CDRL_A058.pdf

PDF 623 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

CDRL A058

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle 1. 1, newest first.
File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
Attachment_05_-_ACV1_1_IMP_-_150420.pdf PDF
CDRL_A059.pdf PDF
Attachment_11-_Test_Schedules_and_Test_Locations_28_Apr_15.docx DOCX document
CDRL_A031.pdf PDF
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
CDRL_A060.pdf PDF
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
ACV_1_1_RFP_QA_Round_2.pdf PDF
Attachment_01_-_MASTER_SOW_-_150415.pdf PDF
M67854-15-R-0001-0001.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150319_(FINAL).pdf PDF
ACV_1.1_RFP_Cover_Letter_M67854-15-R-0001.pdf PDF
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
TOP_02-2-611_STANDARD_OBSTACLES_(17_Mar_10).pdf PDF
Attachment_06_-_COVER.docx DOCX document
Attachment_06.2_-_ACV_CSDR_PLAN_PD_Contract_Plan_N-14-H-C1.pdf PDF
Attachment_04_-_CDRL_Submission_Instructions_-_150319.docx DOCX document
Attachment_15__-_ACV_Fielding_Table_(150129).docx DOCX document
Attachment_18_-_COVER_-_Ships_Loading_Characteristics_Pamphlet_(SLCP).docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_30_-_Integrated_Data_Environment.docx DOCX document
Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx PPTX presentation
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Attachment_05_-_COVER.docx DOCX document
Attachment_26_-_Technical_Instructions.doc DOC document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
Attachment_03_-_Meeting_List_150319.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
1_ACV_1.1_CDRLs_03192015.pdf PDF
Show all 50

Amphibious Combat Vehicle 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TM: _____ TDP: _____ Other: __X__

D. SYSTEM/ITEM

AMPHIBIOUS COMBAT VEHICLE (ACV)

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A058

2. TITLE OF DATA ITEM

TECHNICAL REPORT - STUDY/SERVICES

3. SUBTITLE

FORCE PROTECTION AND VULNERABILITY

REDUCTION REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW PARA 3.3.21

6. REQUIRING OFFICE

PROGRAM MANAGER

ADVANCED AMPHIBIOUS

ASSAULT (PM AAA)

7. DD 250 REQ

LT

9.

DIST STATEMENT

REQUIRED

SEE BLOCK 16

10. FREQUENCY

TWO (2) TIMES

12. DATE OF FIRST

SUBMISSION

90 DAC

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 8: INITIAL SUBMISSION, PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL DESIGN

REVIEW (CDR): THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND

PROVIDE COMMENTS ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL

CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE

TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL

HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.

2ND SUBMISSION, SYSTEM VERIFICATION REVIEW (SVR): THE GOVERNMENT WILL HAVE 45

CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE SVR ARTIFACT.

ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15

CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR

REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT

OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;

ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED

TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET,

QUANTICO, VA 22135-6050.

BLOCK 13: 2ND SUBMISSION (SVR): 60 CALENDAR DAYS FOLLOWING COMPLETION OF THE

LAST SYSTEM VERIFICATION TEST IDENTIFIED IN THE GOVERNMENT INTEGRATED MASTER

SCHEDULE AND COMMUNICATED TO THE CONTRACTOR AT THE PROGRAM MANAGEMENT

REVIEWS.

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN

ELECTRONIC COPY TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND THE

ALTERNATE COR.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

Fitch CIV Dennis

H. DATE

I. APPROVED BY

Was CIV Joseph E

J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1