Attachment_26_-_Technical_Instructions.doc

DOC document 68 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 26 - Technical Instructions

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle 1. 1, newest first.
File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
Attachment_23_-_ACV_1.1_RFP_DD254_M67854-15-R-0001__20150429.pdf PDF
Attachment_10.2_-_GFP_Report_ACV_2015_04_21.pdf PDF
CDRL_A010.pdf PDF
Amendment_4.pdf PDF
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
CDRL_A031.pdf PDF
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
CDRL_A060.pdf PDF
CDRL_A058.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
M67854-15-R-0001-0002.pdf PDF
Attachment_11_-_Test_Schedules_and_Test_Locations_150406.docx DOCX document
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
M67854-15-R-0001-0001.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
Attachment_28_-_COVER.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_27_-_Contractor_Request_to_use_Prohibited_Material.pdf PDF
Attachment_14_-_ACV_IUID_Plan_Signed.pdf PDF
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
Attachment_28_-_ACV_1.1_CWBS_Index_and_Dictionary.xlsx XLSX spreadsheet
Attachment_10.2_-_GFP_Report_ACV_2015_03_20.pdf PDF
Attachment_06.1_-_ACV_PLAN_EMD_Signed_Approved_Contract_Plan_N-14-G-C1.pdf PDF
Attachment_02_-_COVER_150319.docx DOCX document
Attachment_16.2_-_TABLE_A-II_Oper_and_Combined_Oper_Maint_Rqumts.docx DOCX document
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
Attachment_03_-_Meeting_List_150319.docx DOCX document
Attachment_05.1_-_ACV1_1_IMP_v2.0_031015.pdf PDF
1_ACV_1.1_CDRLs_03192015.pdf PDF
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_30_-_Integrated_Data_Environment.docx DOCX document
Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx PPTX presentation
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Attachment_05_-_COVER.docx DOCX document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Show all 50

Amphibious Combat Vehicle 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 26

Technical Instructions

20 March 2015

Applicability. These procedures apply to Technical Instructions issued per the Studies/Advanced Capability Improvements Option CLINs.

Contents. Technical Instructions issued under this contract shall be in writing and issued via a modification to the contract.

Format. The attached form will be used for issuance of the Technical Instructions. Contractor format will be acceptable for the results of the Technical Instruction effort and CDRLs.

Procedures

When the Government has a Technical Instruction requirement, the Contracting Officer will issue a Draft Technical Instruction on the attached form to the Contractor with a request to the Contractor to submit a plan for accomplishing the task. The Draft Technical Instruction will include, but not be limited to, the description of the task to be performed, the period of performance, and a description of the deliverables. Issuance of a Draft Technical Instruction does not authorize performance of the task.

The Contractor shall submit a Technical Plan within seven (7) calendar days after receipt of the Draft Technical Instruction, or within such time as otherwise indicated by the Contracting Officer. The Technical Plan will include a brief description of the method and approach to accomplish the task and the information identified above, with supporting rationale. Please include associated costs and travel costs in the plan as well.

Upon receipt of the Technical Plan, the Contracting Officer will provide either an executed Technical Instruction, or advise the Contractor of changes required to the Technical Plan or proposed pricing. Once the Contracting Officer and the Contractor have agreed on the contents of the Technical Plan, the Contracting Officer will sign and provide the effective date authorizing the start of the effort and issue the Technical Instruction via a modification to the contract. The Technical instruction will include the items listed above in the Content Section.

TASK INSTRUCTION

1.
Contractor Name And Address
2.
Contract No.:
3.
Clin:
4.
Task Instruction No.:
5.
SOW Paragraph(s):
6.
Contracting Officer’s Representative

Signature

Date

7.
Description Of Task To Be Performed
8.
Effort For This Task

Estimated Cost:

Est. Fee:
$
Estimated CPFF:
$

Maximum DPLH:

Estimated Level-Of-Effort (Man Years):

Period Of Performance:

10.
Deliverables And Government Furnished Resources

CDRLs Required: (Check All That Apply) x001 - Scientific & Technical Reports x002 - Presentation Material

Due Dates For CDRLs:

Government Resources (If Any):

11.
(If Applicable)

Contractor

Date

Signature

12.
This Task Instruction Is Issued Pursuant To Special Contract Requirement H-38 Of The Contract.

Contracting Officer (Typed)

Date

Signature

TASK INSTRUCTION

CONTINUATION PAGE

1.
Contractor Name And Address
2.
Contract No.:
3.
Clin:
4.
Task Instruction No.:
5.
SOW Paragraph(s):