1_ACV_1.1_CDRLs_03192015.pdf
PDF 7 MB Posted
- Attached to
- Amphibious Combat Vehicle 1. 1 Federal contract opportunity
- Solicitation number
- M67854-15-R-0001
- Issued by
- United States Marine Corps
About this file
1 ACV 1.1 CDRLs 03192015
View the file
Other files for this federal contract opportunity
Show all 50
Amphibious Combat Vehicle 1. 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
OPERATIONS SECURITY (OPSEC) PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80934C
5. CONTRACT REFERENCE
SOW PARA 3.1.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
TWO (2) TIMES
12. DATE OF FIRST
SUBMISSION
60 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
BLOCK 13: 450 CALENDAR DAYS AFTER LOW-RATE INITIAL PRODUCTION (LRIP) (OPTION, IF
EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND THE
ALTERNATE COR.
15. TOTAL
G. PREPARED BY
Scarlato CIV Angelo D
H. DATE
I. APPROVED BY
LT COL MULLINS
J. DATE
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
FIVE (5) TIMES
12. DATE OF FIRST
SUBMISSION
90 DAC
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: GUIDANCE FOR ADDRESSING THE OUTLINE AREAS OF THE GOVERNMENT'S
PROGRAM PROTECTION PLAN (PPP) IS PROVIDED IN THE PPP OUTLINE AND GUIDANCE,
VERSION 1.0 OF JULY 2011 (LINK: HTTP://WWW.ACQ.OSD.MIL/SE/DOCS/PPP-OUTLINE-AND-
GUIDANCE-V1-JULY2011.PDF).
BLOCK 8: INITIAL SUBMISSION, PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL DESIGN
REVIEW (CDR): THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND
PROVIDE COMMENTS ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL
CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE
TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL
HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
2ND SUBMISSION, VEHICLE ACCEPTANCE REVIEW (VAR): THE GOVERNMENT WILL HAVE 30
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
3RD SUBMISSION, SYSTEM VERIFICATION REVIEW (SVR): THE GOVERNMENT WILL HAVE 45
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE SVR ARTIFACT.
ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15
CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR
REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE
SUBMISSIONS.
4TH AND 5TH SUBMISSIONS, LOW-RATE INITIAL PRODUCTION (LRIP)/FULL-RATE
PRODUCTION (FRP) (OPTIONS, IF EXERCISED): THE GOVERNMENT WILL HAVE 21
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
McGowan CIV Steven J
Was CIV Joseph E
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A002)
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., AND SEC 2751, ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH
PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13: 2ND SUBMISSION (VAR): FIVE (5) CALENDAR DAYS AFTER FIRST VEHICLE COMPLETES ACCEPTANCE TEST.
3RD SUBMISSION (SVR): 60 CALENDAR DAYS FOLLOWING COMPLETION OF THE LAST SYSTEM VERIFICATION TEST IDENTIFIED IN THE GOVERNMENT INTEGRATED MASTER SCHEDULE AND COMMUNICATED TO THE CONTRACTOR AT THE PROGRAM MANAGEMENT
REVIEWS.
4TH AND 5TH SUBMISSIONS: 30 CALENDAR DAYS AFTER LRIP AND FRP (OPTIONS, IF EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING
OFFICER’S REPRESENTATIVE (COR) AND THE ALTERNATE COR.
DD FORM 1423-1, FEB 2001 Page 2 of 2
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
CYBER SECURITY/INFORMATION ASSURANCE
(IA) STATUS ASSESSMENTS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED
BY THE ARMS EXPORT CONTROL ACT (TITLE 22, UNITED STATES CODE (U.S.C.), AND SEC
2751, ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,
U.S.C., APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DEPARTMENT
OF DEFENSE (DoD) DIRECTIVE 5230.25.
BLOCKS 10 AND 13: 90 CALENDAR DAYS AFTER INITIAL SUBMISSION, THEN QUARTERLY
THROUGH THE END OF THE BASE CONTRACT.
90 CALENDAR DAYS AFTER LOW-RATE INITIAL PRODUCTION (LRIP) (OPTION, IF EXERCISED), THEN QUARTERLY THROUGH THE END OF LRIP (OPTION, IF EXERCISED).
90 CALENDAR DAYS AFTER FULL-RATE PRODUCTION (FRP) (OPTION, IF EXERCISED), THEN
QUARTERLY THORUGH THE END OF FRP (OPTION, IF EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND THE
Kelley CIV Peter
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
ANTI-TAMPER PLAN
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
FIVE (5) TIMES
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 4: DI-ADMN-81306 GUIDANCE FOR ADDRESSING PREPARATION OF THE
CONTRACTOR'S ANTI-TAMPER PLAN CAN BE FOUND IN DEPARTMENT OF DEFENSE (DoD)
ANTI-TAMPER PLAN TEMPLATE, VERSION 3.0 OF 29 AUGUST 2011. REQUESTS FOR THE
TEMPLATE SHALL BE REFERRED TO THE PROGRAM EXECUTIVE OFFICE - LAND SYSTEMS
(PM AAA), 2200 LESTER STREET, QUANTICO, VA 22134-6050.
BLOCK 8: INITIAL SUBMISSION, PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL DESIGN
REVIEW (CDR): THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND
PROVIDE COMMENTS ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL
CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE
TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL
HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
2ND SUBMISSION, VEHICLE ACCEPTANCE REVIEW (VAR): THE GOVERNMENT WILL HAVE 30
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSIONS.
3RD SUBMISSION, SYSTEM VERIFICATION REVIEW (SVR): THE GOVERNMENT WILL HAVE 45
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE SVR ARTIFACT.
ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15
CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR
REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE
SUBMISSIONS.
4TH AND 5TH SUBMISSIONS, LOW-RATE INITIAL PRODUCTION (LRIP)/FULL-RATE
PRODUCTION (FRP) (OPTIONS, IF EXERCISED): THE GOVERNMENT WILL HAVE 21
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
McGowan CIV Steven J
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A004)
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, UNITED STATES CODE (U.S.C.), AND SEC 2751, ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13: 2ND SUBMISSION (VAR): FIVE (5) CALENDAR DAYS AFTER FIRST VEHICLE COMPLETES ACCEPTANCE TEST.
3RD SUBMISSION (SVR): 60 CALENDAR DAYS FOLLOWING COMPLETION OF THE LAST SYSTEM VERIFICATION TEST IDENTIFIED IN THE GOVERNMENT INTEGRATED MASTER SCHEDULE AND COMMUNICATED TO THE CONTRACTOR AT THE PROGRAM MANAGEMENT
REVIEWS.
4TH AND 5TH SUBMISSIONS: 30 CALENDAR DAYS AFTER LRIP AND FRP (OPTIONS, IF EXERCISED).
BLOCK 14: CLASSIFIED CDRL SUBMISSION REQUIRED, IN ACCORDANCE WITH PARAGRAPH 2.6.2 OF ATTACHMENT 4.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: __X___ Other: __ __
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
COMMERCIAL DRAWINGS/MODELS AND
ASSOCIATED LISTS
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81003E
5. CONTRACT REFERENCE
SOW PARA 3.3.6.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1) TIME
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
N/A
Reg Repro
16. REMARKS
BLOCK 4: THE CONTRACTOR SHALL DELIVER THE FULLY ASSEMBLED BASELINE 3D CAD
MODEL AND DRAWING FILES, USED TO DESIGN THE ACV, IN PTC CREO PARAMETRIC 2.0
FORMAT, VIA PORTABLE HARD DRIVE WITH FIREWALL ACCESS. DELIVERY OF THE CAD
MODELS WILL BE DEEMED ACCEPTED ONLY IF PROVIDED FULLY ASSEMBLED AT THE TOP
LEVEL ASSEMBLY, AND OPENED PROPERLY WITHOUT ERRORS IN COMPLIANCE WITH PM
AAA GUIDELINES, PER ATTACHED ADDUNDUM. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE ACCURATE CONVERSION OF THE CAD MODEL FROM ITS NATIVE FORMAT INTO
THE REQUESTED PTC CREO FORMAT.
BLOCK 8: THE GOVERNMENT WILL HAVE 120 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 30 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCK 12: 360 CALENDAR DAYS AFTER FULL-RATE PRODUCTION (FRP) LOT 3 (OPTION, IF
EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND THE
Olree CIV Michael R
TDP OPTION SELECTION WORKSHEET
SYSTEM: DATE PREPARED:
A. CONTRACT NO.
B. EXHIBIT/ATTACHMENT
NO.
C. CLIN
D. CDRL DATA ITEM NO.
1. TDP Level (X and complete as applicable.)
A. CONCEPTUAL LEVEL
DEVELOPMENTAL LEVEL
PRODUCTION LEVEL
B. REMARKS:
2. TYPE AND FORMAT (X all that apply and complete as applicable)
A.
TYPE 2D: 2D DRAWINGS
TYPE 3D: 3D MODEL ONLY
TYPE 3D: 3D MODELS WITH
ASSOCIATED 2D DRAWINGS
B.
NATIVE CAD (SPECIFY TYPE) _______ ______________________
ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)
ISO32000 PORTABLE DOCUMENT FORMAT: _______
OTHER ELECTRONIC FORMAT (SPECIFY TYPE)
HARDCOPY:
REMARKS: ________________________________________________________
3. CAGE Code AND DOCUMENT
NUMBERS
A. CONTRACTOR CAGE AND DOCUMENT NUMBERS
GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)
D. To Be Assigned By:
B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:
4. DRAWING FORMATS (X one and complete as applicable)
CONTRACTOR FORMAT.
GOVERNMENT FORMAT.
REMARKS: _________________________________________________________________________________________
5. TDP ELEMENTS REQUIRED (X all that apply)
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:
CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS
DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS
PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST
COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST
QUALITY ASSURANCE PROVISIONS
SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS
SPECIFICATIONS
SOFTWARE DOCUMENTATION
SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST
6. ASSOCIATED LISTS (X and complete as applicable)
A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE
B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
E. INDENTURE DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)
7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)
ASME Y14.100
ENGINEERING DRAWING
PRACTICES WITH
APPENDICES
B C D E
ASME Y14.24 TYPES AND APPLICATIONS OF
ENGINEERING DRAWINGS
ASME Y14.34 ASSOCIATED LIST
ASME Y14.35 REVISION OF ENGINEERING DRAWINGS
AND ASSOCIATED LIST
ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES
ASME Y14.5 DIMENSIONING AND TOLERANCES
OTHER STANDARDS APPLY AS
DESCRIBED:
COMPANY STANDARDS
PERMITTED: YES NO
8. OTHER TAILORING
8. OTHER TAILORING, Continued:
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
MEETINGS/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A
5. CONTRACT REFERENCE
SOW PARA 3.2.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 10: AS REQUIRED BY STATEMENT OF WORK (SOW) AND ATTACHMENT 03, MEETING
LIST.
BLOCK 12: SEVEN (7) CALENDAR DAYS PRIOR TO THE FIRST CONTRACT MEETING, THE
CONTRACTOR SHALL PROVIDE A CONFERENCE AGENDA.
BLOCK 13: DURING ENGINEERING, MANUFACTURING AND DEVELOPMENT (EMD), LOW-
RATE INITIAL PRODUCTION (LRIP) AND FULL-RATE PRODUCTION (FRP) (OPTIONS, IF
EXERCISED), THE CONTRACTOR SHALL PROVIDE CONFERENCE AGENDAS SEVEN (7)
CALENDAR DAYS PRIOR TO ANY MEETING.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Mullins LtCol Kirk D
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
BRIEFING MATERIAL
3. SUBTITLE
PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL
DESIGN REVIEW (CDR) PRESENTATION
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81605
5. CONTRACT REFERENCE
SOW PARA 3.3.1.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1) TIME
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: THE PDR/CDR PRESENTATION SHALL INCLUDE THE FOLLOWING AS IT PERTAINS
TO THE ACV DESIGN:
1. DESCRIPTION OF THE SYSTEM DESIGN ARCHITECTURE AND SYSTEMS INTEGRATION TO
INCLUDE RELATIONSHIPS TO WORK BREAKDOWN STRUCTURE (WBS) ELEMENTS.
2. ALLOCATION OF REQUIREMENTS TO EACH OF THE HARDWARE CONFIGURATION ITEMS
(HWCI).
3. ALLOCATION OF REQUIREMENTS TO ANY SOFTWARE CONFIGURATION ITEM (SWCI)
HOSTED BY THE HWCI TO INCLUDE FIRMWARE, CALIBRATION AND LICENSES.
4. FINAL ASSESSMENT OF ESTABLISHED PRODUCT BASELINE AGAINST TIERED SYSTEM
SPECIFICATION REQUIREMENTS AND REQUIRED LOWER-TIER TRADES, ALONG WITH
SUPPORTING TRADE-OFF ANALYSES AND DATA.
5. WEIGHT ALLOCATION AND GROWTH ASSESSMENT.
6. LOAD PLAN REVIEW AND ASSESSMENTS.
7. HUMAN SYSTEMS INTEGRATION ASSESSMENT, INCLUDING DISPLAYS.
8. ENVIRONMENT, SAFETY, AND OCCUPATIONAL HEALTH (ESOH) ASSESSMENT.
9. GOVERNMENT FURNISHED PROPERTY (GFP) PROGRAM MANAGEMENT AND STATUS.
10. ASSESSMENT OF ACHIEVING QUALITY, MAINTAINABILITY, AND RELIABILITY
REQUIREMENTS.
11. STANDARDIZATION CONSIDERATIONS.
12. CORROSION PREVENTION/CONTROL CONSIDERATIONS.
13. TRANSPORTABILITY, PACKAGING, AND HANDLING CONSIDERATIONS.
14. SURVIVABILITY/VULNERABILITY ASSESSMENT.
15. MANUFACTURING READINESS ASSESSMENT.
16. TECHNICAL AND TRAINING MANUALS ASSESSMENT.
17. PROGRAM PROTECTION, INFORMATION ASSURANCE, AND ANTI-TAMPER STATUS.
18. PRODUCT BASELINE OF THE AS-BUILT CONFIGURATION TO INCLUDE WBS
RELATIONSHIP AND IDENTIFICATION OF CONTRACTOR FURNISHED AND GOVERNMENT
FURNISHED EQUIPMENT.
19. RISK ASSESSMENT AGAINST TECHNICAL, COST AND SCHEDULE, TO INCLUDE ESOH AND
HUMAN SYSTEM INTEGRATION.
20. COST ASSESSMENT OF ACV DESIGN.
21. PROGRAM MANAGEMENT STATUS.
Olree CIV Michael R
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A007)
BLOCK 8: THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING
OFFICER’S REPRESENTATIVE (COR) AND THE ALTERNATE COR.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
CONFERENCE REPORTS
3. SUBTITLE
MEETING/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81308A
5. CONTRACT REFERENCE
SOW PARA 3.2.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 8: THE GOVERNMENT WILL HAVE SEVEN (7) CALENDAR DAYS TO REVIEW AND
PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT.
THE CONTRACTOR SHALL HAVE THREE (3) CALENDAR DAYS TO UPDATE THE TECHNICAL
CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE FIVE
(5) CALENDAR DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCK 10: AS REQUIRED BY STATEMENT OF WORK (SOW) AND ATTACHMENT 03, MEETING
LIST.
BLOCKS 12 AND 13: THE CONTRACTOR SHALL SUBMIT THE CONFERENCE MINUTES WITHIN
SEVEN (7) CALENDAR DAYS AFTER EACH MEETING/REVIEW.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
STATUS REPORT
3. SUBTITLE
MONTHLY PROGRESS STATUS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
SOW PARA 3.2.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MONTHLY
12. DATE OF FIRST
SUBMISSION
60 DAC
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
MONTHLY
BLOCK 4: DI-MGMT-80368A IS TAILORED AS FOLLOWS: EXCEPT CONTENT DESCRIBED IN
3.2.3 ITEMIZED MAN-HOURS AND COSTS.
BLOCK 8: THE GOVERNMENT WILL PROVIDE COMMENTS WITHIN 10 CALENDAR DAYS FOR
INCORPORATION INTO NEXT DELIVERABLE.
BLOCK 10: THE MONTHLY PROGRESS STATUS REPORT SHALL BE DELIVERED TO THE
GOVERNMENT NO LATER THAN THE LAST BUSINESS DAY OF EACH MONTH.
BLOCK 13: 60 CALENDAR DAYS AFTER INITIAL SUBMISSION, THEN MONTHLY THROUGH THE
END OF THE BASE CONTRACT.
60 CALENDAR DAYS AFTER LRIP (OPTION, IF EXERCISED), THEN MONTHLY THROUGH THE
END OF LRIP OPTIONS.
60 CALENDAR DAYS AFTER FRP (OPTION, IF EXERCISED), THEN MONTHLY THROUGH THE
END OF FRP OPTIONS.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
INTEGRATED PROGRAM MANAGEMENT REPORT
(IPMR)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861
5. CONTRACT REFERENCE
SOW PARA 3.2.4.1 / 3.2.4.2 / 3.2.4.3 / 3.2.13.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 8: THE GOVERNMENT WILL HAVE 21 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS. THE CONTRACTOR SHALL HAVE SEVEN (7) CALENDAR DAYS TO MAKE
CORRECTIONS AND RESUBMIT FOR APPROVAL.
BLOCK 4: THE CONTRACTOR SHALL PROVIDE A MONTHLY IPMR PER DATA ITEM
DESCRIPTION (DID) DI-MGMT-81861 AND IT SHALL BE DEVELOPED IN ACCORDANCE WITH DoD INTEGRATED MASTER PLAN (IMP) AND SCHEDULE GUIDE (V0.9 DATED 21 OCT 05), EXCEPT AS
MODIFIED PER THE FOLLOWING:
BLOCKS 10, 12, 13: INITIAL SUBMISSIONS, SUBSEQUENT SUBMISSIONS, & FREQUENCY:
FORMAT 5 – NARRATIVE REPORT SUBMISSIONS:
BLOCK 12:
• DRAFT NARRATIVE REPORT SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING
PERIOD WHICH OCCURS APPROXIMATELY 60 CALENDAR DAC AWARD.
• FINAL NARRATIVE REPORT SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING
PERIOD WHICH OCC URS APPROXIMATELY 90 CALENDAR DAC AWARD.
BLOCKS 10 AND 13:
• NARRATIVE REPORT SUBSEQUENT MONTHLY SUBMISSIONS SHALL BE PROVIDED
MONTHLY AFTER SUBMISSION OF THE FINAL NARRATIVE REPORT DUE 15 CALENDAR DAYS
AFTER THE CLOSE OF BUSINESS OF THE CONTRACTOR ACCOUNTING PERIOD.
FORMAT 6 - CONTRACT IMP SUBMISSIONS:
BLOCK 12:
• DRAFT CONTRACT IMP SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD
WHICH OCCURS APPROXIMATELY 60 CALENDAR DAC AWARD.
• FINAL CONTRACT IMP SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD
WHICH OCCURS APPROXIMATELY 90 CALENDAR DAC AWARD.
BLOCKS 10 AND 13:
• AS REQUIRED:
Bradley CIV Walter M
Atkinson CIV Dustin J
17. PRICE
GROUP
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A010)
FORMAT 6 – CONTRACT IMS SUBMISSIONS:
• DRAFT CONTRACT IMS SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 60
CALENDAR DAC AWARD.
• FINAL CONTRACT IMS SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90
CALENDAR DAC AWARD.
BLOCKS 10 AND 13:
• IMS SUBSEQUENT MONTHLY SUBMISSIONS SHALL BE PROVIDED MONTHLY AFTER SUBMISSION OF THE FINAL IMS DUE 15
CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF THE CONTRACTOR ACCOUNTING PERIOD.
FORMAT 6 - SCHEDULE RISK ASSESSMENT (SRA) SUBMISSIONS:
• THE FIRST SRA SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90 CALENDAR
DAC AWARD.
BLOCKS 10 AND 13:
• SRA SUBSEQUENT SUBMISSIONS SHALL BE PROVIDED QUARTERLY AFTER THE INITIAL SRA. THE SRA SHALL BE COMPLETED AND AVAILABLE FOR GOVERNMENT APPROVAL AND COMMENT 15 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF EVERY THREE (3)
CONTRACTOR’S ACCOUNTING PERIODS (QUARTERLY).
FORMAT FIVE (5) INSTRUCTIONS:
• THE CONTRACTOR SHALL DELIVER A NARRATIVE REPORT WITH IMS ANALYSIS AND CRITICAL PATH DISCUSSION.
• ALL SRA INPUT DATA, METHODOLOGY AND ANALYSIS SHALL BE PROVIDED IN THE NARRATIVE REPORT.
FORMAT SIX (6) INSTRUCTIONS:
THE CONTRACT IMP:
• THE CONTRACT IMP SHALL TIE DIRECTLY TO THE GOVERNMENT PROVIDED PROGRAM IMP. ALL CONTRACTOR RECOMMENDED UPDATES TO THE PROGRAM IMP SHALL BE SUBMITTED AS REQUIRED FOR REVIEW AND APPROVAL BY THE GOVERNMENT.
• THE CONTRACT IMP SHALL BE DELIVERED USING THE COMMERCIAL OFF-THE-SHELF (COTS) SOFTWARE, MICROSOFT (MS) OFFICE
EXCEL 2010 OR LATER SUPPORTED VERSION.
THE CONTRACT IMS:
• THE CONTRACT IMS SHALL INCLUDE ALL DISCRETE WORK. SUBCONTRACTORS WITH FLOWDOWN SHALL BE INCORPORATED WITH
SUFFICIENT DETAIL TO DEVELOP A REALISTIC CRITICAL PATH.
• THE CONTRACTOR SHALL UPDATE THE IMS AT A MINIMUM ON A MONTHLY BASIS WITH A STATUS DATE AS OF THE LAST DAY OF THE
ACCOUNTING MONTH. THE CONTRACTOR SHALL CONDUCT MONTHLY STATUS REVIEWS.
• THE CONTRACT IMS SHALL BE DELIVERED USING THE COTS SOFTWARE, MS OFFICE PROJECT 2010 OR LATER SUPPORTED
VERSION.
THE SRA:
• THE PROJECT FILE INCLUDING SRA DATA FIELDS SHALL BE DELIVERED USING THE COTS SOFTWARE, MS OFFICE PROJECT 2010
VERSION OR LATER SUPPORTED VERSION.
BLOCK 14: THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND
THE ALTERNATE COR.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
CONTRACT WORK BREAKDOWN STRUCTURE
(CWBS)
3. SUBTITLE
CWBS INDEX AND DICTIONARY
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
SOW PARA 3.2.5
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLOCK 8: THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON ALL COST AND SOFTWARE DATA REPORTING (CSDR) SUBMISSIONS (TO
INCLUDE THE CWBS DICTIONARY AND STRUCTURE). THE CONTRACTOR SHALL REVIEW
AND INCORPORATE GOVERNMENT COMMENTS WITHIN SEVEN (7) CALENDAR DAYS AND
RESUBMIT TO THE GOVERNMENT.
BLOCKS 10 , 12 AND 13: THE CONTRACTOR SHALL PREPARE THE CWBS IN ACCORDANCE
WITH DI-MGMT-81334D AND THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY
DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED CONTRACT CSDR PLAN. THE DATA ITEM
DESCRIPTION (DID), DI-MGMT-81334D, IS AVAILABLE FROM THE DEFENSE COST AND
RESOURCE CENTER (DCARC) WEBSITE AT HTTP://DCARC.CAPE.OSD.MIL. THE CSDR PLAN
IS INCLUDED AS CONTRACT ATTACHMENT 06.
THE CONTRACTOR SHALL SUBMIT THE CWBS DICTIONARY AT FREQUENCIES SPECIFIED IN
THE OSD DDCA-APPROVED CONTRACT CSDR PLAN AND IN THE CONTRACT. THE
CONTRACT CSDR PLAN USES THE EVENT FIELD AS THE DRIVER FOR THE SUBMISSION OF
THE REPORTS, NOT THE "AS OF DATE." IF THE EVENT SLIPS, THE CONTRACTOR MUST
NOTIFY THE GOVERNMENT PROGRAM OFFICE THAT A DATE CHANGE IS NEEDED. IT IS THE
RESPONSIBILITY OF THE GOVERNMENT PROGRAM OFFICE TO SUBMIT A REQUEST FOR
CHANGE IN THE EVENT-DRIVEN DATE FOR REPORTING THROUGH THE CSDR SUBMIT-
REVIEW SYSTEM FOR DCARC APPROVAL BEFORE THE DATE REFLECTED IN THE OSD DDCA-
APPROVED CSDR PLAN.
BLOCK 14: THE CWBS DICTIONARY SHALL BE SUBMITTED ELECTRONICALLY USING THE
CSDR SUBMIT-REVIEW SYSTEM. DATA SUBMITTERS MUST REGISTER THROUGH THE
DCARC WEBSITE AND POSSESS A DoD-APPROVED EXTERNAL CERTIFICATION AUTHORITY (ECA) DIGITAL CERTIFICATE OR A DoD-ISSUED COMMON ACCESS CARD (CAC) TO OBTAIN A
DCARC PORTAL ACCOUNT AND BE AUTHORIZED TO UPLOAD CSDR CONTENT. USERS CAN
OBTAIN ACCESS BY SUBMITTING USER INFORMATION ABOUT THEMSELVES AND THEIR
ORGANIZATIONS TO THE DCARC PORTAL AND REQUESTING A CSDR SUBMITTER USER
ROLE.
AFTER THE REGISTRATION INFORMATION HAS BEEN VERIFIED, THE DCARC SHALL
AUTHORIZE THE USER ACCOUNT AND REQUESTED ROLE. ALL DCARC PORTAL ACCOUNTS
NEED TO BE RENEWED AT LEAST ANNUALLY.
Woodley CIV Damien N
Myers CIV James A
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A011)
SUBCONTRACTOR REPORTING: THE PRIME CONTRACTOR SHALL FLOW DOWN CSDR REQUIREMENTS CONTAINED IN THE PRIME CONTRACT TO ALL SUBCONTRACTORS WHO MEET THE REPORTING THRESHOLDS SPECIFIED IN THE DODI 5000.02, OR AS REQUIRED BY THE COST WORKING INTEGRATED PRODUCT TEAM (CWIPT). THIS INCLUDES REQUIRING SUBCONTRACTORS TO ELECTRONICALLY
REPORT DIRECTLY TO THE DCARC USING THE CSDR SUBMIT-REVIEW SYSTEM.
THE PRIME CONTRACTOR SHALL WORK WITH THE CWIPT AND ALL APPROPRIATE SUBCONTRACTORS TO PREPARE SEPARATE
SUBCONTRACT CSDR PLANS FOR SUBMISSION TO THE DCARC FOR DDCA APPROVAL.
EFFECTIVE JULY 1, 2014, ALL CONTRACTORS, DIRECT REPORTING SUBCONTRACTORS, AND OTHER ENTITIES REPORTING UNDER THE MAY 2011 DATA ITEM DESCRIPTIONS (DI-FNCL-81565C, DI-FNCL-81566C, DI-FNCL-81567C), ARE REQUIRED TO SUBMIT CCDRS AS STAND- ALONE EXCEL-COMPATIBLE FILES AND AS DCARC APPROVED EXTENSIBLE MARKUP LANGUAGE (XML) FILES TO THE DCARC’S SECURE WEB SITE USING THE CSDR SUBMIT-REVIEW SYSTEM. THE DIDS ALREADY REQUIRE THE TWO (2) FORMATS. THE DCARC IS NOW ENFORCING THE REQUIREMENT FOR THE XML FILE. THE XML FILES CAN BE GENERATED AUTOMATICALLY FROM THE EXCEL- COMPATIBLE FILES (OR VICE VERSA) WITH DCARC’S CPET SOFTWARE TOOL. ALL VALIDATIONS STARTING JULY 1, 2014 WILL BE CONDUCTED ON THE XML FILES. THE VALIDATIONS WILL COVER BOTH CONTENT AND FORMAT. FOR THE CWBS SUBMISSION ONLY; ALL CONTRACTORS, DIRECT REPORTING SUBCONTRACTORS, AND OTHER ENTITIES REPORTING CWBS DICTIONARIES ARE REQUIRED TO SUBMIT IN THE MICROSOFT EXCEL FILE FORMAT SPECIFIED IN DI-MGMT-81334D. NO XML FORMAT IS REQUIRED FOR CWBS SUBMISSIONS. THE CWBS TEMPLATE FORMAT CAN BE OBTAINED THROUGH DCARC’S CPET SOFTWARE TOOL. UPON CONTRACT AWARD, THE GOVERNMENT WILL PROVIDE THE PRIME CONTRACTOR WITH ALL APPLICABLE CSDR CPET FILES (INCLUDES THE PROGRAM PLAN AND THE CONTRACTOR PLANS) SO THAT THE CONTRACTOR CAN CONVERT THE CSDR DATA INTO XML FILE FORMATS.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: ____
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 250 REQ
9.
DIST STATEMENT
REQUIRED
10. FREQUENCY
12. DATE OF FIRST
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT
RESERVED
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
COST DATA SUMMARY REPORT(CDSR) (DD FORM
1921)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81565C
5. CONTRACT REFERENCE
SOW PARA 3.2.8.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON ALL COST AND SOFTWARE DATA REPORTING (CSDR) SUBMISSIONS. THE
CONTRACTOR SHALL REVIEW AND INCORPORATE GOVERNMENT COMMENTS WITHIN
SEVEN (7) CALENDAR DAYS AND RESUBMIT TO THE GOVERNMENT.
BLOCKS 10, 12 AND 13: THE CONTRACTOR SHALL PREPARE THE CDSR IN ACCORDANCE
WITH DI-FNCL-81565C AND THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY
DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED CONTRACT CSDR PLAN. THE DATA
ITEM DESCRIPTION (DID), DI-FNCL-81565C, IS AVAILABLE FROM THE DEFENSE COST AND
RESOURCE CENTER (DCARC) WEBSITE AT HTTP://DCARC.CAPE.OSD.MIL. THE CSDR PLAN
IS INLCUDED AS CONTRACT ATTACHMENT 06. THE CONTRACTOR SHALL SUBMIT THE
CONTRACTOR COST DATA REPORTS (CCDRs) AT FREQUENCIES SPECIFIED IN THE OSD
DDCA-APPROVED CSDR PLAN AND IN THE CONTRACT. THE CONTRACT CSDR PLAN USES
THE EVENT FIELD AS THE DRIVER FOR THE SUBMISSION OF THE REPORTS, NOT THE "AS
OF" DATE. IF THE EVENT SLIPS, THE CONTRACTOR MUST NOTIFY THE GOVERNMENT
PROGRAM OFFICE THAT A DATE CHANGE IS NEEDED. IT IS THE RESPONSIBILITY OF THE
GOVERNMENT PROGRAM OFFICE TO SUBMIT A REQUEST FOR A CHANGE IN THE EVENT-
DRIVEN DATE FOR REPORTING THROUGH THE CSDR SUBMIT-REVIEW SYSTEM FOR DCARC
APPROVAL BEFORE THE DATE REFLECTED IN THE OSD DDCA-APPROVED CSDR PLAN.
BLOCK 14: ALL CCDRS SHALL BE SUBMITTED ELECTRONICALLY USING THE CSDR SUBMIT-
REVIEW SYSTEM. ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC
COPY TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND ALTERNATE COR.
THE REQUIRED FORM AND FILE TYPE FOR EACH CCDR IS SPECIFIED IN ITS DID. DATA
SUBMITTERS SHALL REGISTER THROUGH THE DCARC WEBSITE AND POSSESS A DoD- APPROVED EXTERNAL CERTIFICATION AUTHORITY (ECA) DIGITAL CERTIFICATE OR DoD-
ISSUED COMMON ACCESS CARD (CAC) TO OBTAIN A DCARC PORTAL ACCOUNT AND BE
AUTHORIZED TO UPLOAD CSDR CONTENT. USERS CAN OBTAIN ACCESS BY SUBMITTING
USER INFORMATION ABOUT THEMSELVES AND THEIR ORGANIZATIONS TO THE DCARC
PORTAL AND REQUESTING A CSDR SUBMITTER USER ROLE.
AFTER THE REGISTRATION INFORMATION HAS BEEN VERIFIED, THE DCARC SHALL
AUTHORIZE THE USER ACCOUNT AND REQUESTED ROLES. ALL DCARC PORTAL ACCOUNTS
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 3
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A013)
SUBCONTRACTOR REPORTING: THE PRIME CONTRACTOR SHALL FLOW DOWN CSDR REQUIREMENTS CONTAINED IN THE PRIME CONTRACT TO ALL SUBCONTRACTORS WHO MEET THE REPORTING THRESHOLDS SPECIFIED IN THE DODI 5000.02, OR AS REQUIRED BY THE COST WORKING INTEGRATED PRODUCT TEAM (CWIPT). THIS INCLUDES REQUIRING SUBCONTRACTORS TO ELECTRONICALLY
REPORT DIRECTLY TO THE DCARC USING THE CSDR SUBMIT-REVIEW SYSTEM.
THE PRIME CONTRACTOR SHALL BE REQUIRED TO WORK WITH THE CWIPT AND ALL APPROPRIATE SUBCONTRACTORS TO PREPARE
SEPARATE SUBCONTRACT CSDR PLANS FOR SUBMISSION TO THE DCARC FOR DDCA APPROVAL.
EFFECTIVE JULY 1, 2014, ALL CONTRACTORS, DIRECT REPORTING SUBCONTRACTORS, AND OTHER ENTITIES REPORTING UNDER THE MAY 2011 DATA ITEM DESCRIPTIONS (DI-FNCL-81565C, DI-FNCL-81566C, DI-FNCL-81567C), ARE REQUIRED TO SUBMIT CCDRS AS STAND- ALONE EXCEL-COMPATIBLE FILES AND AS DCARC APPROVED EXTENSIBLE MARKUP LANGUAGE (XML) FILES TO THE DCARC’S SECURE WEB SITE USING THE CSDR SUBMIT-REVIEW SYSTEM. THE DIDS ALREADY REQUIRE THE TWO (2) FORMATS. THE DCARC IS NOW ENFORCING THE REQUIREMENT FOR THE XML FILE. THE XML FILES CAN BE GENERATED AUTOMATICALLY FROM THE EXCEL- COMPATIBLE FILES (OR VICE VERSA) WITH DCARC’S CPET SOFTWARE TOOL. ALL VALIDATIONS STARTING JULY 1, 2014 WILL BE CONDUCTED ON THE XML FILES. THE VALIDATIONS WILL COVER BOTH CONTENT AND FORMAT. UPON CONTRACT AWARD, THE GOVERNMENT WILL PROVIDE THE PRIME CONTRACTOR WITH ALL APPLICABLE CSDR CPET FILES (INCLUDES THE PROGRAM PLAN AND THE CONTRACTOR PLANS) SO THAT THE CONTRACTOR CAN CONVERT THE CSDR DATA INTO XML FILE FORMATS.
PER THE COST AND SOFTWARE DATA REPORTING (CSDR) MANUAL, DODM 5000.04-M-1, ALL CONTRACTORS, DIRECT REPORTING SUBCONTRACTORS, AND OTHER ENTITIES REPORTING CSDR DATA MUST REPORT TOTAL CONTRACT VALUE. FOR CCDR PURPOSES, CONTRACT VALUE SHALL REPRESENT THE ESTIMATED PRICE AT CONTRACT COMPLETION (I.E., INITIAL CONTRACT AWARD PLUS ALL EXPECTED AUTHORIZED CONTRACT CHANGES) AND BE BASED ON THE ASSUMPTION THAT ALL CONTRACT OPTIONS SHALL BE EXERCISED.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .