0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc

DOC document 167 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

Revised Work Item 0021

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx DOCX document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

T-AOE 8

GENERAL REQUIREMENTS

N32205-18-R-4256

25 FEBRUARY 2014

ITEM 021

CATEGORY “A”

MSC/PO1B/REV FEB 14

CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS & SPACE (Amend 1)

1.0 ABSTRACT

1.1 This work item describes the requirement to open, clean, gas-free, maintain, and close miscellaneous tanks, voids, cofferdams, and spaces. Storage of re-usable fuel and lube oils is also required.

2.0 REFERENCES/ENCLOSURES

2.1 References

2.1.1 NAVSEA Drawing 801-6360502 A, Capacity Plan

2.1.2 NAVSEA Drawing 803-7489380 A, Trim & Stability Booklet

2.2 Enclosures

2.2.1 USNS ARCTIC (T-AOE-8) List of Applicable Tanks, Voids and Cofferdams

3.0 ITEM LOCATION/DESCRIPTION: See Enclosure 2.2.1.

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL: None.

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s, including but not limited to, GTR’s 1 through 7, 22, 23, and 29.

5.2 The contractor and all subcontractors, regardless of tier, are advised to review all other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to the performance of this Work Item are found in Work Item 001.

5.3 In the event that any tank contents are deemed to be hazardous wastes in accordance with federal, state and local (CONUS) or international (OCONUS) standards, the costs for handling and disposal of those wastes shall be covered under work item 023 of this work package.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1 Tank coating system conditions shall be identified and documented by the contractor during tank surveys. ABS surveyor shall receive a copy of contractor’s reports.

7.0 STATEMENT OF WORK REQUIRED:

7.1 It is the contractor’s responsibility to analyze and properly plan tank unloading procedures to ensure that no undue stresses are imposed on the vessel structure. Ship’s force and MSCREP will assist contractor with ship loading documents and software. The contractor shall utilize the services of a Naval Architect or structural engineer to support this planning. The contractor shall provide their tank unloading plan to the MSCREP at least 2 business days prior to starting this work to permit review and approval by MSC Naval Architect.

7.2 Contractor and Ships Force shall take, record, and verify soundings of all tanks listed in enclosure 2.2.1, on arrival at the contractor’s facility. Chief Engineer shall review and endorse all soundings taken/recorded. Submit copy of endorsed record to the MSCREP.

7.3 Provide a clean storage facility with a capacity of approximately 0 tons (0 gal) of fuel oil, 0 tons (0 gal) of JP-5 and 0 tons (0 gal) of lube oil. Contractor designated storage facility shall be inspected by the MSCREP for cleanliness and acceptability prior to any transferring of fuel oil and lube oil. Prior to off loading of liquids, samples shall be taken by the contractor of each of the tanks to be moved to temporary storage. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately. Upon completion of transferring of liquids, the contractor, in conjunction with ship's force, shall validate quantities at the storage facility.

7.3.1 In the event that contamination is suspected, a change order will be issued to the contractor to have a laboratory analysis conducted on the sample.

7.4 Removals: The ship will pump down tanks to low suction, either to other tanks onboard or to shore storage facilities. In the event that the tank contents are being moved off the ship, the contractor shall provide support to the vessel, including all hoses and manpower on the shore side to accomplish this removal. Contractor shall be responsible to provide all pumps, hoses, fittings and personnel to safely remove all remaining tank contents as identified in enclosure 2.2.1. Applicable federal, state, local or international procedures for transferring fuel and lube oils over water shall be followed by the contractor. Contents to be temporarily stored are indicated in the enclosure. All other liquids shall be disposed of in accordance with local, state, federal and/or international regulations. In some states, the presence of oil in the wash water may deem the mixture to be hazardous waste. When pricing this item, the contractor shall assume that oil is present in the tank wash water. The cost for disposal of the mixture shall be included in the price quote regardless of whether or not, due to the presence of oil, the wash water is deemed hazardous waste or non-hazardous waste. If the mixture is determined to be hazardous waste due to some contaminant other than oil, the procedures outlined in Item 0023 shall be used for the identification, handling and disposal. The costs for removal are still part of this (WI 021) work item. All other costs for offload and disposal shall be captured in this work item.

7.5 When directed by the MSCREP, return all fuel oil and lube oil to the vessel. Prior to returning of liquids, the contractor, together with ship's force, shall take samples of all stored liquids. These samples shall be turned over to the Chief Engineer. Each sample bottle shall be labeled with temporary storage tank taken from, contents, and date taken. Any visual indications of contamination shall be brought to the attention of the MSCREP immediately.

7.6 Accomplish the following for each tank/space listed in enclosure 2.2.1:

7.6.1 Open manholes and erect/maintain safety guards over openings.

7.6.2 Temporarily provide blowers and ventilate tanks and spaces, inclusive of confined areas around manhole covers.Ventilation of the tanks shall be accomplished so as to prevent tank fumes from exhausting in the interior compartments of the ship.

7.6.3 Temporarily provide and maintain, as required, tank lamping/lighting. Lighting shall be explosion proof, safety type lights.

7.7 Clean and Gas Free tanks and spaces listed in enclosure 2.2.1. Cleaning shall completely remove all traces of dirt, sludge, debris and liquids. All tanks and spaces shall be presented in a clean and dry condition and shall be ready to be certified and maintained “Safe for Men/Safe for Hot Work”. The provision of gas free certificates is covered under work item 020 of this work package.

7.7.1 Where a battery of tanks is designated for cleaning and gas freeing, all interior spaces in way of same, such as cofferdams, voids, bilges, bilge wells and other spaces, even if not specifically mentioned, shall be considered as being included as spaces to be cleaned and gas freed.

7.7.2 For all tanks and spaces indicated in enclosure 2.2.1, air vents, sounding tubes, filling and suction lines and other appurtances shall be included for cleaning and gas freeing. Secondary manhole covers for each tank shall also be opened.

7.7.3 Post Original Gas Free Certification at each Tank/Space Location. Certificate shall be mounted directly at the tank/space manhole entrance.

7.7.4 Post copy of Gas Free Certificates at the designated gangway access to the vessel. Certifications posted at gangway shall be in a protective weather/water proof enclosure that is accessible and visible.

7.8 Surveys and testing requirements for these tanks shall be addressed in other work items in this work package.

7.9 At the conclusion of all required work, conduct a final closeout inspection for each tank/space listed in enclosure 2.2.1 with the MSCREP. No tank shall be closed until a final inspection is accomplished with the MSCREP in attendance.

7.9.1 Contractor is responsible for repairing all tank coating damage caused by work in this solicitation work package. During close out inspection, if coatings are found damaged by contractor’s work, contractor shall repair damaged areas prior to final close out of tank/space, at contractor’s expense. Damaged coatings shall be repaired in accordance with MSC paint system and the paint representative’s recommendations.

7.9.2 Ensure all blowers, lighting, staging, tools, and miscellaneous equipment are removed prior to the final inspection. Any staging necessary for MSCREP close out inspection shall be removed just prior to final acceptance close out of tank/space.

7.9.3 Present Tank in “Final” clean condition. No dirt, dust, debris or liquids shall be allowed. Any tank or space failing the close out inspection, shall be re-cleaned until passing MSCREP inspection (repeated cleanings and inspections will be at contractor expense, and may become subject to issuance of a QDR).

7.10 Upon acceptance of final closeout inspection and by direction of the MSCREP, reinstall manhole covers using new gaskets, grommets, and wicking. Submit a Condition Found Report for any missing or damaged fasteners or hardware.

7.11 The following tanks and spaces, included in enclosure 2.2.1, shall be opened, cleaned and prepared for gas free certification within 20 days of the shipyard availability start:

· Shaft Alley (7-565-1-Q)

· MMR-1 (7-455-0-E)

· MMR-2 (7-510-0-E)

· JP-5 Pump room (7-205-0-E)

· DFM Pump room (7-395-0-E)

· AMR

(3-105-0-E)

· AMR Pump Room (6-132-0-E)

· Forward MSD Space (3-183-1-A)

· Forward CHT Space (3-161-1-Q)

· Aft MSD Space (2-667-1-A)

· Aft CHT Space (3-605-0-Q)

· Elevator Trunk Pits No. 1 thru No. 7

· Conveyor Trunk Pits No. 1 thru No. 4

· Also, Any/all sub-bilge level voids, trunks, cofferdams, rose boxes, bilge wells, and other drainage collection pits throughout the vessel.

7.12 Required Deliverable Report: Contractor shall create, maintain, update, and submit weekly during the progress meeting, a tank/space work matrix. This matrix shall contain the following information:

A.
Tank/Space Name
B.
Tank/Space Location Designation
C.
Date Tank/Space Opened
D.
Date Gas Free Cleaning Started
E.
Date Gas Free Cleaning Completed
F.
Date Gas Free Cert. Received
G.
Date ABS Initial Structural Survey Complete
H.
Date Air Test/Hydro Test Completed
I.
Date Final Tank/Space Cleaning Started
J.
Date Final Tank/Space Cleaning Completed
K.
Date Tank/Space Final Close
L.
Tank/Space Related Repair Status: List major job sequence within a tank/space followed by date start & date completed (such as below):

* Access Cuts -> Date Removed/Date Installed No Acess cut shall be made without first notifing MSCREP

* Blasting -> date start/date complete

* Painting -> date start/date complete

* Related work items internal repairs (pipe, valve, structure, etc)

* Related work items external repairs (welding, UT’s, zincs, other structural related; etc.)

* Fluids added/removed from tank/space (pot water chlorination; Undocking Stability; fuels/oils; etc.)

M.
Other

7.13 Paint all disturbed surfaces to match surroundings.

7.14 Preparation of Drawings: None.

7.15 Manufacturer's Rep: None.

8.0 GENERAL REQUIREMENTS: None Additional

NOTE: Tank Arrival Conditions “FOR INFORMATION ONLY”.

ENCLOSURE 2.2.1 – USNS ARCTIC (T-AOE 8) TANKS, VOIDS, AND COFFERDAMS

Cargo Oil (DFM) Tanks

Description
Tank Location
95% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(7-65-0-FF)
65-105
319390
44943
-
(7-430-0-FF) CONTAM CLT
430-455
23520
3310
-

(7-425-2-FF)

(7-245-0-FF)

(7-425-1-FF)

Cargo JP-5 Tanks

Description
Tank Location
95% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(7-105-0-JJ)
105-150
367017
51645
-
(7-265-2-JJ)
265-297(P)
217475
30602
-

(7-265-1-(JJ)

(7-205-0-JJ/CONTAM CLTG
205-210
17607
2478
-

Convertible Tanks

Description
Location
95% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(7-150-0-FF/JJ)
150-205
752167
105843
-

FESHWATER TANKS

Description
Location
100% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(4-477-2-W) RESERVE
477-488(P)
1659
223
(4-510-1-W) RESERVE
510-521(S)
1622
217

Sewage Tanks

Description
Location
100% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

Fwd CHT Tank
3-161-1-Q
2025
--
Aft CHT Tank
3-605-0-Q
8610
--

SHIP FUEL OIL TANKS

Description
Location
95% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(3-565-1-F) AUXILIARY
565-580(S)
5171
728
(3-565-4-F) AUXILIARY
565-580(P)
5171
728
(2-435-1-F)
435-445(S)
5171
728
(2-435-2-F)
435-445(P)
5171
728
(5-580-1-F)
580-605(S)
57242
8055
(5-580-2-F)
580-605(P)
57243
8055
(4-605-1-F)
605-625(S)
39865
5610
(4-605-2-F)
605-625(P)
39865
5610
(4-625-1-F)
625-685(S)
104573
14715
(4-625-2-F)
625-685(P)
104574
14715
(4-685-0-F)
685-AE(C)
132678
18670
(3-685-1-F)
685-AE(P)
26861
3780
(3-685-2-F)
685-AE(S)
26862
3780

Lube Oil Tanks

Description
Tank Location
95% Capacity

(gals) Area

(cu- ft) Arrival

Condition

(2-114-2-F) AUX STOR
114-123(P)
1066
150
(3-502-1-F) RDCN GR STOR
502-510(S)
821
115
(3-502-3-F) RDCN GR STOR
502-510(S)
821
115
(3-502-5-F) RDCN GR STOR
502-510(S)
964
136
(3-502-7-F) RDCN GR STOR
502-510(S)
964
136
(3-502-9-F) RDCN GR STOR
502-510(S)
964
136
(3-502-11-F)RDCN GR STOR
502-510(S)
964
136
(3-510-2-F) RDCN GR STOR
510-518(P)
821
116
(3-510-4-F) RDCN GR STOR
510-518(P)
821
116
(3-510-6-F) RDCN GR STOR
510-518(P)
964
136
(3-510-8-F) RDCN GR STOR
510-518(P)
964
136
(3-510-10-F)RDCN GR STOR
510-518(P)
964
136
(3-510-12-F)RDCN GR STOR
510-518(P)
964
136
(4-502-1-F) SSDG STOR
502-510(S)
964
136
(4-502-3-F) SSDG STOR
502-510(S)
964
136
(4-502-5-F) RDCN GR STLG
502-510(S)
997
140
(4-502-7-F) RDCN GR STLG
502-510(S)
997
140
(4-502-9-F) RDCN GR STLG
502-510(S)
997
140
(4-502-11-F)RDCN GR STLG
502-510(S)
997
140
(4-502-13-F)RDCN GR STLG
502-510(S)
997
140
(4-510-2-F)SSDG STOR
510-518(P)
964
136
(4-510-4-F)SSDG STOR
510-518(P)
964
136
(4-510-6-F)RDCN GR STLG
510-518(P)
997
140
(4-510-8-F)RDCN GR STLG
510-518(P)
997
140
(4-510-10-F)RDCN GR STLG
510-518(P)
997
140
(4-510-12-F)RDCN GR STLG
510-518(P)
997
140
(4-510-14-F)RDCN GR STLG
510-518(P)
997
140

Ship JP-5 Tanks

Description
Tank Location
95% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(3-445-2-J) SERVICE
445-455(P)
5171
728
(3-445-4-J) SERVICE
445-455(P)
5171
728

Miscellaneous Tanks

Description
Tank Location
95% Capacity

(gals) Area

(cu-ft) Arrival

Condition

(Ltons)

(4-132-2-F) USED OIL
132-141(P)
1273
179

Voids

7-510-0-V

Misc. Spaces

Description
Location
Area

(sqft)

MMR #1 Bilge

MMR #2 Bilge

Shaft Alley

JP-5 Pump Room Bilge

DFM Pump Room Bilge

AMR Bilge
3-105-0-E
-
AMR Pump Room Bilge
6-132-0-E
-
Elevator Trunk Pit #1
Bottom 4-225-0-T
-
Elevator Trunk Pit #2
Bottom 4-249-0-T
-
Elevator Trunk Pit #3
Bottom 5-265-0-T
-
Elevator Trunk Pit #4
Bottom 5-302-0-T
-
Elevator Trunk Pit #5
Bottom 5-330-0-T
-
Elevator Trunk Pit #6
Bottom 5-367-0-T
-
Elevator Trunk Pit #7
Bottom 5-545-0-T
-
Package Conveyor Pit #1 (SD STRM NO 1)
2-100-2-T
-
Package Conveyor Pit #2
2-455-3-T
-
Package Conveyor Pit #3
3-577-2-T
-
Pallet Conveyor Pit
4-395-0-AA
-
DSN-450 Doppler Speed Log Xdcr Trunk
7-145-1-Q
AN/UQN-4 Xdcr & Underwater Log Trunk
7-210-1-Q
Forward CHT Space
3-161-1-Q
Aft CHT Space
3-605-0-Q
Forward MSD Space
3-183-1-E
Aft MSD Space
2-667-1-A

021-1