0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc
DOC document 76 KB Posted
- Attached to
- USNS ARCTIC Mid-Term Availability Federal contract opportunity
- Solicitation number
- N32205-18-R-4256
About this file
Updated 0102
View the file
Other files for this federal contract opportunity
Show all 50
USNS ARCTIC Mid-Term Availability has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS ARCTIC
AOE 8
HULL, STRUCTURE
N32205-18-R-4256 28 September 2016
ITEM NO. 102
CATEGORY “A”
MSC/N756/JEB
REPLACE DECK MACHINERY SHOP OVERHEAD
1.0
ABSTRACT
1.1 This work item describes the requirements to replace the overhead of the 02-395-0-Q, 02-415-0-Q and 02-423-0-Q shop(s).
2.0
REFERENCES
2.1 NAVSEA Drawing 085-6362912, Booklet of General Drawings
2.2 NAVSEA DWG 153-6362283; ASSEMBLY ELEV MCHRY HOUSE ON 02 LEVEL FR 367-435-CL
2.3 NAVSEA DWG 512-6360581 REV H; HVAC DIAGRAM
2.4 NAVSEA DWG 332-6360156 REV D; LIGHTING SYSTEM DECK PLAN 02 LEVEL, FR 395 -455.
2.5 NAVSEA DWG 332-6360155 REV D; LIGHTING SYSTEM DECK PLAN 02 LEVEL, FR 330-395
2.6 ABS Rules for Building and Classing Steel Vessels, Part 7 (Contractor Obtain).
3.0
ITEM LOCATION / DESCRIPTION
3.1 Item Location:
3.1.1 02-395-0-Q Shop Overhead.
3.1.2 02-415-0-Q Shop Overhead.
3.1.3 02-423-0-Q Shop Overhead.
3.2 Item Description/Manufacturers Data
3.2.1 Contractor Furnished Material:
3.2.1.1
10.2 plate, ABS Grade A steel; per Ref 2.2, sheet 4, List of Structural Elements, ID 003. (Four 34’6” Plates)
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
4.1 Government Furnished Equipment: None Additional.
4.2 Government Furnished Material:
| Amercoat 240 oxide red |
| 15 G |
| Amercoat 240 dark gray |
| 15 G |
| Amercoat 385 ASA mid graphite gray |
| 20 G |
| T-10 |
| 10 G |
| Amercoat 240 Oxide Red |
| 15 G |
| Amercoat 240 Haze Gray |
| 15 G |
4.3 Government Furnished Services: PPG Paint Representative
5.0
NOTES
5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.
5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Provide labor, rigging support, staging, tools, welding and cutting equipment to perform the requirements of this work specification.
7.2 Provide Gas Free Safe for Hot Work certification for the areas identified in Para 3.1. and surrounding areas necessary to perform cutting, grinding and welding.
7.3 Provide fire watch services during all cutting, grinding and welding operations.
7.4 Provide fire protection coverings all equipment located inside of the shops that are included in Para 3.1. Fire wrap protection shall be inspected and approved by the MSCREP prior to commencement of all cutting, grinding and welding operations.
7.5 Remove all underlying interferences including, but limited too, insulation, HVAC ductwork, cables required to remove the shop overheads in their entirety. See References 2.2, 2.3 and 2.4.
7.5.1 Submit a condition report of pre-existing condition of overhead insulation.
7.6 Crop overhead of shops listed in Para 3.1. See Reference 2.2 for dimensions. The three shops are contained within one structural enclosure.
7.6.1 Dispose of removed steel.
7.7 Provide a weatherproof temporary covering while sections of the overhead steel is removed. Rain and snow shall not leak into the space. The temporary covering shall be put in place at the end of each shift. Any flooding or weather caused damage to the internal shop equipment/tools shall be repaired/replaced at the contractor’s expense. Weather proof temporary covers shall be visibly marked at temporary and not suitable for transit.
7.8 Template replacement overhead plating to align with underlying structure. Original design camber shall be maintained.
7.9 Prepare overhead plating for fit up inspections by ABS and MSCREP, prior to welding. All fit ups shall be callouts.
7.10 Weld overhead plating achieve full penetration on both sides of plating. All welds shall be final production weld inspected by ABS and the MSCREP.
7.11 Perform weld integrity testing to the satisfaction of the ABS Surveyor.
7.12 Surface prep newly installed overhead plates on both sides.
7.13 Prime newly installed overhead plates on both sides. Surface preparations and paint application shall be performed to the satisfaction of the MSC Paint representative.
7.14 Paint overhead interior with PPG Interior Paint provided as GFM.
7.15 Paint overhead exterior with GFM provided non slip paint.
7.16 Maintain daily cleanliness of work site throughout the entire course of this work requirement.
7.17 Restore all interferences and insulation.
8.0 GENERAL REQUIREMENTS: None Additional.