EUHW Late RFP Questions Received - Pt 3 - 21DEC2018 Final.xlsx

XLSX spreadsheet 25 KB Posted

Attached to
NGEN-R End User Hardware as a Service and Supply
Solicitation number
N00039-18-R-0004
Issued by

About this file

This document contains questions received and answers provided regarding a federal solicitation for end user hardware as a service and supply. The solicitation seeks to acquire Department of Navy end user hardware including laptops, desktops, tablets, virtual desktops, and thin/zero client devices along with associated peripherals through an indefinite-delivery indefinite-quantity contract with firm-fixed-price and cost reimbursement line items. The contract would have a three-year base period and six one-year option periods. Questions covered topics such as an extension to the response date which was granted through Amendment 0007 setting the new date at January 18, 2019, clarification of graphics card and small business participation requirements, and verification of a subcontract line item status change. Responses provided amendments and explanations to address the questions.

View the file

Other files

File Type Posted
EUHW N00039-18-R-0004 AMD 0009 dtd 17JAN2019.pdf PDF
EUHW N00039-18-R-0004 Conformed thru AMD 0009 dtd 17JAN2019.pdf PDF
EUHW Late RFP Questions Received - Pt 5 - 17JAN2019 Final.docx DOCX document
EUHW Attch 1 EUHW PWS_v6_with Track Changes.pdf PDF
EUHW N00039-18-R-0004 Conformed thru AMD 0008 dtd 10JAN2019.pdf PDF
EUHW Attch 1 EUHW PWS_v6 Final.docx DOCX document
EUHW Attch 10 EUHW Device Specifications v7 9JAN2019.xlsx XLSX spreadsheet
EUHW N00039-18-R-0004 AMD 0008 dtd 10JAN2019.pdf PDF
EUHW Attch L-1 EUHW Price Workbook_v5.xlsx XLSX spreadsheet
EUHW Late RFP Questions Received - Pt 4 - 9JAN2019 Final.docx DOCX document
EUHW N00039-18-R-0004 Amd 0007 MOD dtd 17DEC2018.pdf PDF
EUHW Attch L-1, EUHW Price Workbook_v4.xlsx XLSX spreadsheet
EUHW Attch 1 EUHW PWS_v5 14DEC2018 Final.pdf PDF
EUHW N00039-18-R-0004 CONFORMED thru Amd 0006 dtd 14DEC2018.pdf PDF
EUHW Attch 1 EUHW PWS_v5 with track changes 14DEC2018.docx DOCX document
A205 EUHW CDRL_Program Protection Implementation Plan.docx DOCX document
EUHW N00039-18-R-0004 Amd 0006 MOD dtd 14DEC2018.pdf PDF
A208 EUHW CDRL_Contractor Personnel Access List Report.docx DOCX document
EUHW Attch 10 EUHW Device Specifications v6.xlsx XLSX spreadsheet
EUHW Late RFP Questions Received - Pt 2 - 13DEC2018 Final.xlsx XLSX spreadsheet
EUHW Late RFP Questions Received - Pt 1 - 7DEC2018 Final.xlsx XLSX spreadsheet
N00039-18-R-0004 Amendment 0005 dtd 29NOV2018.pdf PDF
EUHW N0003918R0004 Amd 0004 15NOV2018.pdf PDF
CDRL A210 EUHW_System Security Plan.docx DOCX document
EUHW Attch 5 v2, Navy Logistics Asset Data Attributes FINAL.pdf PDF
EUHW Attch 10 EUHW Device Specifications REV5.xlsx XLSX spreadsheet
EUHW Attch 1 EUHW PWS_v4 FINAL.docx DOCX document
EUHW Attch 3, Warranty Tracking and Administration.pdf PDF
EUHW Attch L-1, EUHW Price Workbook_v3.xlsx XLSX spreadsheet
EUHW Attch 1 EUHW PWS_v4 with track changes 14NOV2018.docx DOCX document
B301 v2 EUHW USMC CDRL_Service Desk Summary Report.pdf PDF
EUHW Attch 11 v2, Service Level Requirements FINAL.xlsx XLSX spreadsheet
B304 v2 EUHW USMC CDRL_Asset Shipment Report.pdf PDF
EUHW Attch 1 EUHW PWS_v3 with track changes DRAFT.docx DOCX document
B303 v2 EUHW USMC CDRL_Government Property Inventory Report.pdf PDF
EUHW Attch 10 EUHW Device Specifications REV4.1.xlsx XLSX spreadsheet
EUHW Attch L-1, EUHW Price Workbook_v2.xlsx XLSX spreadsheet
EUHW Attch 1 EUHW PWS_v3 FINAL.pdf PDF
B302 v2 EUHW USMC CDRL_Direct Access Report.pdf PDF
EUHW N00039-18-R-0004 AMD 0003 - 05NOV2018 FINAL.pdf PDF
EUHW RFP Questions Pt 2 - 2NOV2018 Final.xlsx XLSX spreadsheet
EUHW RFP Questions Pt 1 - 31OCT2018 - Final.xlsx XLSX spreadsheet
N00039-18-R-0004 Amd 0002 dtd 11OCT2018.pdf PDF
EUHW Attch 1 EUHW PWS_v2.0 FINAL.pdf PDF
N00039-18-R-0004 Amendment 0001.pdf PDF
EUHW Attch 16, USMC Logistics Asset Data Attributes FINAL.docx DOCX document
EUHW Attch 2, Contract Security Classification Specification (DD-254) FINAL.pdf PDF
EUHW Attch 11, Service Level Requirements FINAL.xlsx XLSX spreadsheet
NGEN-R AcquServe User Guide v1 20180917.pdf PDF
EUHW Attch 6, EUHW Navy Site Listing.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Late Qs Rnd 3

Date Question ReceivedQuestion or CommentAnswerSectionAmendmentRESPONSE POSTED ON ECOMMERCE
12/14/18[R]equest [that] an extension be granted for the submission of offers to January 28, 2019. An extension is necessary to allow bidders reasonable time to implement the changes and "anticipated changes" into their proposals.The request was considered. Amendment 0007 of the EUHW RFP extended the submission of offers to 18 JAN 2019. No additional extension is granted at this time.12/21/18
12/14/18[R]equest a minimum of a three (3) week extension for NGEN EUHW Solicitation EUHW N00039-18-R-0004, with the new due date to be January 28, 2019. Our request for extension is based on the following primary considerations:

· Without the updated PWS we have lost all those working days since November 29, 2018. Updates to any changes in the Small Business Plan is a massive undertaking which requires coordination of many specialists and the consideration of time.

· The timing of the anticipated release of the documents will now impact the planned U.S. holidays and the availability of the large number of pursuit team specialists involved in this complex Navy solution.

We request a minimum of three (3) weeks extension. Should the release of the updated documents continue to extend out we request those additional days be added to the extension due date.

The request was considered. Amendment 0007 of the EUHW RFP extended the submission of offers to 18 JAN 2019. No additional extension is granted at this time.12/21/18
12/18/18Answer #13 on Round 2 Q&A stated the following requirement for High Performance Desktop, “Discrete HD graphics with quad monitor support, 24GB; secondary GPU card for supporting graphic acceleration and general-purpose computing only.” ear, and does not inform bidders which size and type of card is acceptable for the second GPU now being required. Dual Graphics cards in generally perform at maximum efficiency when both cards are from the same manufacturer. If this stipulation is not made, bidders may choose multiple OEM cards which will require several different sets of drivers to be installed on the system, slowing efficiency and causing performance dysfunction. As such, based on interoperability requirements of industry leading GPU manufacturers, please modify this requirement to state, “Discrete HD graphics with quad monitor support, 24GB; secondary GPU card from the same manufacturer at a minimum of 2GB for supporting graphic acceleration and general-purpose computing only.”An amendment to the RFP will update RFP Attachment 10, Device Specifications, to clarify this requirement.EUHW Attch 10 EUHW Device SpecificationsUpdate Attachment 10 graphics statements for the High Performance seats12/21/18
12/20/18The Small Business Plan goals are calculated incorrectly. The Small Business Participation goals have changed from 34% of Total Subcontract Value, to 34% of Total Contract Value, now to 14% of Total Contract Value.

Amendment 6 stated: Total Small Business-34%; Small Disadvantaged Business-5%; Woman Owned Small Business-5%; HUB Zone-3%; Service-Disabled Veteran Owned Small Business-3%; Veteran Owned Small Business-3%

Amendment 7 stated: Total Small Business-14%; Small Disadvantaged Business-5%; Woman Owned Small Business-5%; HUB Zone-3%; Service-Disabled Veteran Owned Small Business-3%; Veteran Owned Small Business-3%

Amendment 7 shows that we need to deliver 19% of the Total Contract Value to just the five (5) listed Small Business types, which is not possible when total Small Business goal is 14%. If the ratios from the original Small Business Participation Plan are to remain in effect for the new 14% of Total Contract Value, then the Small Business Participation percentages for the total subcontracted value should read as follows:

Total Small Business-14% -Small Disadvantaged Business-2% -Woman Owned Small Business-2%

- HUB Zone-1% -Service-Disabled Veteran Owned Small Business-1%

- Veteran Owned Small Business-1%

Please confirm the that these numbers are correct and an Amendment will be issued.

The small business participation and socioeconomic goals will not be changed.

For clarification: The socioeconomic category percentages are not in addition to the 14% small business participation goal. They are subsets of the goal. Offerors need to ensure that 19% of the small business participation goal consist of socioeconomic categories (5% Small Disadvantaged Business; 5% Woman Owned Small Business; 3% HUB Zone; 3% Service-Disabled Veteran Owned Small Business; and 3% Veteran Owned Small Business).RFP L-4The requirement for Attachment 4 remains unchanged12/21/18
12/20/18Per FAR 52.219-9(g), “…Once the Contractor’s commercial plan has been approved, the Government will not require another subcontracting plan from the same Contractor while the plan remains in effect, as long as the product or service being provided by the Contractor continues to meet the definition of a commercial item…”Please confirm the following – “Offeror is not required to submit an individual Small Business Subcontracting Plan for NGEN EUHW Solicitation # N00039-18-R-0004, as Offeror already has a US Government approved commercial plan per FAR 52.212-9(g).Per FAR 52.219-9(g), "A commercial plan is the preferred type of subcontracting plan for contractors furnishing commercial items." This does not mean that the commercial plan must be accepted by the Contracting Officer. The Offeror must still meet the small business goals required by the requiments of the EUHW RFP; whether it is in the form of a commercial plan or an individual plan approved under this contract.RFP L-4The requirement for Attachment 4 remains unchanged12/21/18
12/20/18There have been many changes to the Small Business Participation Plan so we need to clarify the government’s intent with this requirement. The original Small Business Plan was calculated based off of the total of the subcontracted business. We believe this is the proper way to measure Small Business participation on a Hardware Only contract vehicle, unless the government intends to award the contract as a small business set aside award. The change in the documents in the Small Business Plan to mandate Small Business participation based on the entire contract value is not possible when no small business can manufacture the required volume of units stated in this RFP. Furthermore, since the Navy removed all services aspects of the NGEN contract into the SMIT vehicle, as an OEM there are very few aspects of the EUHW that can be contracted to a Federal Small business Partner. As such, we request that the Navy revert the language back to what was stated in the original RFP documentation release that states that the Small Business Participate Plan is based on the Total Subcontracted Value only. Based on the above items and the need for clarification we request a two (2) week extension.The small business participation goal applies to "Total Contract Value," and will remain as stated in the RFP. Responses from Industry as well as market research has determined that 14 percent of the total contract value represents a reasonable small business participation requirement.

The request was considered. Amendment 0007 extended the submission of offers to 18 JAN 2018. No additional extension is granted at this time.

RFP L-4The small Business requirements in the RFP will remain unchanged.12/21/18
12/21/18SUBCLIN 0007AE: Please clarify the meaning of “The option status has changed from Option to No Status” in Amendment/Modification No 0006.SLIN 0007AE, is part of the base period that was erroneously marked as an option. Amendment 0006 corrected the error. The contract writing system's "no status" message means that the option status was removed.EUHW N00039-18-R-0004 Amd 0006 MOD dtd 14DEC2018 PG 4;12/21/18

File details come from the government source that posted it. Updated .