CDRL_A060.pdf

PDF 756 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

CDRL A060

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle 1. 1, newest first.
File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
CDRL_A031.pdf PDF
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
Attachment_23_-_ACV_1.1_RFP_DD254_M67854-15-R-0001__20150429.pdf PDF
Attachment_10.2_-_GFP_Report_ACV_2015_04_21.pdf PDF
CDRL_A010.pdf PDF
Amendment_4.pdf PDF
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
CDRL_A058.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
M67854-15-R-0001-0002.pdf PDF
M67854-15-R-0001-0001.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
Attachment_11_-_Test_Schedules_and_Test_Locations_150406.docx DOCX document
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_30_-_Integrated_Data_Environment.docx DOCX document
Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx PPTX presentation
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Attachment_05_-_COVER.docx DOCX document
Attachment_26_-_Technical_Instructions.doc DOC document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
Attachment_28_-_COVER.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_27_-_Contractor_Request_to_use_Prohibited_Material.pdf PDF
Attachment_14_-_ACV_IUID_Plan_Signed.pdf PDF
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
Attachment_28_-_ACV_1.1_CWBS_Index_and_Dictionary.xlsx XLSX spreadsheet
Attachment_10.2_-_GFP_Report_ACV_2015_03_20.pdf PDF
Attachment_06.1_-_ACV_PLAN_EMD_Signed_Approved_Contract_Plan_N-14-G-C1.pdf PDF
Attachment_02_-_COVER_150319.docx DOCX document
Attachment_16.2_-_TABLE_A-II_Oper_and_Combined_Oper_Maint_Rqumts.docx DOCX document
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
Attachment_03_-_Meeting_List_150319.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
1_ACV_1.1_CDRLs_03192015.pdf PDF
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Show all 50

Amphibious Combat Vehicle 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TM: _____ TDP: _____ Other: __ X__

D. SYSTEM/ITEM

AMPHIBIOUS COMBAT VEHICLE (ACV)

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A060

2. TITLE OF DATA ITEM

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND

ASSOCIATED LISTS

3. SUBTITLE

VULNERABILITY CAD MODELS

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81002F

5. CONTRACT REFERENCE

SOW PARA 3.3.21.2

6. REQUIRING OFFICE

PROGRAM MANAGER

ADVANCED AMPHIBIOUS

ASSAULT (PM AAA)

7. DD 250 REQ

LT

9.

DIST STATEMENT

REQUIRED

SEE BLOCK 16

10. FREQUENCY

THREE (3) TIMES

12. DATE OF FIRST

SUBMISSION

90 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: TECHNICAL DATA PACKAGE (TDP) OPTION SELECTION WORKSHEET FOLLOWS

AS A REFERENCE. SPECIFIC INFORMATION REQUIRED TO SUPPORT THE GOVERNMENT

MODELING AND SIMULATION (M&S) INCLUDES:

• COMPUTER-AIDED DESIGN (CAD) MODEL SPLIT INTO VARIOUS SUB-ASSEMBLIES

ACCORDING TO WORK BREAKDOWN STRUCTURE (WBS), PROVIDED AS SEPARATE FILES

IN THE STEP FILE FORMAT FOR EACH MAJOR SUB-ASSEMBLY, PROVIDED IN THE SAME

COORDINATE SYSTEM AND ORIENTATION AS THE OVERALL VEHICLE ASSEMBLY.

IMPORTANT COMPONENTS FOR SURVIVABILITY (E.G., HULL STRUCTURE, SUSPENSION,

SEAT AND FLOOR SUBASSEMBLIES, ARMOR, ETC.) ARE TO BE PROVIDED AS SOLID

GEOMETRY MODELS (AS OPPOSED TO SURFACE GEOMETRY). THE STEP FILES SHOULD

BE IN THE AP203 FORMAT, WITH THE EXCEPTION OF AP203_e2 FORMAT (WHICH

INCLUDES MATERIAL DATA) WHICH IS NOT ACCEPTABLE.

• BILL OF MATERIAL (BOM) THAT INCLUDES MATERIAL NAMES AND GRADES.

• MATERIAL PROPERTIES FOR ALL BOM MATERIALS, INCLUDING HIGH STRAIN-RATE

MATERIAL PROPERTIES, INITIAL MODULUS, STRESS-STRAIN CURVES AT DIFFERENT

STRAIN RATES, POISSON’S RATIO AND STRAIN AT FAILURE.

• PART ATTACHMENT INFORMATION THAT DEFINES HOW PARTS ARE

ATTACHED/ASSEMBLED TO INCLUDE FASTENER DETAILS (SIZE, STRENGTH, GRADE) FOR

BOLTED CONNECTIONS, WELD MATERIAL PROPERTIES, WELD AND WELD BEVEL

DIMENSIONS, BONDING SPECIFICATIONS INCLUDING BOND MATERIAL STRENGTH AND

OTHER JOINING SPECIFICATIONS.

• VEHICLE INERTIAL PROPERTIES TO INCLUDE OVERALL WEIGHT, CENTER OF GRAVITY,

INERTIA PROPERTIES, AND VEHICLE WEIGHT DISTRIBUTION FOR ALL WEIGHT

CONDITIONS AND DRIVE CONFIGURATIONS.

• MASS AND CG OF ALL SUB-ASSEMBLIES AND GFE COMPONENTS FOR ALL REQUIRED

LOAD PLANS.

• DETAILED MODELS OF COMPONENTS THAT HAVE A RANGE OF ADJUSTABLE

CONFIGURATIONS ALLOWING FOR MODEL MANIPULATION.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

Fitch CIV Dennis W

H. DATE

I. APPROVED BY

Was CIV Joseph E

J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TM: _____ TDP: _____ Other: __ X__

D. SYSTEM/ITEM

AMPHIBIOUS COMBAT VEHICLE (ACV)

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

16. REMARKS (Continuation of A060)

• FOR SEATS AND ANY OTHER OCCUPANT PROTECTION DEVICES (STROKING FLOOR OR FLOOR MATS), DETAILED CAD MODELS, MATERIAL PROPERTIES, AND ATTACHMENTS INCLUDING SPECIFIC (CAD) DETAILS ON THE ENERGY ABSORPTION (EA) SYSTEM.

BEHAVIOR (OF THE EA) AS A FUNCTION OF STROKE DEPICTED AS A FORCE-DISPLACEMENT CURVE, AS WELL AS DYNAMIC PROPERTIES OF ANY SPRING/DAMPER AND FOAM/POLYMER COMPONENTS CONTAINED IN THE SYSTEM(S), IF ANY, OVER THE RANGE OF EXPECTED PERFORMANCE. DYNAMIC TEST RESULTS OF COMPONENT/SUBSYSTEM LEVEL TESTS OF THESE SYSTEMS (i.e. DROP TOWER, CSBES, ETC.). TEST DATA TO INCLUDE TEST SETUP DESCRIPTION, PICTURES, VIDEOS, INSTRUMENTATION SCHEMATIC AND OUTPUT DATA.

• VEHICLE DESIGN STANDOFF DISTANCE AT PLANNED TEST WEIGHT (PREFERRED IF SUSPENSION COMPONENT CAD CAN BE PROVIDED

IN THIS POSITION AS WELL).

BLOCK 8: INITIAL SUBMISSION, PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL DESIGN REVIEW (CDR): THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT.

THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW.

THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.

2ND SUBMISSION, SYSTEM VERIFICATION REVIEW (SVR): THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS

TO ACCEPT THE SUBMISSIONS.

3RD SUBMISSION: THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT.

ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.

THE GOVERNMENT SHALL HAVE GOVERNMENT PURPOSE RIGHTS FOR ALL CAD MODELS DEVELOPED UNDER THIS CONTRACT.

BLOCK 13: 2ND SUBMISSION (SVR): 60 CALENDAR DAYS FOLLOWING COMPLETION OF THE LAST SYSTEM VERIFICATION TEST IDENTIFIED IN THE GOVERNMENT INTEGRATED MASTER SCHEDULE AND COMMUNICATED TO THE CONTRACTOR AT THE PROGRAM

MANAGEMENT REVIEWS.

3RD SUBMISSION: 60 CALENDAR DAYS FOLLOWING PHYSICAL CONFIGURATION AUDIT (PCA).

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING

OFFICER’S REPRESENTATIVE (COR) AND THE ALTERNATE COR.

DD FORM 1423-1, FEB 2001 Page 2 of 2

TDP OPTION SELECTION WORKSHEET

SYSTEM: DATE PREPARED:

A. CONTRACT NO.

B. EXHIBIT/ATTACHMENT

NO.

C. CLIN

D. CDRL DATA ITEM NO.

1. TDP Level (X and complete as applicable.)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODEL ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) _______ ______________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO32000 PORTABLE DOCUMENT FORMAT: _______

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY:

REMARKS: ________________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: _________________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply)

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST

6. ASSOCIATED LISTS (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

E. INDENTURE DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES WITH

APPENDICES

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35 REVISION OF ENGINEERING DRAWINGS

AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCES

OTHER STANDARDS APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED: YES NO

8. OTHER TAILORING

1_ACV_1.1_CDRLs_03192015 94
1_ACV_1.1_CDRLs_03192015 95
CDRL A060 OSW
A CONTRACT NO:
C CLIN: 0004
D CDRL DATA ITEM NO: A060
CONCEPTUAL LEVEL: Off
DEVELOPMENTAL LEVEL: On
PRODUCTION LEVEL: Off
B REMARKS: VULNERABILITY CAD MODELS
TYPE 2D 2D DRAWINGS: Off
TYPE 3D 3D MODEL ONLY: On
TYPE 3D 3D MODELS WITH: Off
NATIVE CAD SPECIFY TYPE: On
undefined: CONTRACTOR'S CAD 3D MODELING SOFTWARE, PREFERRED PTC PRO/ENGINEER
ISO 10303 STEP FORMAT Specify STEP PROTOCOL AP203 AP 214 etc: On
undefined_3: AP214 OR AP203 (INCLUDED MASS & MATERIAL PROPERTIES AND CENTER OF GRAVITY)
ISO32000 PORTABLE DOCUMENT FORMAT: Off
undefined_4:
OTHER ELECTRONIC FORMAT SPECIFY TYPE: Off
undefined_5:
HARDCOPY: Off
REMARKS:
CONTRACTOR CAGE AND DOCUMENT NUMBERS: On
GOVERNMENT CAGE COMPLETE 3B 3C OR 3D: Off
D To Be Assigned By:
B USE CAGE CODE:
C USE DOCUMENT NUMBERS:
CONTRACTOR FORMAT: On
GOVERNMENT FORMAT: Off
REMARKS_2:
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOROR THE FOLLOWING ARE REQUIRED: Off
CONCEPTUAL DRAWINGSMODELS AND ASSOCIATED LISTS: Off
DEVELOPMENTAL DESIGN DRAWINGSMODELS AND ASSOCIATED LISTS: On
PRODUCT DRAWINGSMODELS AND ASSOCIATED LIST: Off
COMMERCIAL DRAWINGSMODELS AND ASSOCIATED LIST: Off
QUALITY ASSURANCE PROVISIONS: Off
SPECIAL INSPECTION EQUIPMENT SIE DRAWINGSMODELS AND ASSOCIATED LISTS: Off
SPECIFICATIONS: Off
SOFTWARE DOCUMENTATION: Off
SPECIAL PACKAGING INSTRUCTIONS SPI DRAWINGSMODELS AND ASSOCIATED LIST: Off
undefined_7: Off
undefined_6: On
undefined_9: Off
undefined_8: On
undefined_10: Off
1 NOT REQUIRED: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY: Off
1 NOT REQUIRED_2: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_2: Off
undefined_11: Off
1 NOT REQUIRED_3: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_3: Off
E INDENTURE DATA LIST X ONE: Off
1 NOT REQUIRED_4: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_4: Off
F APPLICATION LISTS X ONE: Off
1 NOT REQUIRED_5: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_5: Off
ASME Y14100: On
B: On
C: On
D: On
E: On
ASME Y1424 TYPES AND APPLICATIONS OF: On
ASME Y1434 ASSOCIATED LIST: On
ASME Y1435 REVISION OF ENGINEERING DRAWINGS: On
ASME Y1441 DIGITAL PRODUCT DATA PRACTICES: On
ASME Y145 DIMENSIONING AND TOLERANCES: On
OTHER STANDARDS APPLY AS: Off
COMPANY STANDARDS: NO
8 OTHER TAILORING: SEE Block 16 of CDRL A060
Exhibit or Attachment: A
Hardcopy:
Date Prepared: 23 March 2015
Name of System: ACV 1.1
Other Standard:

File details come from the government source that posted it. Updated .