CDRL_A031.pdf

PDF 731 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

CDRL A031

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle 1. 1, newest first.
File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
CDRL_A060.pdf PDF
Attachment_23_-_ACV_1.1_RFP_DD254_M67854-15-R-0001__20150429.pdf PDF
Attachment_10.2_-_GFP_Report_ACV_2015_04_21.pdf PDF
CDRL_A010.pdf PDF
Amendment_4.pdf PDF
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
CDRL_A058.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
M67854-15-R-0001-0002.pdf PDF
M67854-15-R-0001-0001.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
Attachment_11_-_Test_Schedules_and_Test_Locations_150406.docx DOCX document
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_30_-_Integrated_Data_Environment.docx DOCX document
Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx PPTX presentation
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Attachment_05_-_COVER.docx DOCX document
Attachment_26_-_Technical_Instructions.doc DOC document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
Attachment_28_-_COVER.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_27_-_Contractor_Request_to_use_Prohibited_Material.pdf PDF
Attachment_14_-_ACV_IUID_Plan_Signed.pdf PDF
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
Attachment_28_-_ACV_1.1_CWBS_Index_and_Dictionary.xlsx XLSX spreadsheet
Attachment_10.2_-_GFP_Report_ACV_2015_03_20.pdf PDF
Attachment_06.1_-_ACV_PLAN_EMD_Signed_Approved_Contract_Plan_N-14-G-C1.pdf PDF
Attachment_02_-_COVER_150319.docx DOCX document
Attachment_16.2_-_TABLE_A-II_Oper_and_Combined_Oper_Maint_Rqumts.docx DOCX document
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
Attachment_03_-_Meeting_List_150319.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
1_ACV_1.1_CDRLs_03192015.pdf PDF
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Show all 50

Amphibious Combat Vehicle 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TM: _____ TDP: ___X__ Other: ____

D. SYSTEM/ITEM

AMPHIBIOUS COMBAT VEHICLE (ACV)

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

TBD

1. DATA ITEM NO.

A031

2. TITLE OF DATA ITEM

PRODUCT DRAWINGS/MODELS AND ASSOCIATED

LISTS

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81002E

5. CONTRACT REFERENCE

SOW PARA 3.3.6.1

6. REQUIRING OFFICE

PROGRAM MANAGER

ADVANCED AMPHIBIOUS

ASSAULT (PM AAA)

7. DD 250 REQ

LT

9.

DIST STATEMENT

REQUIRED

SEE BLOCK 16

10. FREQUENCY

ONE (1) TIME

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: THE CONTRACTOR SHALL DELIVER THE FULLY ASSEMBLED BASELINE 3D CAD

MODEL AND DRAWING FILES, USED TO DESIGN THE ACV, IN PTC CREO PARAMETRIC 2.0

FORMAT, VIA PORTABLE HARD DRIVE WITH FIREWALL ACCESS. DELIVERY OF THE CAD

MODELS WILL BE DEEMED ACCEPTED ONLY IF PROVIDED FULLY ASSEMBLED AT THE TOP

LEVEL ASSEMBLY, AND OPENED PROPERLY WITHOUT ERRORS IN COMPLIANCE WITH PM

AAA GUIDELINES, PER ATTACHED ADDUNDUM. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR THE ACCURATE CONVERSION OF THE CAD MODEL FROM ITS NATIVE FORMAT INTO

THE REQUESTED PTC CREO FORMAT.

BLOCK 8: THE GOVERNMENT WILL HAVE 120 CALENDAR DAYS TO REVIEW AND PROVIDE

COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE

CONTRACTOR SHALL HAVE 30 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT

DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR

DAYS TO ACCEPT THE SUBMISSION.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT

OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;

ADMINISTRATIVE/OPERATIONAL USE, 19 APR 2012. OTHER REQUESTS SHALL BE REFERRED

TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET,

QUANTICO, VA 22135-6050.

BLOCK 12: 360 CALENDAR DAYS AFTER FULL-RATE PRODUCTION (FRP) LOT 3 (OPTION, IF

EXERCISED).

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN

ELECTRONIC COPY TO THE CONTRACTING OFFICER’S REPRESENTATIVE (COR) AND

ALTERNATE COR.

SEE BLOCK 16

15. TOTAL

G. PREPARED BY

Olree CIV Michael R

H. DATE

I. APPROVED BY

Was CIV Joseph E

J. DATE

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1

TDP OPTION SELECTION WORKSHEET

SYSTEM: DATE PREPARED:

A. CONTRACT NO.

B. EXHIBIT/ATTACHMENT

NO.

C. CLIN

D. CDRL DATA ITEM NO.

1. TDP Level (X and complete as applicable.)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODEL ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) _______ ______________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)

ISO32000 PORTABLE DOCUMENT FORMAT: _______

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

HARDCOPY:

REMARKS: ________________________________________________________

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS:

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: _________________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply)

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST

6. ASSOCIATED LISTS (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

E. INDENTURE DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES WITH

APPENDICES

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35 REVISION OF ENGINEERING DRAWINGS

AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCES

OTHER STANDARDS APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED: YES NO

8. OTHER TAILORING

8. OTHER TAILORING, Continued:

1_ACV_1.1_CDRLs_03192015 51
CDRL A031 OSW
A CONTRACT NO:
C CLIN: 6005
D CDRL DATA ITEM NO: A031
CONCEPTUAL LEVEL: Off
DEVELOPMENTAL LEVEL: Off
PRODUCTION LEVEL: On
B REMARKS:
TYPE 2D 2D DRAWINGS: Off
TYPE 3D 3D MODEL ONLY: Off
TYPE 3D 3D MODELS WITH: On
NATIVE CAD SPECIFY TYPE: On
undefined: PTC CREO PARAMETRIC 2.0 AT ASSEMBLY, PART, AND DRAWING LEVEL
ISO 10303 STEP FORMAT Specify STEP PROTOCOL AP203 AP 214 etc: On
undefined_3: AP214 OR AP203 (INCLUDED MASS & MATERIAL PROPERTIES AND CENTER OF GRAVITY)
ISO32000 PORTABLE DOCUMENT FORMAT: On
undefined_4: ADOBE ACROBAT AT MINIMUM 200DPI
OTHER ELECTRONIC FORMAT SPECIFY TYPE: Off
undefined_5: DWG OR PDF
HARDCOPY: Off
REMARKS:
CONTRACTOR CAGE AND DOCUMENT NUMBERS: Off
GOVERNMENT CAGE COMPLETE 3B 3C OR 3D: On
D To Be Assigned By: ACV CM REP
B USE CAGE CODE: TBD
C USE DOCUMENT NUMBERS: TBD
CONTRACTOR FORMAT: Off
GOVERNMENT FORMAT: On
REMARKS_2:
ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOROR THE FOLLOWING ARE REQUIRED: Off
CONCEPTUAL DRAWINGSMODELS AND ASSOCIATED LISTS: Off
DEVELOPMENTAL DESIGN DRAWINGSMODELS AND ASSOCIATED LISTS: Off
PRODUCT DRAWINGSMODELS AND ASSOCIATED LIST: On
COMMERCIAL DRAWINGSMODELS AND ASSOCIATED LIST: Off
QUALITY ASSURANCE PROVISIONS: On
SPECIAL INSPECTION EQUIPMENT SIE DRAWINGSMODELS AND ASSOCIATED LISTS: Off
SPECIFICATIONS: On
SOFTWARE DOCUMENTATION: On
SPECIAL PACKAGING INSTRUCTIONS SPI DRAWINGSMODELS AND ASSOCIATED LIST: On
undefined_7: On
undefined_6: On
undefined_9: Off
undefined_8: Off
undefined_10: Off
1 NOT REQUIRED: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY: Off
1 NOT REQUIRED_2: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_2: Off
undefined_11: On
1 NOT REQUIRED_3: Off
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_3: On
E INDENTURE DATA LIST X ONE: Off
1 NOT REQUIRED_4: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_4: Off
F APPLICATION LISTS X ONE: Off
1 NOT REQUIRED_5: On
2 REQUIRED SPECIFY LEVELS OF ASSEMBLY_5: Off
ASME Y14100: On
B: On
C: On
D: On
E: On
ASME Y1424 TYPES AND APPLICATIONS OF: On
ASME Y1434 ASSOCIATED LIST: On
ASME Y1435 REVISION OF ENGINEERING DRAWINGS: On
ASME Y1441 DIGITAL PRODUCT DATA PRACTICES: On
ASME Y145 DIMENSIONING AND TOLERANCES: On
OTHER STANDARDS APPLY AS: Off
COMPANY STANDARDS: NO
8 OTHER TAILORING: Metadata Attributes - All 3D CAD parts and assemblies shall incorporate Parameter ID and Descriptions per Enclosure 3 of Attachment 17 for Government configuration and data management requirements.

Continued on PAGE 2.

Exhibit or Attachment: A
Hardcopy:
Date Prepared: 23 March 2015
Name of System: ACV 1.1
Other Standard:
8 OTHER TAILORING Continued: Solid Model Geometric Validation Proprieties (GVP) Checks. Contractor shall conduct geometric validation properties checks on all Government native (fully defined feature based parametric) part and assembly solid models. Disregard manufacturing process models.

The minimum 3-D Component Geometry, Assembly Construction, Validation Checks are:

3-D Component Geometry

1) Each model must contain only 1 solid.

2) Models are single part files consisting of modeling entities and attributes.

3) Models contain drafting entities necessary to present geometrical dimensioning and tolerancing information.

4) Models are generated for every part number that is production intent, production related, or planned prototype.

5) No reference geometry models reside within the model.

6) Models contain no surface data (non-commercial components).

7) Parameters (attributes) are present and contain acceptable values.

8) Models contain proper density

9) Layers contain correct objects.

10) Models contain coordinate system.

11) Models that are positioned in more than one location on the vehicle end-item shall be designated at the absolute coordinated system and located in the vehicle end-item position in the assembly. All other models shall be designated in this vehicle position.

12) Models are saved in an isometric view.

13) Models and views not used are deleted.

14) All corner and fillet radii are modeled

15) All unnecessary wireframes are deleted.

16) Models passed all native CAD system (design software) solid model validation checks.

17) Models passed all interference checks (bolt/nut and gasket is ok).

18) Models contain no tiny objects or tiny edges.

19) Modeling tolerances applied in accordance with Contractor’s geometry and CAD creation standard. A default tolerance value shall be indicated in standard.

20) Model does not have any unnecessary parent/child relationships.

3-D Assembly Construction

21) Assembly contains CSYS/WCS displayed in absolute zero (x=0, y=0, z=0).

22) Assembly in body position.

23) Assembly can contain standard parts; however, standard parts must be UNMODIFIED from original.

24) Assembly is fully constrained.

3-D Component and Assembly in Explicit Non-Parametric Merged Solid Shrink-Wrap Format

25) Part and assemblies in merged solid format.

26) Complete with sufficient envelope.

27) Accurate mounting and mating dimensions (interfaces to Government baseline configuration items).

28) Body position in accordance with absolute coordinate system.

29) Includes applicable interface characteristics.

30) Current mass proprieties, weight, center of gravity and inertia information.

31) Incorporation of user-defined TDP metadata attributes.

32) Quality level at highest reasonable selection.

33) Skeletons, quilts, and small surfaces removed.

34) Real colors not gray-neutral colors presented.

File details come from the government source that posted it. Updated .