0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc

DOC document 99 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability Federal contract opportunity
Solicitation number
N32205-18-R-4256
Issued by
Department of the Navy Military Sealift Command

About this file

Revised Work item 0103

View the file

Other files for this federal contract opportunity

Other files attached to USNS ARCTIC Mid-Term Availability, newest first.
File Type Posted
J_-_2_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0004.docx DOCX document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_0002.docx DOCX document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
N32205-18-R-4256_Amend_0001.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
Q_AND_A_Responses___3.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_8_Request_for_Spec_Clarification.doc DOC document
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_USNS_ARCTIC_MTA_SOLICITATION.docx DOCX document
J_-_12_Past_Performance_Data.doc DOC document
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
JA_N32205-18-R-4256__11_July_2018_Redacted.pdf PDF
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
SYNOPSIS_N32205-18-R-4256_USNS_ARCTIC.docx DOCX document
SOURCES_SOUGHT_FOR_SHIP_REPAIR_ARCTIC_MTA.doc DOC document
Show all 50

USNS ARCTIC Mid-Term Availability has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T AOE 8)

HULL, STRUCTURE

N32205-18-R-4256 28 September 2016

ITEM NO. 103

CATEGORY “A”

MSC/N756/JEB

abs Tank inspection and Testing (Amend 1)

1.0 ABSTRACT:

1.1. This item describes internal and boundary inspection of tanks.

2.0 REFERENCES/ENCLOSURES:

2.1 References:

2.1.1 ABS Rules for Building and Classing Steel Vessels, Part 7

2.1.2 NAVSEA Drawing 085-6360536 Rev -, Booklet Of General Drawings Cover Sheet And General Information

2.1.3 NAVSEA Drawing 167-6362019 Rev J, List of Tank Cleaning Openings

2.1.4 NAVSEA Drawing 544-6360562 Rev K, Cargo JP-5 System Diagram

2.1.5 NAVSEA Drawing 544-6360561 Rev L, Cargo Oil System Diagram

2.2 Enclosure:

2.2.1 USNS Arctic Tank Testing List

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location: Various.

3.2. Item Description/Manufacturer's Data: None

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1. The contractor and all subcontractors, regardless of tier, must consult the General Technical Requirements (GTR) to determine applicability to this Work Item. In performance of this Work Item, the contractor and all subcontractors, regardless of tier, must comply with the requirements of all applicable GTR’s.

5.2. The contractor and all subcontractors, regardless of tier, are advised to review other Work Items under this contract to determine their effect on the work required under this Work Item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3. Tank testing requirements identified in Paragraph 7 may be accomplished in any order or concurrently provided that all boundaries of all spaces are tested. Contractor shall not be compensated for multiple fill and discharge of individual tanks unless subject tanks had failed first tank boundary inspection.

5.4. The requirements for tank entry/closure, lighting and maintenance of gas free certificates are described and covered under Work Item 021.

6.0 QUALITY ASSURANCE REQUIREMENTS:

6.1. Accomplish tank internal inspections prior to the boundary testing of each individual tank.

7.0 STATEMENT OF WORK REQUIRED:

7.1. Perform overall tank surveys on the tanks listed in Enclosure 2.2.1, accompanied by the MSCREP and ABS.

7.1.1 Schedule and attend each tank internal inspection and boundary testing accomplished by MSCREP and ABS. Once complete submit “As Found” conditions report for each inspected tank. Multiple tanks may be included in a single report.

7.1.2 Inspect all sounding tubes for blockage and debris by taking a tank sounding with a sounding tape. The sounding tube measurement shall be included in the tank inspection report (QA Ticket).

7.2. Develop a testing procedure to accomplish boundary testing using pressure drop test method. Minimum requirements for testing shall include:

7.2.1. Prepare the tank for pressurized testing by installing gaskets on tank top entries.

7.2.2. Blank off tank and stripping pump bellmouths. Blanks shall be catalogued on the Tank Test Matrix. Once testing is completed, remove all blanks from pump suctions. It will be required to remove fencing around cargo tank suction wells therefore this labor is to be included in the work item pricing. Should the contractor choose to not blank the pump suctions, the government shall not be held responsible for system valve leakage resulting in the tank resulting to hold pressure.

7.2.3. Pressurize each individual tank with air to a pressure not greater than 2.0 psi and maintain/hold the pressure for 30 minutes.

7.2.4. A U-tube manometer with a height sufficient to hold a head of water corresponding to the required test pressure shall be arranged and installed to show tank air pressure. The cross sectional area of the U-tube is to be not less than that of the pipe supplying air. In addition to the U-tube, a certified master gauge or other certified approved means is to be provided to verify the pressure show on the U-tube.

7.2.5. Method of accounting for any blanks and plugs installed at each tank/space location.

7.2.6. Method for monitoring the tank for over pressurization, including location and number of personnel to be assigned.

7.2.7. A detailed schedule for accomplishing internal inspections and boundary testing of each tank.

7.2.8. Submit two copies of test procedure log prior to planned commencing of boundary inspections for acceptance and review by MSCREP and ABS Surveyor. Make changes in procedure based on feedback. Testing shall not commence until approval of procedure is obtained from MSCREP and ABS.

7.3. (CHECKPOINT) Once all known work affecting boundary tightness has been completed. Accomplish pressure drop test for all tanks listed in Ref 2.6, in accordance with the guidelines contained in Para 7.3 and 7.5

7.3.1. Examine all boundaries and associated penetrations, all platforms, ladders, and handrails along with their corresponding securements for structural integrity.

7.3.2. Submit an as found report for any discrepancies; if none are discovered, the QA check point sheet shall act as the record of completion.

7.4. Preparation of Drawings: Maintain an accurate accounting of each tank boundary requiring inspection and the status of completion of the tank boundary inspection. This shall be available for review by both contractor and MSCREP.

7.5. Tanks that are not directly related to other work in the package shall be opened, cleaned, inspected, tested and closed in a timely manner.

7.5.1. All tanks opened for survey and air testing only shall have no prolonged periods of inactivity. There shall be a period of no more than three days of no work being accomplished towards cleaning, inspecting, testing and closing.

7.5.2. All tanks opened, for survey and air testing only, shall remain open for a period of no more than fourteen days. This time period is waivable when additional work inside the tank is discovered and activated by a negotiated contract change order.

7.6 Lube Oil Storage and Settling Tanks.

7.5.3. Ship’s force will transfer lube oil to accomplish checkerboard of tanks.

7.5.4. For bidding purposes, estimate that all tanks shall require open and inspect. Tanks that are not opened due to negotiations with ABS shall be subject to a credit to the government.

7.5.5. Lube Oil Storage and Settling Tanks shall be surveyed only; no pressure tests will be conducted.

8.0 GENERAL REQUIREMENTS: None.

ENCLOSURE 2.2.1

USNS ARCTIC TANK TESTING LIST

TANK
OVERALL SURVEY
AIR/PRESSURE TEST
7-65-0-FF (DFM)
YES
YES
7-430-0-FF (DFM)
YES
YES
7-105-0-JJ (JP5)
YES
YES
7-265-2-JJ (JP5)
YES
YES
7-205-0-JJ/CONTAM
YES
YES
7-150-0-FF/JJ
YES
YES
7-245-0-FF
YES
YES
7-425-1-FF
YES
YES
4-477-2-W
YES
YES
4-510-1-W
YES
YES
FWD CHT
YES
CONDITIONAL ON STEEL REPAIR REQUIRED
AFT CHT
YES
CONDITIONAL ON STEEL REPAIR REQUIRED
3-565-1-F
YES
YES
3-565-4-F
YES
YES
2-435-1-F
YES
YES
2-435-2-F
YES
YES
5-580-1-F
YES
YES
5-580-2-F
YES
YES
4-605-2-F
YES
YES
4-605-1-F
YES
YES
4-625-1-F
YES
YES
4-625-2-F
YES
YES
4-685-0-F
YES
YES
3-685-1-F
YES
YES
3-685-2-F
YES
YES
3-445-2-J
YES
YES
3-445-4-J
YES
YES
4-132-2-F
YES
YES
7-510-0-V (VOID)
YES
NO

Enclosure 2.2.1 continued.

Lube Oil Tanks

Description
Tank Location
95% Capacity

(gals) Area

(cu- ft) Arrival

Condition

(2-114-2-F) AUX STOR
114-123(P)
1066
150
(3-502-1-F) RDCN GR STOR
502-510(S)
821
115
(3-502-3-F) RDCN GR STOR
502-510(S)
821
115
(3-502-5-F) RDCN GR STOR
502-510(S)
964
136
(3-502-7-F) RDCN GR STOR
502-510(S)
964
136
(3-502-9-F) RDCN GR STOR
502-510(S)
964
136
(3-502-11-F)RDCN GR STOR
502-510(S)
964
136
(3-510-2-F) RDCN GR STOR
510-518(P)
821
116
(3-510-4-F) RDCN GR STOR
510-518(P)
821
116
(3-510-6-F) RDCN GR STOR
510-518(P)
964
136
(3-510-8-F) RDCN GR STOR
510-518(P)
964
136
(3-510-10-F)RDCN GR STOR
510-518(P)
964
136
(3-510-12-F)RDCN GR STOR
510-518(P)
964
136
(4-502-1-F) SSDG STOR
502-510(S)
964
136
(4-502-3-F) SSDG STOR
502-510(S)
964
136
(4-502-5-F) RDCN GR STLG
502-510(S)
997
140
(4-502-7-F) RDCN GR STLG
502-510(S)
997
140
(4-502-9-F) RDCN GR STLG
502-510(S)
997
140
(4-502-11-F)RDCN GR STLG
502-510(S)
997
140
(4-502-13-F)RDCN GR STLG
502-510(S)
997
140
(4-510-2-F)SSDG STOR
510-518(P)
964
136
(4-510-4-F)SSDG STOR
510-518(P)
964
136
(4-510-6-F)RDCN GR STLG
510-518(P)
997
140
(4-510-8-F)RDCN GR STLG
510-518(P)
997
140
(4-510-10-F)RDCN GR STLG
510-518(P)
997
140
(4-510-12-F)RDCN GR STLG
510-518(P)
997
140
(4-510-14-F)RDCN GR STLG
510-518(P)
997
140

103-1

File details come from the government source that posted it.