Attachment_27_-_Contractor_Request_to_use_Prohibited_Material.pdf

PDF 47 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 27 - Contractor Request to use Prohibited Material

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle 1. 1, newest first.
File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
CDRL_A058.pdf PDF
Attachment_05_-_ACV1_1_IMP_-_150420.pdf PDF
CDRL_A059.pdf PDF
Attachment_11-_Test_Schedules_and_Test_Locations_28_Apr_15.docx DOCX document
CDRL_A031.pdf PDF
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
CDRL_A060.pdf PDF
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
ACV_1_1_RFP_QA_Round_2.pdf PDF
Attachment_01_-_MASTER_SOW_-_150415.pdf PDF
M67854-15-R-0001-0001.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150319_(FINAL).pdf PDF
ACV_1.1_RFP_Cover_Letter_M67854-15-R-0001.pdf PDF
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
TOP_02-2-611_STANDARD_OBSTACLES_(17_Mar_10).pdf PDF
Attachment_06_-_COVER.docx DOCX document
Attachment_06.2_-_ACV_CSDR_PLAN_PD_Contract_Plan_N-14-H-C1.pdf PDF
Attachment_04_-_CDRL_Submission_Instructions_-_150319.docx DOCX document
Attachment_15__-_ACV_Fielding_Table_(150129).docx DOCX document
Attachment_18_-_COVER_-_Ships_Loading_Characteristics_Pamphlet_(SLCP).docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_30_-_Integrated_Data_Environment.docx DOCX document
Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx PPTX presentation
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Attachment_05_-_COVER.docx DOCX document
Attachment_26_-_Technical_Instructions.doc DOC document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
Attachment_03_-_Meeting_List_150319.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
Show all 50

Amphibious Combat Vehicle 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM AAA

Contractor Request for Use of Prohibited Materials

AAA-FRM-02002 v1.0 Page 1 of 4

1. General Information

Contractor:

Date of Request:

Technical Point of Contact:

Name:

Phone:

Email:

Address:

Vehicle(s):

Contract Number:

PM AAA Prohibited material for which waiver is requested:

2. Explanation of Use

Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery including quantities of these parts. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed. See Enclosure 1 for listing of minimum information required.

3. Health Hazard

Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any Personal Protective Equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, disposal, etc.).

AAA-FRM-02002 v1.0 Page 2 of 4

4. Analysis of Alternatives

Instructions: Identify all alternative material that was considered in lieu of the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for. Include explanation (e.g., Trade Study or BCA) as to why each cannot be implemented.

5. Technical Justification

Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated.

6. Program Risk

Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.

7. Get-Well Plan

Instructions: Identify the parts where an alternative may be integrated at a later date.

Provide a get-well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.

AAA-FRM-02002 v1.0 Page 3 of 4

The following Sections will be filled in by the Government

8. Environment, Safety, and Occupational Health Working Group (ESOH WG)

Evaluation/Recommendation

Instructions: Government ESOH WG will provide an evaluation of the above information and a recommendation regarding approval/disapproval of the prohibited material request.

Date

Chairman, ESOH WG

9. Concurrence

I concur that use of the prohibited material as described above is acceptable and justified:

Lead Engineer, Assistant Program Manager, Engineering

Produce Support Manager,

10. Approval

Upon the basis of the findings above, I hereby determine that the use of the prohibited material in the parts identified in Sections 1 through 7 is acceptable and justified.

Program Manager, Advanced Amphibious Assault

AAA-FRM-02002 v1.0 Page 4 of 4

ENCLOSURE 1:

Minimum information required in a spreadsheet for Item 2, Explanation of Use:

a) Contractor

b) Contract Number

c) Prohibited Hazardous Material

d) Hazard Tracking Number

e) Part or Process Number

f) Part or Process Description

g) Where Used

h) WBS Element Number Affected

i) Hazardous Material Quantity per Part

j) Hazardous Material Quantity per Vehicle

k) Is the material required for maintenance? (yes or no)

l) Is the material required for vehicle operation? (yes or no)

m) Additional information you want the Government to know.

Contractor:
Date of Request:
Vehicles:
PM AAA Prohibited material for which waiver is requested:
TPOC Phone Number:
Technical Point of Contact Name:
TPOC Address:
TPOC Email Address:
Insert APM E Name:
Insert Lead Engineers Name:
Insert Chairperson Name:
Insert Program Managers Name:
Date:
Insert PSM Name:
Program Name:
Attachment Number: Attachment 27
Contract Number:
RFP or Contract NumberNumber: M67854-15-R-0001
Explanation of Use:
Health Hazard:
Analysis of Alternatives:
Technical Justification:
Program Risk:
Get-Well Plan:

File details come from the government source that posted it. Updated .