0002_A_TECHNICAL_AND_MANUFACTURER_REPRESENTATIVES_REV_08Nov17.docx

DOCX document 34 KB Posted

Attached to
USNS ARCTIC Mid-Term Availability
Solicitation number
N32205-18-R-4256
Issued by

About this file

updated 0002

View the file

Other files

File Type Posted
N3220518R4256_AMEND_0004.docx DOCX document
0113_B_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_3.doc DOC document
0115_B_Steel_Renewal_Amend_3.doc DOC document
J_-_2_Amended_Rev_3.xls XLS spreadsheet
J_-_3_B_Items_Amended_Rev_3.xls XLS spreadsheet
J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
N3220518R4256_AMEND_0003.docx DOCX document
N3220518R4256_0002.docx DOCX document
604_A_LIFE_RAFT_CERTIFICATION_REV-A.doc DOC document
Work_Item_604_S9086-TX-STM-010_7_0.pdf PDF
Work_Item_604_MSFSC_SWIRRR_002.docx DOCX document
0115_B_Steel_Renewal_Amend_1.doc DOC document
REVISED_J_-_3_Category_B_Items_ARCTIC.xls XLS spreadsheet
0113_A_REPLACE_SOUNDING_TUBE_DECK_SOCKET_COVERS_Amend_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-Amend_1.doc DOC document
Ref_6359953_D.pdf PDF
0508_A_SSDG_GOVERNOR_OVERHAUL_Amend_1.docx DOCX document
REVISED_J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
Ref_29198-MAETS-USNS_ARCTIC.pdf PDF
0509_A_Cargo_JP5_Fuel_Valve_Overhaul_Amend_1.docx DOCX document
Ref_085-8385180__ARCTIC_GA_REV_-.pdf PDF
0507_A_SSDG_TURBOCHARGER_OVERHAUL_Amend_1.docx DOCX document
01005_A_Station_Six_Anti_Slack_Device_Repair_Support-Amend_1.doc DOC document
0114_B_Weatherdeck_Drain_Piping_Repair_Amend_1.doc DOC document
0107_A_7-105-0-JJ_TANK_TOP_GAUGING_AND_STEEL_REPLACEMENT.docx DOCX document
0021_A_CLEAN_AND_GAS_FREE_TANKS_VOIDS_AND_COFFERDAMS_REV_OCT_2012__Amend_1.doc DOC document
Ref_29198-MAETS-USNS_ARCTIC-DWG.pdf PDF
Arctic_N32205-18-R-4256_MTA_Index_Amendment_1_(003).docx DOCX document
N32205-18-R-4256_Amend_0001.docx DOCX document
Q_AND_A_Responses___3.docx DOCX document
01003_A_Saddle_Winch_and_Saddle_Foundation_Refurbishment-Arctic_1.doc DOC document
0011_A__GENERAL_SERVICES_FOR_SHIP_T_AOE_REV_FEB_14_ARCTIC_1.doc DOC document
0004_A_TESTING_AND_QUALITY_ASSURANCE_REV_08Nov17.docx DOCX document
0101_A_REPLACE_AFT_HOUSE_03_LEVEL_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
Q_AND_A_Responses_2.docx DOCX document
0102_A_REPLACE_DECK_MACHINERY_SHOP_OVERHEAD_STEEL_(ABS)_ARCTIC_1.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
0030_B_CONTINUATION_OF_SERVICES_REV_FEB_14_ARCTIC_1.doc DOC document
0503_A_REPLACE_100_FT_OF_PIPING_REV_ARCTIC_1.doc DOC document
0504_A_PORT_AND_STBD_RHIB_DAVIT_INSPECTION_REV-ARCTIC_1.docx DOCX document
1385848_B_DECK_PLATES_FOR_SOUNDING_AND_FILLING_CONNECTIONS.pdf PDF
6360553_K_Sounding_Tubes_and_Tank_Vents.pdf PDF
Q_AND_A_Responses_1.docx DOCX document
0112_A_CHT_TANKS_STEEL_REPLACEMENT_REV-ARCTIC_1.doc DOC document
0103_ABS_TANK_INSPECTION_AND_TESTING_REV-ARCTIC_2.doc DOC document
0003_A_APPROACH_BERTH_AND_MOORING_REQUIREMENTS_REV_08Nov17.docx DOCX document
J_-_2_Category_A_Items_ARCTIC_Corrected.xls XLS spreadsheet
J_-_2_Category_A_Items_ARCTIC.xls XLS spreadsheet
J_-_10_Interport_Differential_-_Arctic_Nov_MTA_2018.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS ARCTIC

(T-AOE-8)

GENERAL REQUIREMENTS
N32205-18-R-4256

05 August, 2018

ITEM NO.
002
NSP

MSC/SWI/N75/PPE

TECHNICAL AND MANUFACTURER REPRESENTATIVES

1. ABSTRACT

1.1. This item sets general requirements for technical and manufacturer’s representatives.

2. REFERENCES/ENCLOSURES: None

3. ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity

3.1.1. As contained within the individual work items.

4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5. NOTES

5.1. The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) item 024, to determine applicability to this item. In performance of work items in this package, the contractor and all subcontractors regardless of tier must comply with the requirements of GTR 024, where specified in an individual work item.

5.2. The work item(s) specification(s) contained in the solicitation may indicate or may not indicate that Government Furnished Technical Representative(s) will be on site. Without regard to GFS technical representatives being identified in the work item(s) specification(s) these requirements shall apply.

5.3. For the purpose of this solicitation, the terms manufacturer’s representative, technical representative, techrep, or any variant thereof shall be construed to be synonymous.

6. QUALITY ASSURANCE REQUIREMENTS

6.1. As contained within the individual work items.

7. STATEMENT OF WORK

7.1. The work item specification(s) contained in the solicitation may require the contractor to furnish technical representatives, or may indicate or may not indicate that Government furnished technical representative(s) will be on site. When any such instances are indicated in the work item specification(s) the following shall apply:

7.2. Contractor furnished technical representatives:

7.2.1. The contractor shall furnish the services only of an original equipment manufacturer's (OEM), OEM authorized, or MSC approved qualified independent technical representative(s) as specified in the individual work item.

7.2.1.1. The contractor, in order to obtain MSC approval for an OEM authorized technical representative shall provide a copy of a valid manufacturer's authorization letter with date of issue, name, address, and telephone number for verification.

7.2.1.2. OEM-authorized service technicians and technical representatives shall be required to produce proper training and authorization documentation from the OEM asserting their qualification to perform M&R work on the designated equipment. They shall have all technical documentation, service bulletins and reach-back to the OEM engineering department to assess, diagnose and properly accomplish M&R.

7.2.1.3. Non-OEM qualified technical field service providers will be required to have the following qualifications. The contractor must submit evidence that the proposed non-OEM technical representative possesses all of the qualifications listed below, subject to MSCREP review and approval:

7.2.1.3.1. At least five years of documented work experience which includes documented formal training in a field service organization as an authorized manufacturer's technical representative or field service provider for the type of equipment or systems being serviced, repaired, installed, modified, or relocated.

7.2.1.3.2. Demonstrated competency in analyzing repair requirements and maintenance and repair process performance and making recommendations based upon as-found condition results and/or performance analysis.

7.2.1.3.3. Recent references (within the last 3 years) from at least three different clients for whom service was provided as a qualified technical representative on the type of equipment or systems being serviced, repaired, installed, modified, or relocated.

7.2.1.3.4. Ability to procure parts and access to manufacturer's drawings, technical manuals, technical service bulletins, and special tools for the equipment or machinery specified in the work item. Alternatively, the qualified technical field service representative shall have expert knowledge of the equipment or system and shall be able to provide detailed repair requirements, including identification of parts required, sources for those parts, and step-by-step repair procedures to the shipyard and the MSCREP to return the equipment for full operating parameters.

7.2.2. The tech reps are to be on site at all times whenever the following evolutions are performed to specified equipment or systems: disconnection, removal, opening, disassembly inspection, taking of clearance readings, maintenance and repair, static and dynamic balancing tests and adjustments, reassembly, shop tests, reinstallation, commissioning, operating tests, dock trials, and sea trials.

7.2.3. The tech rep shall witness all of the above identified tasks and shall prepare all reports of design, as found and final reassembly dimensions and clearances, as found condition and recommended repairs, shop test, commissioning and operational test, dock trial and sea trial results.

7.2.4. The tech rep shall witness and sign all reports attesting to his presence and witnessing of the test and concurring with the results for all tests performed by the contractor or other sub-contractors.

7.2.5. The contractor shall be prepared to submit a list of all technical representatives (by manufacturer name), intended to be employed during the contract performance period to MSC as part of the proposal submitted in response to this solicitation.

7.2.6. The MSCREP may reject a tech rep for failure to provide an authorization letter or verifiable proof of competence.

7.2.7. The contractor, in order to obtain approval for an independent tech rep shall provide copies of traceable past employment history and certificates of training. The MSCREP may reject an independent tech rep for unsatisfactory qualification proof.

7.2.8. No work on any work item requiring a technical representative shall start until the MSCREP approves the tech rep for that item and the tech rep is on site.

7.3. Government furnished technical representatives:

7.3.1. The Government may furnish the services of a manufacturer's authorized or non-OEM qualified technical representative to be on site at the ship repair facility at required times during repairs to the specified equipment of systems.

7.3.2. In the event that the contractor indicates either through written correspondence or the contractor’s production schedule that the Government’s technical representative is required to be on-site to support a production element, and subsequently fails to start the subject work item on time, the MSCREP will issue a PSDPN (Production Schedule Delinquent Progress Notice) in accordance with work item 013 of this work package. PSDPNs found to be the result of contractor delinquencies that affect the presence of a Government furnished technical representative will result in actions to recoup the additional costs for the subject Government furnished technical representative.

7.3.3. The contractor shall coordinate and reiterate the production schedule dates for when the Government techrep is to be on site via the MSCREP in writing seven (7) calendar days in advance of the work item's start.

8. GENERAL REQUIREMENTS

8.1. None additional.

002-1