0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc

DOC document 76 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-18-R-4256
Issued by
Department of the Navy Military Sealift Command

About this file

Updated 0102

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_2_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
N3220518R4256_0002.docx DOCX document
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
0115_B_Steel_Renewal_Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
Q_AND_A_Responses___3.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_USNS_ARCTIC_MTA_SOLICITATION.docx DOCX document
JA_N32205-18-R-4256__11_July_2018_Redacted.pdf PDF
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N32205-18-R-4256_USNS_ARCTIC.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SOURCES_SOUGHT_FOR_SHIP_REPAIR_ARCTIC_MTA.doc DOC document
Show all 50

USNS ARCTIC Mid-Term Availability has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

AOE 8

HULL, STRUCTURE

N32205-18-R-4256 28 September 2016

ITEM NO. 102

CATEGORY “A”

MSC/N756/JEB

REPLACE DECK MACHINERY SHOP OVERHEAD

1.0

ABSTRACT

1.1 This work item describes the requirements to replace the overhead of the 02-395-0-Q, 02-415-0-Q and 02-423-0-Q shop(s).

2.0

REFERENCES

2.1 NAVSEA Drawing 085-6362912, Booklet of General Drawings

2.2 NAVSEA DWG 153-6362283; ASSEMBLY ELEV MCHRY HOUSE ON 02 LEVEL FR 367-435-CL

2.3 NAVSEA DWG 512-6360581 REV H; HVAC DIAGRAM

2.4 NAVSEA DWG 332-6360156 REV D; LIGHTING SYSTEM DECK PLAN 02 LEVEL, FR 395 -455.

2.5 NAVSEA DWG 332-6360155 REV D; LIGHTING SYSTEM DECK PLAN 02 LEVEL, FR 330-395

2.6 ABS Rules for Building and Classing Steel Vessels, Part 7 (Contractor Obtain).

3.0

ITEM LOCATION / DESCRIPTION

3.1 Item Location:

3.1.1 02-395-0-Q Shop Overhead.

3.1.2 02-415-0-Q Shop Overhead.

3.1.3 02-423-0-Q Shop Overhead.

3.2 Item Description/Manufacturers Data

3.2.1 Contractor Furnished Material:

3.2.1.1

10.2 plate, ABS Grade A steel; per Ref 2.2, sheet 4, List of Structural Elements, ID 003. (Four 34’6” Plates)

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment: None Additional.

4.2 Government Furnished Material:

Amercoat 240 oxide red
15 G
Amercoat 240 dark gray
15 G
Amercoat 385 ASA mid graphite gray
20 G
T-10
10 G
Amercoat 240 Oxide Red
15 G
Amercoat 240 Haze Gray
15 G

4.3 Government Furnished Services: PPG Paint Representative

5.0

NOTES

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

5.2 The contractor and all subcontractors regardless of tier are advised to review the other work items under this contract to determine their effect on the work required under this work item.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Provide labor, rigging support, staging, tools, welding and cutting equipment to perform the requirements of this work specification.

7.2 Provide Gas Free Safe for Hot Work certification for the areas identified in Para 3.1. and surrounding areas necessary to perform cutting, grinding and welding.

7.3 Provide fire watch services during all cutting, grinding and welding operations.

7.4 Provide fire protection coverings all equipment located inside of the shops that are included in Para 3.1. Fire wrap protection shall be inspected and approved by the MSCREP prior to commencement of all cutting, grinding and welding operations.

7.5 Remove all underlying interferences including, but limited too, insulation, HVAC ductwork, cables required to remove the shop overheads in their entirety. See References 2.2, 2.3 and 2.4.

7.5.1 Submit a condition report of pre-existing condition of overhead insulation.

7.6 Crop overhead of shops listed in Para 3.1. See Reference 2.2 for dimensions. The three shops are contained within one structural enclosure.

7.6.1 Dispose of removed steel.

7.7 Provide a weatherproof temporary covering while sections of the overhead steel is removed. Rain and snow shall not leak into the space. The temporary covering shall be put in place at the end of each shift. Any flooding or weather caused damage to the internal shop equipment/tools shall be repaired/replaced at the contractor’s expense. Weather proof temporary covers shall be visibly marked at temporary and not suitable for transit.

7.8 Template replacement overhead plating to align with underlying structure. Original design camber shall be maintained.

7.9 Prepare overhead plating for fit up inspections by ABS and MSCREP, prior to welding. All fit ups shall be callouts.

7.10 Weld overhead plating achieve full penetration on both sides of plating. All welds shall be final production weld inspected by ABS and the MSCREP.

7.11 Perform weld integrity testing to the satisfaction of the ABS Surveyor.

7.12 Surface prep newly installed overhead plates on both sides.

7.13 Prime newly installed overhead plates on both sides. Surface preparations and paint application shall be performed to the satisfaction of the MSC Paint representative.

7.14 Paint overhead interior with PPG Interior Paint provided as GFM.

7.15 Paint overhead exterior with GFM provided non slip paint.

7.16 Maintain daily cleanliness of work site throughout the entire course of this work requirement.

7.17 Restore all interferences and insulation.

8.0 GENERAL REQUIREMENTS: None Additional.

102-1