Summary of Changes for Amendments 1 - 4.
View the file
Other files for this federal contract opportunity
Show all 50
Amphibious Combat Vehicle 1. 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Amendment No. 1 – Changes to Documents - Through 04/17/15 (Round 1 Q&As also provided)
· Attachment 1 – SOW
· Section 3.6.4.1.2 – “up to the beginning of Government organic supply support” was removed from the end of the 2nd sentence
· Attachment 11 – Test Schedules and Test Locations
· Updated vehicle shipment table in response to RFP Question. The FUSL vehicles now ship from the Contractor’s facility to Aberdeen, Md.
· Attachment 23 – DoD Contract Security Class. Spec (DD form 254)
· Modified to change the solicitation date from 20150409 to 20150518, modified language for 10j, “FOUO”, and eliminate FOUO attachment
· Attachment 29 – Test and Evaluation Master Plan (TEMP) updated to add export warnings
· Attachment 31 – Contractor’s Requirements Analysis updated to add export warnings
· Attachment 32 – ACV 1.1 MS C Entrance Criteria
· Updated to add Export Warnings RFP Amendment No. 2 – Q&As – Round 2 RFP Amendment No. 3 – Q&As – Round 3 RFP Amendment No. 4 – Changes to Documents - 4/20/15-4/29/15 Updates
· Attachments – Updated as follows:
· Attachment 1 – Updated as follows:
· SOW Crosswalk updated for TDP updates for final TDP submissions – CLIN 6005
· SOW Section 3.5.1.7 updated to replace reference to “Figures (1) and (2)” with “Table 5” in 2nd paragraph
· Attachment 05 - ACV 1.1 IMP has been updated as follows:
· Added to: Event ACV05.07.(105-120) Build Vehicles V23-V26
· Added: ACV05.13 LRIP - LRIP Manufacturing Quality Completed
· Added: ACV05.13.01 LRIP - LRIP Vehicle First Article Test (FAT) Completed
· Attachment 10 – GFP/GFI List amended as follows:
· 10.1 and 10.2:
· Separated Antennas, Cables, and Mounting Trays from the Radios
· Updated NSNs and Part numbers for accuracy
· Revised quantities for accuracy, including increasing the quantity of RWS from 16 to 32 vehicle sets
· Reduced number of Multiband Radio Kits from 64 to 56 and added 8 Kits without radios (live fire vehicles will not have radios installed)
· Removed h/w that was not applicable and added components for accuracy
· Added a column "Control Item"
· Revised Reliability and Weight numbers for accuracy
· Revised overall structure for ease of viewing/printing
· 10.3:
· Added RWS 3D model and associated drawing number
· Corrected minor typos
· Attachment 11 – Test Schedules and Test Locations
· Updated the Training Start for the TTP Development Activities from "120 days prior to the start of TTP activities" to "30 days after the start of GDT"
· Corrected the number of EMD vehicles at ATC in test month 7.
· Attachment 16.1- Marine Corps Stock list updated to remove the Distribution List assignment and FOUO marking
· Attachment 21 –Updated before/during/after values to match current P-Spec and CDD values
· Attachment 23 – DoD Security Classification Specification (DD Form 254) was updated to add Paragraph 11h to the continuation sheets
· CDRLS updated as follows:
· CDRL A010 – Updated for administrative changes
· CDRL A031 - Added Options Selection Worksheet
· CDRL A058 - Deleted Option Selection Worksheet - not applicable
· CDRL A059 - Replaced Option Selection Worksheet with correct OSW
· CDRL A060 - Added Option Selection Worksheet
· CDRL A118 - Replaced Option Selection Worksheet with correct OSW
· CDRL A129 - Replaced Option Selection Worksheet with correct OSW
· Section B updated as follows:
· CLINs 2001-2004 and 3001 – 3003 added language in extended description stating “Offerors will be provided the opportunity to re-price all the LRIP CLINs prior to LRIP exercise”
· Section G updated as follows:
· Updated for FAR 52.245-1, Alt I clarification
· Section H updated as follows:
· Adjusted (FAR part 15 procedures)
· Section J – Updated to reflect:
· Administrative changes
· Section L updated as follows:
· L.5 – References to Davis Defense Group, URS, and SEI were removed
· Section L Clauses – Removed clause 52.215-20 and added 52.215-20, Alt IV
· L.10.1 – 10 X 10 Graphs were removed from description
· L.10.1 – Instructions were modified to remove section numbers
· L.11 – First paragraph – formatting instructions amended
· L.11 – Second to last paragraph amended to allow excerpts of test reports
· L.11 – Updated Classified Annex to “1 Original, 4 Hard Copies, and 2 CDs”
· L.11 – Updated Technical Volume to “1 Original, 5 Hard Copies”
· L.16.4 – Added the word “survivability” to the paragraph
· L.17 – Added reference to TRCM
· L.18.4 – Added reference to TRCM
· L.18.5 – Added a place for Energy (substantiating) data
· L.22 – Documentation of Secret FCL to be submitted in Volume 9
· L.22 – Clarified Offeror shall submit Target Cost, Target Profit, Total Target Price and Ceiling Price for FRP NTE CLINs
· L.22.2 – Third sentence paragraph L – Provided Volume 9 vs Annex
· Section M updated as follows:
· Section M.5.2.5- added language on unbalanced pricing
· Clarified the inclusion of CLIN 6005 in Total Evaluated Price