Attachment_06.1_-_ACV_PLAN_EMD_Signed_Approved_Contract_Plan_N-14-G-C1.pdf

PDF 820 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 06.1 - ACV_PLAN_EMD_Signed Approved_Contract Plan_N-14-G-C1

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle 1. 1, newest first.
File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
Attachment_23_-_ACV_1.1_RFP_DD254_M67854-15-R-0001__20150429.pdf PDF
Attachment_10.2_-_GFP_Report_ACV_2015_04_21.pdf PDF
CDRL_A010.pdf PDF
Amendment_4.pdf PDF
CDRL_A031.pdf PDF
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
CDRL_A060.pdf PDF
CDRL_A058.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
M67854-15-R-0001-0002.pdf PDF
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
Attachment_11_-_Test_Schedules_and_Test_Locations_150406.docx DOCX document
M67854-15-R-0001-0001.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
Attachment_03_-_Meeting_List_150319.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
1_ACV_1.1_CDRLs_03192015.pdf PDF
Attachment_28_-_COVER.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_27_-_Contractor_Request_to_use_Prohibited_Material.pdf PDF
Attachment_14_-_ACV_IUID_Plan_Signed.pdf PDF
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
Attachment_28_-_ACV_1.1_CWBS_Index_and_Dictionary.xlsx XLSX spreadsheet
Attachment_10.2_-_GFP_Report_ACV_2015_03_20.pdf PDF
Attachment_02_-_COVER_150319.docx DOCX document
Attachment_16.2_-_TABLE_A-II_Oper_and_Combined_Oper_Maint_Rqumts.docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_30_-_Integrated_Data_Environment.docx DOCX document
Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx PPTX presentation
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Attachment_05_-_COVER.docx DOCX document
Attachment_26_-_Technical_Instructions.doc DOC document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Show all 50

Amphibious Combat Vehicle 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OFFICE OF THE SECRETARY OF DEFENSE

1800 DEFENSE PENTAGON

WASHINGTON. D.C. 20301-1800

t, COST ASSESSMENT AND

PROGRAM EVALUATION

MEMORANDUM FOR PM AMPHIBIOUS COMBAT VEHICLE

SUBJECT: Amphibious Combat Vehicle (ACV) Contract Cost and Software Data Reporting (CSDR) Plan, N-14-G-C 1

We have reviewed the Amphibious Combat Vehicle (ACV) Program Phase 1 Increment 1 Contract CSDR Plan in accordance with the CSDR Manual DoDM 5000.04-M-l. This plan is consistent with the guidance provided in the Work Breakdown Structure (WBS), MIL-STD-881C, and the program plan N-14-G. This plan also satisfies current Cost Assessment (CA) and Navy data requirements during the Engineering and Manufacturing Development phase for CSDR report content and frequency. Please note the following instructions for this CSDRPlan:

• The current CSDR Manual, DoDM 5000.04-M-I, dated November 4, 2011 governs the application of CSDR requirements on all ACA T I Programs. The Data Item Descriptions (DIDs) for CCDRs, CWBS Dictionaries, and SRDRs that must be used on new contracts are dated May 2011. The dollar thresholds governing the application of CSDRs to individual contracts and subcontracts are established in Interim DoDI 5000.02, Operation of the Defense Acquisition System, dated November 26,2013.

• Submit a copy of the pertinent Contract Data Requirement Lists (CDRLs) to the Defense Cost and Resource Center (DCARC) within 30 days after the contract modification containing such requirements is awarded. This document must provide evidence that the CSDR requirements, as specified in the attached Contract CSDR Plan, were placed on contract.

• Contractors and subcontractors are required to submit the contract WBS (CWBS) Index and Dictionary to the DCARC when the first report is due, or as specified in the CSDR plan. The CWBS Dictionary must be maintained and updated throughout the life of the contract and resubmitted to the DCARC with CSDR submissions as changes occur.

• A CA-approved Contract CSDR Plan must be included in all RFPs for contracts subject to CSDR reporting requirements per DFARS Section 234.7101. All contractors' and subcontractors' Contract CSDR Plans are to be submitted to DCARC for approval at least 60 days before issuing the solicitation to industry. Any changes to Contract CSDR Plans must be submitted to the DCARC for CA approval as individual contracts change. Contract CSDR Plans and subsequent changes must be approved prior to contract award, modification, or exercise of a contract option.

Contract CSDR Plans will also be updated to reflect current policies regarding CSDR requirements before a new contract or major modification is made.

• Any RFP and ensuing contract for CSDRs must include the following requirement:

CSDRs must be submitted electronically to DCARC as stand-alone Excel-compatible files and as DCARC approved Extensible Markup Language (XML) files by report upload to the DCARC's CSDR Submit-Review system. PDEformat is not acceptable. The DCARC web site (http://dcarc.cape.osd.mil) contains information about delivery methods and submission instructions.

• The Contract CSDR Plan uses the event field as the driver for the submission of reports, not the "as of date." The "as of date" is based on current knowledge (when the CSDR Plan is developed) and is used for tracking purposes. If the event slips, it is the responsibility of the program office (PO) and/or Contractor to inform the DCARC via the CSDR Submit-Review of the event slippage and allow DCARC to update the tracking system with the new event date. The DCARC will determine if a revised Contract CSDR Plan is required. If the PO and/or Contractor do not inform DCARC, the submission will be treated as being late. Event slippages generally do not require that a revised Contract CSDR Plan be submitted. However, a Contract CSDR Plan revision is required to add new events.

• As referenced in CSDR Manual DoDM 5000.04-M-l, DD Form 1921-3, "Contract Business Data Report" is required on all contracts issued after April 2, 2009 that contain CCDR requirements. This form must be submitted to DCARC in accordance with DI-FNCL-81765B.

Any future correspondence relating to the subject Contract CSDR Plan should reference the assigned Plan number, N-14-G-Cl. Questions may be directed to Mr. Michael Augustus,

(571) 372-4267.

Cost Assessment

Attachments:

Contract CSDR Plan: N-14-G-Cl cc: CA (Mark Mutschler) NCCA (Kristin Cowell, Carlton Lavinder, Daniel Schluckebier) PM AAA (Damien Woodley, James Myers)

Richard P. Burke Deputy Director http:http://dcarc.cape.osd.mil

COST AND SOFTWARE DATA REPORTING PLAN

The pub/ic reporting burden for lhis collection of information is estimated to average 8 hours per response, including lhe time for reviewing instructions, Icollection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, sources, _ to Department and Illiilntcllmny...

I OMBNo.

data needed, and completing and reviewing the Directorate (0704-O188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection if it does currenlly valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION,

1. MAJOR PROGRAM a. NAME Amphibious Combat Vehicle (ACV)

b. PHASE/MILESTONE nPre-A !XlB nC-FRP

HA nC-LRIP nO&S

c. PRIME MISSION PRODUCT

Amphibious Combat Vehicle (ACV) System, Increment 1 .1

2. was SYSTEM TYPE

Surface Vehicle System

3. SUBMISSION TYPE 14. CURRENT SUBMISSION DATE

IxlINITIAL

[lCHANGE

(YVYYMMDD)

20141014

5, LAST APPROVED PLAN DATE

(YYVYMMDD)

6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) 6b. TELEPHONE NUMBER (Include Area Code) 6c. FAX NUMBER (Include Area Code) 6d. E·MAIL ADDRESS

James Myers 105 Tech Parkway, Suite 101 Stafford, VA, 22556-8618

8. PREPARING

(703) 784-1454

9a. CONTRACTOR NAMEIADDRESS7. PLAN TYPE bPROGRAM ~

• ORGANIZATION

X CONTRACT (PRIME)

CONTRACT (SUB)

i. PERFORMING ORGANIZATION ii. DIVISION

11. WBS ELEMENT CODE

a. PROGRAM!

CONTRACT!

b. CONTRACT!

SUBCONTRACT

SUBCONTRACT

1.0 1.0

1.1 1.1

1.1.1 1.1.1

1.1.1 1.1.1.1

1.1.1 1.1.1.2

1.1.1 1.1.1.3

1.1.1 1.1.1.4

1.1.1 1.1.1.5

1.1.1 1.1.1.6

1.1.1 1.1.1.7

1.1.1 1.1.1.8

1.1.2 1.1.2

1.1.2 1.1.2.1

1.1.2 1.1.2.2

1.1.2 1.1.2.3

1.1.2 1.1.2.4

1.1.2 1.1.2.5

1.1.2 1.1.2.6

1.1.2 1.1.2.7

1.1.2 1.1.2.8

1.1.3 1.1.3

1.1.3 1.1.3.1

1.1.3 1.1.3.2

1.1.3 1.1.3.3

1.1.3 1.1.3.4

1.1.3 1.1.3.5

1.1.3 1.1.3.6

1.1.3 1.1.3.7

PRIME

CONTRACTOR 1

TBD

12, WBS REPORTING ELEMENTS

Amphibious Combat Vehicle (ACVI System, Increment 1.1

Primary Vehicle - Personnel Variant

Vehicle Integration, Assembly, Test and Checkout

Material Inspection and Handling

Vehicle Assembly

Vehicle Disassembly

Production Special Equipment

Functional Integration

Final Inspection

Break-In Testing/Shake·Down Testing

Acceptance Testing

Hull/Frame/Body/Cab

Hull Integration, Assembly, Test & Checkout

Hull Systems Engineering/Program Management

Hull Weldment

Hull Hatches & Panels

Integral Hull Armor

Hull Accommodations

Stock List Type 3 (SL-3)

Other Hull Parts

System Survivability

TBD

System Survivability Integration. Assembly. Test & Checkout

System Survivabilfty Systems Engineering/Program Management

Non-Integral Hull Armor

Non-Integral Weapon Station Armor

Other Extemal Armor

Automatic Fire Extinguishing System

Ballistic Crew and Troop Seats

9b. CONTRACT NUMBER

TBD

13. REPORTS REQUIRED

(X if applicable I a.CWBS

DICTIONARY

X

X

X

X

X X

X

X X

X

X

X X

X

X

X X

X

X

X

X

X

X

X

X

X

X X

b. DO 1921

(CDSRI

X

X

X

X

X

X X

X X X X X X

X

X

X

X X

X

X

X

X

X X X

X

X

X

9:' A:::::RIATION

PROCUREMENT

O&M james.a.myers2@usmc.mil

10. APPROVED PLAN NUMBE

N-14-G-Cl

DO 1921·3 (CBDR): [2]

c. DO 1921·1

(FCHR)

X

X X X X

X

X X

X X

X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

d. DO 1921·2

(PCR)

X

X

X

X

X

e. DO 1921-4

(CSR)

f.SRDR

FORMATS

DO FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 1 of 13

11. WBS ELEMENT CODE

12.

WBS REPORTING ELEMENTS

13. REPORTS REQUIRED

(X if applicable)

DO 1921·3 (CBDR): 0

a. PROGRAM/

CONTRACT/

SUBCONTRACT

b. CONTRACT/

SUBCONTRACT

a. CWBS

DICTIONARY

b. DO 1921

(CDSR)

c. DO 1921·1

(FCHR)

d. DO 1921·2

(PCR)

e. DO 1921-4

(CSR)

f.SRDR

FORMATS

1.1.3 1.1.3.8 Electronic Countermeasures X X X

1.1.3 1.1.3.9 Obscurant System X X X

1.1.3 1.1.3.10 Indentified Freind or Foe System X X X

1.1.3 1.1.3.11 Other System Survivability X X X

1.1.4 1.1.4 Turret Assembly· Remote Weapon Station (RWS) Assembly X X X X

1.1.4 1.1.4.1 RWS Integration, Assembly, Test & Checkout X X X

1.1.4 1.1.4.2 RWS Systems Engineering/Program Management X X X

1.1.4 1.1.4.3 RWS Control Systems X X X

1.1.4 1.1.4.4 Weapon Station Mechanical Interface X X X

1.1.4 1.1.4.5 Integral Weapon Station Armor X X X

1.1.4 1.1.4.6 Other RWS Parts and Systems X X X

1.1.5 1.1.5 Suspension/Steering X X X X

1.1.5.1 1.1.5.1 Land Suspension System X X X X

1.1.5.1 1.1.5.1.1 Land Suspension System Integration, Assembly, Test & Checkout X X X

1.1.5.1 1.1.5.1.2 Land Suspension Systems Engineering/Program Management X X X

1.1.5.1 1.1.5.1.3 Suspension System X X X

1.1.5.1 1.1.5.1.4 Land Steering System X X X

1.1.5.1 1.1.5.1.5 Brake System X X X

1.1.5.1 1.1.5.1.6 Tire Inflation System X X X

1.1.5.1 1.1.5.1.7 Wheels and TIres X X X

1.1.5.1 1.1.5.1.8 Other Land Suspension Parts and Systems X X X

1.1.5.2 1.1.5.2 Hydrodynamic Appendages and Steering X X X X

1.1.5.2 1.1.5.2.1 Hydrodynamic Appendages and Steering Integration, Assembly, Test & Checkout X X X

1.1.5.2 1.1.5.2.2 Hydrodynamic Appendages and Steering Systems Engineering/Program Manageme X X X

1.1.5.2 1.1.5.2.3 Bow System X X X

1.1.5.2 1.1.5.2.4 Marine Steering System X X X

1.1.5.2 1.1.5.2.5 Other Hydrodynamic Appendages and Steering Parts and Systems X X X

1.1.6 1.1.6 Vehicle Electronics X X X X

1.1.6 1.1.6.1 Vehicle Electronics Integration, Assembly, Test & Checkout X X X

1.1.6 1.1.6.2 Vehicle Electronics Systems Engineering/Program Management X X X

1.1.6 1.1.6.3 Electronic Vehicle Control Systems X X X

1.1.6 1.1.6.4 Vehicle Control Networks and Data Buses X X X

1.1.6 1.1.6.5 Integrated GFE Network and Data Buses X X X

1.1.6 1.1.6.6 Electrical Power Management X X X

1.1.6 1.1.6.7 Harnesses and Cabling X X X

1.1.6 1.1.6.8 Integrated GFE Hamess and Cabling X X X

1.1.6 1.1.6.9 Sensors, Switches, and Other Hardware X X X

1.1.7 1.1.7 Power Package/Drive Train X X X X

1.1.7.1 1.1.7.1 Engine System X X X X

1.1.7.1 1.1.7.1.1 Engine Integration, Assembly, Test & Checkout X X X

1.1.7.1 1.1.7.1.2 Engine Systems Engineering/Program Management X X X

1.1.7.1 1.1.7.1.3 Primary Engine System X X X

1.1.7.1 1.1.7.1.4 Engine Cooling System X X X

1.1.7.1 1.1.7.1.5 Engine Air Induction System X X X

1.1.7.1 1.1.7.1.6 Engine Exhaust System X X X

1.1.7.1 1.1.7.1.7 Vehicle Fuel System X X X

1.1.7.1 1.1.7.1.8 Auxiliary Power Unit X X X

1.1.7.1 1.1.7.1.9 Other Engine Parts and Systems X X X

1.1.7.2 1.1.7.2 Automotive Drive Train System X X X X

1.1.7.2 1.1.7.2.1 Automotive Drive Train Integration, Assembly, Test & Checkout X X X

DO FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 2 of 13

13. REPORTS REQUIRED

11. WBS ELEMENT CODE DO 1921-3 (CBDR): [2]

(X if applicable) 12.

WBS REPORTING ELEMENTS a.PROGRAMI e. DO 1921-4 f.SRDRd. DO 1921·2 b. CONTRACTI a.Cwes b. DO 1921 c. DO 1921·1

CONTRACT/ FORMATS(CSR)DICTIONARY (FCHR) (PCR)SUBCONTRACT (CDSR)

SUBCONTRACT

1.L7.2 X1.1.7.2.2 AutomotiYe DriYe Train Systems Engineering/Program Management X X Driye Shaft System X1.1.7.2 1.1.7.2.3 X X Driye~s AutomotiYe Controls System X X X1.1.7.2 1.1.7.2.4

X1.1.7.2 1.1.7.2.5 Transmission System X X I.U.2 Wheel Olive System X1.1.7.2.6 X X

1.1,7,2,7 Power Transfer ModulelPower Take Off System X1.1.7.2 XX 1,1,7.2 1,1,7,2,6 XOther Automotive Drive Train Parts and Systems X X 1,1.7,3 1.1.7,3 X XWater PropulSion System X X 1,1.7,3 1,1,7,3,1 XWater Propulsion System Integration. Assembly. Test & Checkout XX 1,1,7,3 1,1,7,3,2 Water Propulsion Systems Engineering/Program Management XX X

1,1.7.3 1.1.7,3,3 XWater Propulsion Power System X X 1,1,7,3 1,1,7.3,4 XWater Propulsors Assembly XX 1,1.7.3 1,1,7,3,5 Other Water PropulSion Parts & Systems X X X

1.1,8 1.1,8 Auxiliary Automotive X XX X

1.1,8 1,1,8,1 Auxiliary Automotive Integration. Assembly. Test & Checkout X XX

1.1,8 1,1.8,2 Auxiliary Automotive Systems Engineering/Program Management XX X 1,1,8,3 Hydraulic System X1.1.8 X X

Bilge System X1.1.8 1.1.8.4 XX 1,1,8,5 Environmental Control System X1.1,8 XX

1.1,8 1,1.8,6 Lighting Systems X XX

1.1,8 1,1,8,7 Other Auxiliary Automotive Parts and Systems XX X 1,1,9 1.1.9 Fire Control X XX X

1,1,9,11,1,9 Fire Control System Integration. Assembly, Test & Checkout XX X 1,1,9 1,1,9,2 Fire Control Systems Engineering/Program Management XX X 1,1,9 1,1.9,3 Fire Control Integration Software XX X 1,1,9 1,1.9.4 Other Fire Control Parts and Systems XX X 1,1.10 1,1.10 Armament X XX X

1,1,10,11,1.10 Armament Integration, Assembly. Test & Checkout X XX 1,1.10 1,1.10.2 Armament Systems Engineering/Program Management X XX

1,1,10 1,1.10.3 Primary Weapon XX X

1.1,10 M2 HBMG (.50 cal) 1.1.1 0.3.1 XX X 1.1,10 1,1,10,3.2 MK19 40mm AGL XX X

1.1,10.4 Other Armament Parts and Systems 1,1,10 XX X 1,1.11 1.1.11 Automatic Ammunition Handling X N/A

1.1.12 Navigation and Remote Piloting 1.1,12 XX X X

1.1.12.11,1,12 Navigation and Remote Piloting System Integration, Assembly, Test & Checkout XX X 1,1,12.2 NaYigation and Remote Piliting Systems Engineering/Program Management X1.1.12 X X 1,1.12,31,1,12 Vision Systems XX X

1.1,12 1.1.12.4 Navigation Systems XX X 1,1,12,51,1,12 Other Navigation Systems XX X

1,1.13 1.1.13 Special Equipment X XX X 1,1,13,11,1,13 SpeCial Equipment Integration, Assembly, Test & Checkout XX X

1,1,13 1.1,13.2 SpeCial Equipment Systems Engineering/Program Management X XX 1,1,13,31,1,13 Nuclear, Biological, & Chemica! (NBC) Detection & Waming System X X X

1,1.13 1.1.13,4 Chemical Detection System X X X

1,1,13,51,1,13 Other Special Equipment Systems X X X

1.1.14 Communications1.1.14 X X X X

1,1,14.11,1,14 Communications System Integration. Assembly. Test & Checkout X X X

1,1.14 1.1.14.2 Communications Systems Engineering/Program Management X X X

1,1,14 1.1,14,3 Radio System X X X

DO FORM 2794, MAY 2011 PREViOUS EDITION IS OBSOLETE Page 3 of 13

WBS REPORTING ELEMENTS

13. REPORTS REQUIRED

(X if applicable)

DO 1921-3 (CBDR): 0

a. PROGRAMI

CONTRACTI

SUBCONTRACT

b. CONTRACTI

SUBCONTRACT

a. CWBS

DICTIONARY

b. DO 1921

(CDSR)

c. DO 1921-1

(FCHR)

d. DO 1921-2

(PCR)

e. DO 1921-4

(CSR)

f. SRDR

FORMATS

1.1.14 1.1.14.4 Antennas X X X

1.1.14 1.1.14.5 Vehicle Intercom System X X X

1.1.14 1.1.14.6 Processors, Displays, and Applications X X X

1.1.14 1.1.14.7 Racks X X X

1.1.14 1.1.14.8 Other Communications Systems X X X

1.1.15 1.1.15 Vehicle Software Release l,..n X X X X

1.1.15.1 1.1.15.1 Vehicle Application Software X X X X

1.1.15.1 1.1.15.1.1 Vehicle Application Software Integration, Assembly, Test & Checkout X X X

1.1.15.1 1.1.15.1.2 Vehicle Application Software Systems Engineering/Program Management X X X

1.1.15.1 1.1.15.1.3 Mobility, Power, and Auxiliary (MPA) Software X X X

1.1.15.1 1.1.15.1.4 Command and Control Software X X X

1.1.15.1 1.1.15.1.5 Controls and Displays (C&D) Software X X X

1.1.15.1 1.1.15.1.6 Software Loader Verifier (SLV) X X X

1.1.15.2 1.1.15.2 Vehicle System Software X X X X

1.1.15.2 1.1.15.2.1 Vehicle System Software Integration, Assembly, Test & Checkout X X X

1.1.15.2 1.1.15.2.2 Vehicle System Software Systems Engineering/Program Management X X X

1.1.15.2 1.1.15.2.3 System Software (Operating Systems) X X X

1.1.15.2 1.1.15.2.4 Software Development Environment X X X

1.1.15.2 1.1.15.2.5 Software Test Environment X X X

1.1.16 1.1.16 Other Vehicle Subsystems l,..n (Specify) X X X X

1.2 1.2 Remote Control System (UGV specific) X N/A

1.2.1 1.2.1 Remote Control System Integration, Assembly, Test and Checkout X N/A

1.2.2 1.2.2 Ground Control Systems X N/A

1.2.3 1.2.3 Command and Control Subsystem X N/A

1.2.4 1.2.4 Remote Control System Software Release 1 ... n X N/A

1.2.5 1.2.5 Other Remote Control System 1...n (Specify) X N/A

1.3 1.3 Secondary Vehicle - Command Variant X N/A

1.3.1 1.3.1 Vehicle Integration, Assembly, Test and Checkout X N/A

1.3.1 1.3.1.1 Material Inspection and Handling X N/A

1.3.1 1.3.1.2 Vehicle Assembly X N/A

1.3.1 1.3.1.3 Vehicle Disassembly X N/A

1.3.1 1.3.1.4 Production Special Equipment X N/A

1.3.1 1.3.1.5 Functional Integration X N/A

1.3.1 1.3.1.6 Final Inspection X N/A

1.3.1 1.3.1.7 Break-in Testing/Shake-Down Testing X N/A

1.3.1 1.3.1.8 Acceptance Testing X N/A

1.3.2 1.3.2 HulliFrame/Body/Cab X N/A

1.3.2 1.3.2.1 Hull Integration, Assembly, Test & Checkout X N/A

1.3.2 1.3.2.2 Hull Systems Engineering/Program Management X N/A

1.3.2 1.3.2.3 Hull Weldment X N/A

1.3.2 1.3.2.4 Hull Hatches & Panels X N/A

1.3.2 1.3.2.5 Integral Hull Armor X N/A

1.3.2 1.3.2.6 Hull Accommodations X N/A

1.3.2 1.3.2.7 Stock List Type 3 (SL·3) X N/A

1.3.2 1.3.2.8 Other Hull Parts X N/A

1.3.3 1.3.3 System Survivability X N/A

1.3.3 1.3.3.1 System Survivability Integration, Assembly, Test & Checkout X N/A

1.3.3 1.3.3.2 System Survivability Systems Engineering/Program Management X N/A

1.3.3 1.3.3.3 Non·lntegral Hull Armor X N/A

1.3.3 1.3.3.4 Non-Integral Weapon Station Armor X N/A

DO FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 4 of 13 was REPORTING ELEMENTS

13. REPORTS REQUIRED

(X if applicable)

00 1921·3 (CBOR): 0

a. PROGRAMI

CONTRACTI

SUBCONTRACT

b. CONTRACTI

SUBCONTRACT

a.CWBS

DICTIONARY

b. 00 1921

(COSR)

c. 00 1921·1

(FCHR)

d. 00 1921·2

(PCR)

e. 00 1921-4

(CSR)

f. SROR

FORMATS

1.3.3 1.3.3.5 Other External Armor X N/A

1.3.3 1.3.3.6 Automatic Fire Extinguishing System X N/A

1.3.3 1.3.3.7 Ballistic Crew and Troop Seats X N/A

1.3.3 1.3.3.8 Electronic Countermeasures X NIA

1.3.3 1.3.3.9 Obscurant System X NIA

1.3,3 1.3.3,10 Indentified Freind or Foe System X NIA

1.3.3 1,3.3,11 Other System Survivability X N/A

1.3.4 1.3.4 Turret Assembly' Remote Weapon Station (RWS) Assembly X N/A

1.3.4 1.3.4.1 RWS Integration, Assembly, Test &Checkout X NIA

1.3.4 1.3.4.2 RWS Systems EngineelingiProgram Management X NIA

1.3.4 1,3.4.3 RWS Control Systems X NIA

1.3,4 1.3.4.4 Weapon Station Mechanical Interface X NIA

1.3.4 1.3,4.5 Integral Weapon Station Armor X NIA

1,3.4 1.3.4.6 Other RWS Parts and Systems X N/A

1.3,5 1.3.5 Suspension/Steering X NIA

1.3.5.1 1,3.5.1 Land Suspension System X NiA

1.3.5,1 1.3.5.1.1 Land Suspension System Integration, Assembly, Test & Checkout X NIA

1.3.5.1 1.3.5.1.2 Land Suspension Systems EngineeringlProgram Management X NIA

1.3.5.1 1.3.5.1.3 Suspension System X NIA

1,3.5.1 1.3,5.1.4 Land Steering System X N/A

1.3.5.1 1.3.S.1.5 Brake System X NIA

1.3.5.1 1.3.5.1.6 Tire Inflation System X N/A

1.3.5.1 1.3.5.17 Wheels and Tires X NiA

1.3.51 1.3.5.1.8 Other Land Suspension Parts and Systems X NIA

1.3.5,2 1.3.5.2 Hydrodynamic Appendages and Steering X NIA

1.3.5.2 1.3,S.2.1 Hydrodynamic Appendages and Steering Integration, Assembly, Test & Checkout X NIA

1,3.S.2 1.3.S.2.2 Hydrodynamic Appendages and Steering Systems Engineering/Program Managem€ X N/A

1,3,5.2 1.3.S.2.3 Bow System X N/A

1.3.5.2 1.3.5.2.4 Marine Steering System X NIA

1.3.5.2 1,3.5.2,5 Other Hydrodynamic Appendages and Steering Parts and Systems X NIA

1.3.6 1,3.6 Vehicle Electronics X NiA

1.3.6 1.3,6.1 Vehicle Electronics Integration, Assembly, Test & Checkout X NIA

1.3.6 1.3.6.2 Vehicle Electronics Systems EngineeringIProgram Management X N/A

1.3.6 1.3.6.3 Electronic Vehicle Control Systems X N/A

13.6 1.3.6.4 Vehicle Control Networks and Data Buses X N/A

1.3.6 1.3.6.5 Integrated GFE Network and Data Buses X N/A

1.3.6 1,3.6,6 Electrical Power Management X N/A

1.3.6 1.3.6.7 Harnesses and Cabling X N/A

1.3.6 1,3.6.8 Integrated GFE Hamess and Cabling X N/A

1.3.6 1.3.6.9 Sensors, Switches, and Other Hardware X N/A

1.3.7 1.3.7 Power Package/Drive Train X N/A 1.3I 1 1.3.7.1 Engine System X N/A

1.3.7.1 1.3.7.1.1 Engine Integration, Assembly, Test & Checkout X N/A

1.3.7,1 1.3.7.1.2 Engine Systems EngineeringlProgram Management X N/A

1.3.7.1 1.3.7.1.3 Primary Engine System X N/A

1,3.7.1 1.37.1.4 Engine Cooling System X N/A

1,3.7.1 1.3.7.1.5 Engine Air Induction System X N/A

1.3.7.1 1.3.7.16 Engine Exhaust System X N/A

1.3.7.1 1.3.7.1.7 Vehicle Fuel System X N/A

1.3.7.1 1.3.7.1.8 AUXiliary Power Unit X N/A

00 FORM 2794, MAY 2011 PREVIOUS EDmON IS OBSOLETE Page 5 of 13

13. REPORTS REQUIRED

(X if applicable)

DD 1921·3 (CBDR): [2]

a. PROGRAMI b. CONTRACTI

CONTRACTI

SUBCONTRACT

SUBCONTRACT

WBS REPORTING ELEMENTS

a.CWBS b. DD 1921

DICTIONARY (CDSR)

c. DD 1921-1

(FCHR)

d. DD 1921-2 e. DD 1921-4

(PCR) (CSR)

f. SRDR

FORMATS

1.3.7.1 1.3.7.1.9 Other Engine Parts and Systems X NIA

1.3.7.2 1.3.7.2 Automotive Drive Train System X N/A

1.3.7.2 1.3.7.2.1 Automo~ve Drive Train Integration, Assembly, Test /I Checkout X N/A

1.3.7.2 1.3.7.2.2 Automotive Drive Train Systems Engineering/Program Management X N/A

1.3.7.2 1,3.7.2.3 Drive Shaft System X N/A

1.3.7.2 1.3.7.2.4 Driver's Automotive Controls System X NIA

1.3.7.2 1.3.7.2.5 Transmission System X NIA

1.3,7.2 1.3.7.2.6 Wheel Drive System X NIA

1.3.7.2 1.3.7.2.7 Power Transfer Module X N/A

1.3.7.2 1.3,7.2,8 Other Automo~ve Drive Train Parts and Systems X NIA

1.3,7.3 1.3.7.3 Water Propulsion System X NIA

1.3,7.3 1,3.7,3.1 Water Propulsion System Integration, Assembly, Test /I Checkout X NlA

1.3.7.3 1.3,7.3,2 Water Propulsion Systems Engineering/Program Management X N/A

1.3.7.3 1.3.7,3.3 Water Propulsion Power System X NIA

1.3.7.3 1.3.7.3,4 Water Propulsors Assembly X NIA

1.3.7.3 1.3.7.3.5 Other Water Propulsion Parts /I Systems X NIA

1.3.8 1.3.8 Auxiliary Automotive X N/A

1.3.8 1.3,8,1 Auxiliary Automotive Integration, Assembly, Test /I Checkout X NIA

1.3.8 1.3,8.2 Auxiliary Automotive Systems Engineering/Program Management X NIA

1.3.8 1.3.8,3 Hydraulic System X NIA

1.3.8 1.3.8,4 Bilge System X N/A

1,3.8 1.3,8,5 Environmental Control System X NIA

1.M 1,3.8.6 Other Auxiliary Automotive Parts and Systems X NlA

1.3.9 1.3,9 Fire Control X NIA

1.3.9 1.3.9.1 Fire Control System Integration, Assembly, Test /I Checkout X NIA

1.3.9 1.3,9,2 Fire Control Systems EngineeringIProgram Management X NIA

1.3.9 1.3.9,3 Fire Control Integration Software X NIA

1,3,9 1,3,9,4 Other Fire Control Parts and Systems X NIA

1.3.10 1.3,10 Armament X NIA

1,3.10 1.3,10.1 Armament Integration, Assembly, Test & Checkout X NIA

1.3.10 1.3.10.2 Armament Systems Engineering/Program Management X NIA

1,3,10 1,3,10,3 Primary Weapon X N/A

1.3.10 1.3.10,3,1 M2 HBMG (.50 cal) X NIA

1,3.10 1,3,10,3.2 MK1940mmAGL X NIA

1,3.10 1,3.10.4 Other Armament Parts and Systems X NIA

1,3.11 1,3,11 Automatic Ammunition Handling X NIA

1.3,12 1.3,12 Navigation and Remote Piloting X NIA

1.3.12 1,3.12.1 Navigation and Remote Piloting System Integration, Assembly, Test & Checkout X N/A

1.3.12 1.3.12.2 Navigation and Remote Piliting Systems Engineering/Program Management X N/A

1,3,12 1,3,12.3 Vision Systems X N/A

1.3.12 1,3.12,4 Navigation Systems X NIA

1,3.12 1,3,12.5 Other Navigation Systems X NIA

1,3.13 1.3.13 Special Equipment X NIA

1.3.13 1.3.13,1 Special Equipment Integration, Assembly, Test & Checkout X N/A

1.3,13 1,3.13,2 Special Equipment Systems Engineering/Program Management X N/A

1.3.13 1.3,13,3 Nuclear, Biological, & Chemical (NBC) Detection /I Warning System X NIA

1,3.13 1.3,13,4 Chemical Detection System X NIA

1.3,13 1.3,13.5 Other Special Equipment Systems X NIA

1.3.14 1.3.14 Communications X NIA

1,3.14 1.3.14,1 Communications System Integration, Assembly, Test & Checkout X NIA

DD FORM 2794. MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 60f13

WBS REPORTING ELEMENTS

13. REPORTS REQUIRED

(X if applicable)

001921-3 (CBOR): 12]

a.PROGRAMI

CONTRACTI

SUBCONTRACT

b. CONTRACTI

SUBCONTRACT

a.CWBS

DICTIONARY

b. 00 1921

(COSR)

c. 00 1921-1

(FCHR)

d. 00 1921-2

(PCR)

e. 00 1921-4

(CSR)

f.SROR

FORMATS

1.3.14 1.3.14.2 Communications Systems EngineeringIProgram Management X NIA

1.3.14 1.3.14.3 Radio System X N/A

1.3.14 1.3.14.4 Antennas X N/A

1.3.14 1.3.14.5 Vehicle Intercom System X NIA

1.3.14 1.3.14.6 Processors, Displays, and Applications X N/A

1.3.14 1.3.14.7 Racks X N/A

1.3.14 1.3.14.8 Other Communications Systems X N/A

1.3.15 1.3.15 Vehicle Software Release L.n X N/A

1.3.15.1 1.3.15.1 Vehicle Application Software X N/A

1,3.15.1 1,3,15,1.1 Vehicle Application Software Integration, Assembly, Test iii Checkout X NIA

1,3.15.1 1.3.15.1,2 Vehicle Application Software Systems Engineering/Program Management X NIA

1,3.15,1 1.3.15.1.3 Mobility, Power, and Auxiliary (MPA) Software X N/A

1,3.15.1 1.3,15.1.4 Command and Control Software X N/A

1,3,15,1 1,3,15.1.5 Controls and Displays (ClliD) Software X N/A

1.3.15.1 1,3,15,1,6 Software Loader Verifier (SLV) X N/A

1,3.15,2 1,3,15.2 Vehicle System Software X N/A

1.3,15.2 1,3,15,2,1 Vehicle System Software Integration, Assembly, Test iii Checkout X N/A

1.3.15.2 1,3.15.2,2 Vehicle System Software Systems Engineering/Program Management X N/A

1,3,15.2 1.3,15,2,3 System Software (Operating Systems) X N/A

1.3.15.2 1,3.15.2.4 Software Development Environment X N/A

1,3,15,2 13,15,2,5 Software Test Environment X N/A

1.3.16 1.3.16 other Vehicle Subsystems 1 , ..n (Specify) X N/A

1.4 1.4 Tertiary Vehicle - Recovery Variant X N/A

1.4.1 1.4,1 Vehicle Integration, Assembly, Test and Checkout X N/A

1,4.1 1.4.1.1 Material Inspedion and Handling X N/A

1.4,1 1.4.1.2 Vehicle Assembly X N/A

1.4.1 1.4.1.3 Vehicle Disassembly X N/A

1.4.1 1.4,1.4 Production Special Equipment X N/A

1.4.1 1,4,1.5 Functional Integration X N/A

1.4.1 1,4.1,6 Final Inspection X N/A

1.4.1 1.4.1.7 Break-In Testing/Shake-Down Testing X N/A 1.4,1 1.4.1.8 Acceptance T esling X N/A

1.4.2 1.4.2 Hull/Frame/BodylCab X NIA

1.4.2 1.4.2.1 Hull Integration, Assembly, Test iii Checkout X NIA

1.4.2 1.4.2,2 Hull Systems EngineeringIProgram Management X N/A

1.4.2 1.4.2,3 Hull Weldmant X N/A

1.4,2 1,4,2.4 Hull Hatches iii Panels X NIA

1.4.2 1.4.2,5 Integral Hull Armor X NIA

1.4.2 1.4,2,6 Hull Accommodations X NIA

1.4.2 1.4,2,7 Stock List Type 3 (SL-3) X NIA

1,4.2 1.4,2.8 Other Hull Parts X NIA

1.4.3 1.4,3 System Survivability X NIA

1.4.3 1,4,3.1 System Survivability Integration, Assembly, Test iii Checkout X NIA

1.4.3 1.4.3,2 System Survivability Systems EngineeringlProgram Management X NIA

1.4,3 1.4.3.3 Non-Integral Hull Armor X NIA

1.4,3 1.4,3.4 Non-Integral Weapon Station Armor X NIA

1.4,3 1.4.3.5 Other External Armor X NIA

1.4.3 1.4,3.6 Automatic Fire Extinguishing System X NIA

1,4.3 1.4.3.7 Ballistic Crew and Troop Seats X NIA

1.4.3 1,4,3.8, Electronic Countermeasures X NIA

00 FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 7 of 13

13. REPORTS REQUIRED

(X if applicable)

001921·3 (CBOR): 0

a.PROGRAM/

CONTRACTI

SUBCONTRACT

b. CONTRACTI

SUBCONTRACT

WBS REPORTING ELEMENTS

a.CWBS

DICTIONARY

b. 00 1921

(CDSR)

c. DO 1921·1

(FCHR)

d. 00 1921·2

(PCR)

e. DO 1921-4

(CSR)

f.SRDR

FORMATS

1.4.3 1.4.3.9 Obscurant System X N/A

1.4.3 1.4.3.10 Indentified Freind or Foe System X N/A

1.4.3 1.4.3.11 Other System Survivability X N/A

1.4.4 1.4.4 Turret Assembly· Remote Weapon Station (RWS) Assembly X N/A

1.4.4 1.4.4.1 RWS Integration, Assembly, Test & Checkout X N/A

1.4.4 1.4.4.2 RWS Systems EngineeringiProgram Management X N/A

1.4.4 1.4.4.3 RWS Control Systems X N/A

1.4.4 1.4.4.4 Weapon Station Mechanical Interlace X N/A

1.4.4 1.4.4.5 Integral Weapon Station Armor X N/A

1.4.4 1.4.4.6 Other RWS Parts and Systems X N/A

1.4.5 1.4.5 Suspension/Steering X N/A

1.4.5.1 1.4.5.1 Land Suspension System X N/A

1.4.5.1 1.4.5.1.1 Land Suspension System Integration, Assembly, Test & Checkout X N/A

1.4.5.1 1.4.5.1.2 Land Suspension Systems Engineering/Program Management X N/A

1.4.5.1 1.4.5.1.3 Suspension System X N/A

1.4.5.1 1.4.5.1.4 Land Steering System X NlA

1.4.5.1 1.4.5.1.5 Brake System X N/A

1.4.5.1 1.4.5.1.6 Tire Inflation System X N/A

1.4.5.1 1.4.5.1.7 Wheels and Tires X N/A

1.4.5.1 1.4.5.1.8 Other Land Suspension Parts and Systems X N/A

1.4.5.2 1.4.5.2 Hydrodynamic Appendages and Steering X N/A

1.4.5.2 1.4.5.2.1 Hydrodynamic Appendages and Steering Integration, Assembly, Test 8. Checkout X N/A

1.4.5.2 1.4.5.2.2 Hydrodynamic Appendages and Steering Systems Engineering/Program Manageme X N/A

1.4.5.2 1.4.5.2.3 Bow System X NlA

1.4.5.2 1.4.5.2.4 Marine Steering System X NlA

1.4.5.2 1.4.5.2.5 Other Hydrodynamic Appendages and Steering Parts and Systems X NlA

1.4.6 1.4.6 Vehicle Electronics X NlA

1.4.6 1.4.6.1 Vehicle Electronics Integration, Assembly, Test & Checkout X N/A

1.4.6 1.4.6.2 Vehicle Electronics Systems Engineering/Program Management X N/A

1.4.6 1.4.6.3 Electronic Vehicle Control Systems X N/A

1.4.6 1.4.6.4 Vehicle Control Networ1<s and Data Buses X N/A

1.4.6 1.4.6.5 Integrated GFE Network and Data Buses X N/A

1.4.6 1.4.6.6 Electrical Power Management X N/A

1.4.6 1.4.6.7 Harnesses and Cabling X N/A

1.4.6 1.4.6.8 Integrated GFE Harness and Cabling X N/A

1.4.6 1.4.6.9 Sensors. Switches, and Other Hardware X NIA

1.4.7 1.4.7 Power Package/Drive Train X N/A

1.4.7.1 1.4.7.1 Engine System X N/A

1.4.7.1 1.4.7.1.1 Engine Integration, Assembly. Test 8. Checkout X NIA

1.4.7.1 1.4.7.1.2 Engine Systems EngineeringiProgram Management X N/A

1.4.7.1 1.4.7.1.3 Primary Engine System X N/A

1.4.7.1 1.4.7.1.4 Engine Cooling System X N/A

1.4.7.1 1.4.7.1.5 Engine Air Induction System X NIA

1.47.1 1.4.7.1.6 Engine Exhaust System X N/A

1.4.7.1 1.4.7.1.7 Vehicle Fuel System X N/A

1.4.7.1 1.4.7.1.8 Auxiliary Power Unit X N/A

1.4.7.1 1.4.7.1.9 Other Engine Parts and Systems X N/A

1.4.7.2 1.4.7.2 Automotive Drive Train System X NIA

1.4.7.2 1.4.7.2.1 Automotive Drive Train Integration, Assembly, Test & Checkout X N/A

1.4.7.2 1.4.7.2.2 Automotive Drive Train Systems Engineering/Program Management X NIA

00 FORM 2794, MAY 2011 PREV10US EDITION IS OBSOLETE PageS of13

11. was ELEMENT CODE

13. REPORTS REQUIRED

(X if applicable)

001921-3 (CBORI: 0

a.PROGRAM/

CONTRACTI

SUBCONTRACT

b. CONTRACTI

SUBCONTRACT

WBS REPORTING ELEMENTS

a.CWBS

DICTIONARY

b. 00 1921

(COSR)

c. 00 1921·1

(FCHR)

d. 00 1921·2

(PCR)

a. 001921-4

(CSR)

f.SRDR

FORMATS

1.4.7.2 1.4.7.2.3 Drive Shaft System X NlA

1.4.7.2 1.4.7.2.4 Drive(s Automotive Controls System X NlA

1.472 1.4.7.2.5 Transmission System X NIA

1.4.7.2 1.4.7.2.6 Wheel Olive System X NIA

1.4.7.2 1.4.7.2.7 Power Transfer Module X NIA

1.472 1.4.7.2.8 Other Automotive Drive Train Parts and Systems X N/A

1.4.7.3 1.4.7.3 Water Propulsion System X N/A

1.4.7.3 1.4.7.3.1 Water Propulsion System Integration. Assembly. Test & Checkout X N/A

1.4.7.3 1.4.7.3.2 Water Propulsion Systems Engineering/Program Management X N/A

1.4.7.3 1.4.7.3.3 Water Propulsion Power System X N/A

1.4.7.3 1.4.7.3.4 Water Propulsors Assembly X N/A

1.4.7.3 1.4.7.3.5 Other Water PropulSion Parts & Systems X NIA

1.4.8 1.4.8 Auxiliary Automotive X NlA

1.4.8 1.4.8.1 Auxiliary Automotive Integration. Assembly, Test & Checkout X NlA

1.4.8 1.4.8.2 Auxiliary Automotive Systems EngineeringiProgram Management X NIA

1.4.8 1.4.8.3 Hydraulic System X NIA

1.4.8 1.4.8.4 Bilge System X NIA

1.4.8 1.4.8.5 Environmental Control System X N/A

1.4.8 1.4.8.6 Other Auxiliary Automotive Parts and Systems X NIA

1.4.9 1.4.9 Fire Control X NIA

1.4.9 1.4.9.1 Fire Control System Integration, Assembly. Test & Checkout X NIA

1.4.9 1.4.9.2 Fire Control Systems Engineering/Program Management X N/A

1.4.9 1.4.9.3 Fire Controllntegralion Software X NIA

1.4.9 1.4.9.4 Other Fire Control Parts and Systems X NIA

1.4.10 1.4.10 Armament X NlA

1.4.10 1.4.10.1 Armament Integration. Assembly. Test & Checkout X NlA

1.4.10 1.4.10.2 Armament Systems Engineering/Program Management X N/A

1.4.10 1.4.10.3 Primary Weapon X N/A

1.4.10 1.4.10.3.1 M2 HBMG (.50 cal) X N/A

1.4.10 1.4.10.3.2 MK19 40mm AGL X N/A

1.4.10 1.4.10.4 Other Armament Parts and Systems X NlA

1.4.11 1.4.11 Automatic Ammunition Handling X NlA

1.4.12 1.4.12 Navigation and Remote Piloting X NlA

1.4.12 1.4.12.1 Navigation and Remote Piloting System Integration, Assembly. Test & Checkout X NlA

1.4.12 1.4.12.2 Navigation and Remote Piliting Systems Engineering/Program Management X NlA

1.4.12 1.4.12.3 Vision Systems X NIA

1.4.12 1.4.12.4 Navigation Systems X NIA

1.4.12 1.4.12.5 Other Navigation Systems X N/A

1.4.13 1.4.13 Special Equipment X N/A

1.4.13 1.4.13.1 Special Equipment Integration, Assembly. Test & Checkout X NIA

1.4.13 1.4.13.2 Special Equipment Systems EngineeringIProgram Management X N/A

1.4.13 1.4.13.3 Nuclear. Biological. & Chemical (NBC) Deteclion & Warning System X NIA

1.4.13 1.4.13.4 Chemical Detection System X N/A

1.4.13 1.4.13.5 Hydraulic Crane System X NIA

1.4.13 1.4.13.6 Recovery Winch System X N/A

1.4.13 1.4.13.7 Air Compressor System X N/A

1.4.13 1.4.13.8 Welder & Welder Power Supply System X N/A

1.4.13 1.4.13.9 Other Special Equipment Systems X N/A

1.4.14 1.4.14 Communications X N/A

1.4.14 1.4.14.1 Communicalions Syslem Inlegralion, Assembly. T esl & Checkout X NIA

00 FORM 2794. MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 9 of 13

WBS REPORTING ELEMENTS

13. REPORTS REQUIRED

(X if applicable)

DO 1921-3 (CBDR): 0

a. PROGRAM/

CONTRACT/

SUBCONTRACT

b. CONTRACT/

SUBCONTRACT

a.CWBS

DICTIONARY

b. DO 1921

(CDSR)

c. DO 1921-1

(FCHR)

d. DO 1921-2

(PCR)

e. DO 19214

(CSR)

f. SRDR

FORMATS

1.4.14 1.4.14.2 Communications Systems Engineering/Program Management X N/A

1.4.14 1.4.14.3 Radio System X N/A

1.4.14 1.4.14.4 Antennas X N/A

1.4.14 1.4.14.5 Vehicle Intercom System X N/A

1.4.14 1.4.14.6 Processors. Displays. and Applications X N/A

1.4.14 1.4.14.7 Racks X N/A

1.4.14 1.4.14.8 Other Communications Systems X N/A

1.4.15 1.4.15 Vehicle Software Release l ...n X N/A

1.4.15.1 1.4.15.1 Vehicle Application Software X N/A

1.4.15.1 1.4.15.1.1 Vehicle Application Software Integration. Assembly. Test & Checkout X N/A

1.4.15.1 1.4.15.1.2 Vehicle Application Software Systems Engineering/Program Management X N/A

1.4.15.1 1.4.15.1.3 Mobility. Power. and Auxiliary (MPA) Software X N/A

1.4.15.1 1.4.15.1.4 Command and Control Software X N/A

1.4.15.1 1.4.15.1.5 Controls and Displays (C&D) Software X N/A

1.4.15.1 1.4.15.1.6 Software Loader Verifier (SLV) X N/A

1.4.15.2 1.4.15.2 Vehicle System Software X N/A

1.4.15.2 1.4.15.2.1 Vehicle System Software Integration. Assembly. Test & Checkout X N/A

1.4.15.2 1.4.15.2.2 Vehicle System Software Systems Engineering/Program Management X N/A

1.4.15.2 1.4.15.2.3 System Software (Operating Systems) X N/A

1.4.15.2 1.4.15.2.4 Software Development Environment X N/A

1.4.15.2 1.4.15.2.5 Software Test Environment X N/A

1.4.16 1.4.16 Other Vehicle Subsystems l ...n (Specify) X N/A

1.5 1.5 System Engineering X X X

1.5 1.5.1 Systems Engineering Management X X X

1.5 1.5.2 Requirements, Interface, Architecture Management X X X

1.5 1.5.3 Reliability, Availability, Maintainability (RAM) Engineering X X X

1.5 1.5.4 Human Factors and Safety Engineering X X X

1.5 1.5.5 System Analysis X X X

1.5 1.5.6 Modeling & Simulation X X X

1.5 1.5.7 Configu ration Management X X X

1.6 1.6 Program Management X X X

1.6 1.6.1 Contracts Management X X X

1.6 1.6.2 Program Control/Suisness Management X X X

1.6 1.6.3 Schedule Management X X X

1.6 1.6.4 Supply Chain Management X X X

1.6 1.6.5 LogistiCS Management & Supportability X X X

1.6 1.6.5.1 Logistics Management X X X

1.6 1.6.5.2 Supportability Analysis X X X

1.6 1.6.5.3 Supply Support X X X

1.6 1.6.5.4 Training Development X X X

1.6 1.6.5.5 Packaging, Handling, Storage, and Transportation (PHST) X X X

1.7 1.7 System Test and Evaluation X X X

1.7.1 1.7.1 Development Test and Evaluation X X X

1.7.2 1.7.2 Operational Test and Evaluation X X X

1.7.3 1.7.3 Mock-ups / System Integration Labs (SILs) X X X

1.7.4 1.7.4 Test and Evaluation Support X X X

1.7.4 1.7.4.1 T&E Support Prototype Vehicles X X X

1.7.4 1.7.4.1.1 T&E Management Support X X X

1.7.4 1.7.4.1.2 Developmental Testing Onsite Support X X X

1.7.4 1.7.4.1.3 Operational Testing Onsite Support X X X

DO FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE Page 10 of 13

Page 11 of 13DD FORM 2794, MAY 2011 PREVIOUS EDITION IS OBSOLETE

1.13.1 1.13.1 Construction/Conversion/Expansion X X X

1.13 1.13 Industrial Facilities X X X

1.12.5 1.12.5 Sustainment/Interim Contractor Support X X X

1.14 1.14 Initial Spares and Repair Parts X X X

1.13.3 1.13.3 Maintenance (Industrial Facilities) X X X

1.13.2 1.13.2 Equipment Acquisition or Modernization X X X

1.12.1 1.12.1 System Assembly, Installation and Checkout on Site X X X

1.12 1.12 Operational/Site Activation X X X

1.12.4 1.12.4 Site/Ship/Vehicle Conversion X X X

1.12.3 1.12.3 Site Construction X X X

1.12.2 1.12.2 Contractor Technical Support X X X

Total Price X

Reporting Contractor Profit/Loss or Fee X

Reporting Contractor Undistributed Budget X

Reporting Contractor G&A X

Subtotal Cost X

Total Cost X

Reporting Contractor FCCM X

Reporting Contractor Management Reserve X

1.7.4 1.7.4.2.5 T&E Spare & Repair Parts X X X

1.7.4 1.7.4.2.4 Live Fire Test & Evaluation Onsite Support X X X

1.7.4 1.7.4.2.3 Operational Testing Onsite Support X X X

1.8.1 1.8.1 Equipment X X X

1.8 1.8 Training X X X

1.7.5 1.7.5 Test Facilities X X X

1.7.4 1.7.4.1.5 T&E Spare & Repair Parts X X X

1.7.4 1.7.4.1.4 Live Fire Test & Evaluation Onsite Support X X X

1.11.2 1.11.2 Support and Handling Equipment X X X

1.7.4 1.7.4.2.2 Developmental Testing Onsite Support X X X

1.7.4 1.7.4.2.1 T&E Management Support X X X

1.7.4 1.7.4.2 T&E Support Production Vehicles X X X

1.8.2 1.8.2 Services X X X

1.10.1 1.10.1 Test and Measurement Equipment X X X

1.10 1.10 Peculiar Support Equipment X X X

1.9.5 1.9.5 Data Depository X X X

1.11.1 1.11.1 Test and Measurement Equipment X X X

1.11 1.11 Common Support Equipment X X X

1.10.2 1.10.2 Support and Handling Equipment X X X

1.9.1 1.9.1 Technical Publications X X X

1.9 1.9 Data X X X

1.8.3 1.8.3 Facilities X X X

1.9.4 1.9.4 Support Data X X X

1.9.3 1.9.3 Management Data X X X

1.9.2 1.9.2 Engineering Data X X X

f. SRDR

FORMATS

d. DD 1921-2

(PCR)

c. DD 1921-1

(FCHR)

b. DD 1921

(CDSR)

a. CWBS

DICTIONARY

11. WBS ELEMENT CODE

a. PROGRAM/

CONTRACT/

SUBCONTRACT

12.

WBS REPORTING ELEMENTS

b. CONTRACT/

SUBCONTRACT

(X if applicable)

13. REPORTS REQUIRED

DD 1921-3 (CBDR): X

e. DD 1921-4

(CSR)

14. CSDRSUBMISSION DATES

d.ASOF DATE e.DUEDATEc.a. b.

EVENTSUBMISSION FORM(S)

(YYYYMMDD) (YYVYMMDD)

CWBS Dictionary

1921,1921-1,1921-2

CWBS Dictionary

1921,1921-1,1921-2

CWBS Dictionary

1921,1921-1,1921-2

Ctr Awd (CWBS Dictionary)

Ctr Awd (CCDRs)

Completion or EMD Vehicle Build (CWBS Dictionary)

Completion or EMD Vehicle Build (CCDRs)

Completion or Comp. T&E (CWBS Dictionary)

Completion of Compo T&E (CCDRs)

20151201

20151201

20170101

20170101

20180101

20180101

20160131

20160131

20170303

20170303

20180303

20180303

15. REMARKS

NON·RECURRING/RECURRING DEFINITIONS

The contractor will utilize the specific definitions and requirements in the CSDR Manual (000 5000.04·M·1) and the definitions in the DIDs for the forms 1921, 1921·1, and 1921·2 to segregate Recurring and Nonrecurring costs discretely and not as an aggregate. Refinements or expansions to these definitions are TBD pending the pre-contract or post contract award conference.

COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT

Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.

1921·3 CONTRACTOR BUSINESS DATA REPORT

The DO Form 1921·3 is a mandatory requirement for all prime contractors and subcontractors performing work on contract which contain CSDR requirements.

a. The Contractor Business Data Report is prepared by and for the business entity (e.g., bUSiness unit, segment, or site) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government.

b. Reports are submitted annually at the end of the contractor's fiscal year.

c. Data for Future Years should be reflective of the number of years contained in the most current document, i.e., the FPRP or the FPRA. If the document applies to more than three future years, attach additional future year sheets as required. In the absence of these documents, estimates should be provided for three future years.

DO FORM 2794, MAY 2Q11 PREVIOUS EDmON IS OBSOLETE Page 12 of 13

1921·2 PROGRESS CURVE REPORT

All DO Form 1921·2 must be reported on a UNIT basis. 1921·2 will be required for the manufacturing of the EMD build period. The vehicles per unit cost within each lot must be reported on the 1921·2 (e.g., if 16 units are completed for EMD Build, Submission # 4, Completion of EMD Vehicle Build, should capture costs associated with each completed unit discretely on the 1921·2 reports in Columns A1-A16 (COMPLETED UNITS/LOTS).

CCDR REPORTING REQUIREMENT FOR CLiNs

Per DoOM 5000.04·M·1 "Cost and Software Data Reporting (CSDR) Manual";

a) For CCDR purposes, contract value shall represent the estimated price at contract completion (i.e., initial contract award plus all expected authorized contract changes) and be based on the assumption that all contract options shall be exercised.

b) Contractors shall report all costs associated with the contract, including advance procurement, long lead materials, multiyear procurement, inter·division or inter-company work orders, foreign military sales, warranty, etc. Costs should not be omitted based on contract line item number (CLlN) structure or definition. Contractors shall report the CLiNs reported within each CSDR in the DD·Form 1921 remarks section.

Per this definition, any changes/modificatIons to the CLiN structure to include (but not limited to) addition of new CLiNs or the removal of CLiNs shall be reported/reflected in the CCDR submissions.

DD FORM 2794, MAY 2011 PREVIOUS EDmON IS OBSOLETE Page 13 of 13