2.5, see take thickness readings on the 7-105-0-F tank top, in the bilge well, and on attached frames and stiffeners in the AMR Bilges as described below:

a. For the tank top from Frame 125 to Frame 150 thickness readings shall be taken on a six-inch by six-inch Grid Pattern and on any suspect area identified by inspector, ABS or MSCREP.

· In this region two thickness readings shall be taken on the web and two thickness readings on the face of any hull structural member intersecting the tank top.

· In this region two reading shall be taken on each side and two on the bottom of each bilge well.

· Contractor shall mark location and temporarily remove deck plates and strainer boxes as necessary to support operation.

· The SSDG enclosure area is exempt from this inspection.

7.6.5 Submit an "as found" condition report of the ultrasonic readings taken. This report is to contain detailed sketches of UT reading locations, the original thickness of plating or scantling, the existing thickness as gauged, and the percentage of wastage. Provide a daily report of the rough gauging to MSCREP.

a. Develop composite drawing of the areas performed showing the location of each gauging in relation to the ship's plating, seams or butts, frame number, distance to centerline, height above or below deck, plate number, etc.

b. Final report format shall be acceptable to ABS attending Surveyor

7.7 Accomplish steel bilge plating replacement; also the tank top for 7-105-0-FF, as indicated by readings obtained in Paragraph 7.1 and determined by the MSCREP and attending ABS Surveyor using References 2.3 and 2.7 as guidance

7.7.1 For bidding purposes, the contractor shall estimate that 1000 Sqft of steel replacement in units no less than eight (8) SqFt. Rose boxes in the AMR bilges are included within this square footage.

7.7.2 Provide all labor and material to accomplish work under Paragraph 7.7

a. All steel shall be ABS certified.

b. ABS Surveyor to review material certification prior to steel installation.

c. ABS inspection required of all aspects of installation and materials used. ABS shall witness fit-up prior to root pass and inspect back gouge prior to finish welding section of new plate.

d. Remove piping interferences as required to accomplish bilge plate renewal. Piping sections removed shall be fitted with new gasket material for re-assembly.

e. Install rigging to suspend #1 and 2 Air Conditioning Plants to allow bilge plate renewal in coaming underneath AC Plants. There are 12 installed rigging pad eyes, rated at 4,500 pounds, in the overhead in the vicinity of each AC Plant. Restore when completed.

f. Estimate 400 hours for electrician disconnects and hook ups.

g. Evacuate Air Conditioning Plants for rigging; restore removed refrigerant when plant has been restored.

h. Using Reference 2.6, estimate that four foundations for the Air Conditioning plant shall require to be replaced due to steel wastage.

i. Perform SSPC-SP-10, Blast to Near White Metal all new steel, minimum surface profile following blast shall be 2-4 mil.

j. Prep, prime, and paint new sections using PPG Marine Coating System. Three full and one stripe coat of epoxy shall be applied. Paint Rep to witness processes.

k. Target, template, fit, weld, and install new sections per References in 2.0 and ABS rules.

l. Back gouge, NDT Dye penetrate test, and re-weld

m. Accomplish integrity test; air or other per the requirements of the attending ABS Surveyor

n. Prep, prime, and paint disturbed areas post hot Work (includes opposite/adjacent sides).

7.8 Small areas of substantial or severe corrosion may be repaired by clad welding upon approval of ABS surveyor. Where an area is approved for clad welding it will be the subject to a change order.

7.9 Paint all disturbed surfaces to match surrounding areas.

8.0 GENERAL REQUIREMENTS: None Additional