Attachment_22_-__ACV_1.1_Integrated_Program_Plan_-_2015_03_19.pptx

PPTX presentation 243 KB Posted

Attached to
Amphibious Combat Vehicle 1. 1
Solicitation number
M67854-15-R-0001
Issued by

About this file

Attachment 22 - ACV 1.1 Integrated Program Plan - 2015 03 19

View the file

Other files

File Type Posted
M67854-15-R-0001-0003.doc DOC document
M67854-15-R-0001-0005.doc DOC document
Amendments_1-4_Summary_of_Changes.docx DOCX document
Attachment_01_-_MASTER_SOW_-_150421.pdf PDF
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
CDRL_A058.pdf PDF
Attachment_05_-_ACV1_1_IMP_-_150420.pdf PDF
CDRL_A031.pdf PDF
CDRL_A059.pdf PDF
CDRL_A129.pdf PDF
Attachment_21_-_Mar_15_updated_DI-SESS-_81758_Appendix_A_Attribute_Selection_Sheet.pdf PDF
CDRL_A060.pdf PDF
CDRL_A118.pdf PDF
Attachment_10.3_-_Government_Furnished_Information.xlsx XLSX spreadsheet
Attachment_11-_Test_Schedules_and_Test_Locations_28_Apr_15.docx DOCX document
CDRL_A010.pdf PDF
Attachment_10.2_-_GFP_Report_ACV_2015_04_21.pdf PDF
Amendment_4.pdf PDF
Attachment_23_-_ACV_1.1_RFP_DD254_M67854-15-R-0001__20150429.pdf PDF
QandA_Round_3.xlsx XLSX spreadsheet
M67854-15-R-0001-0002.pdf PDF
ACV_1_1_RFP_QA_Round_2.pdf PDF
Attachment_23_-_DD254_for_M67854-15-R-0001_(Rev_4)_20150409.pdf PDF
ACV_1_1_RFP_QA_Amendment_0001.pdf PDF
Attachment_01_-_MASTER_SOW_-_150415.pdf PDF
M67854-15-R-0001-0001.pdf PDF
Attachment_11_-_Test_Schedules_and_Test_Locations_150406.docx DOCX document
Section_L_Attachment_1_-_ACV_1.1_Solicitation_-_Questions_Answer_Log_Final.xlsx XLSX spreadsheet
Attachment_17_-_Technical_Data_Package.docx DOCX document
Attachment_10.3_-_GFI.xlsx XLSX spreadsheet
Attachment_16_-_TMCR_150202.docx DOCX document
Attachment_11-Test_Schedules_and_Test_Locations_-_150303.docx DOCX document
Attachment_16.2_-_TABLE_A-II_Oper_and_Combined_Oper_Maint_Rqumts.docx DOCX document
Attachment_06.1_-_ACV_PLAN_EMD_Signed_Approved_Contract_Plan_N-14-G-C1.pdf PDF
Attachment_02_-_COVER_150319.docx DOCX document
1_ACV_1.1_CDRLs_03192015.pdf PDF
Attachment_26_-_Technical_Instructions.doc DOC document
Attachment_10.2_-_GFP_Report_ACV_2015_03_20.pdf PDF
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
M67854-15-R-0001_ACV_1.1_RFP.doc DOC document
Attachment_10.1_-_GFP_Supplemental_Information.xlsx XLSX spreadsheet
Attachment_01_-_MASTER_SOW_-_150319_(FINAL).pdf PDF
Attachment_16_-_Cover.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_23_-_DD254_M67854-15-R-0001_Rev_3_022515.pdf PDF
TOP_02-2-501_SWIMMING_TESTS_OF_WHEELED_AND_TRACKED_VEHICLES_(18_Nov_80).pdf PDF
ACV_1.1_RFP_Cover_Letter_M67854-15-R-0001.pdf PDF
Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
TOP_02-2-611_STANDARD_OBSTACLES_(17_Mar_10).pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MDD

MS B

Dev. RFP Release

MS C / DAB

Down Select

FRP Decision

IOC

FOC

PRR/SVR/FCA

PDR/CDR

SRR 2

SRR 1

MROC

CDD

JROC

Approved Requirements

CPD

DOT&E/LF beyond LRIP & IOT&E Report

FUSL (4) Vehicles IOT&E (21 Vehicles)

DT on Down-Selected KTR

GDT (2KTR)

EMD LFT (2KTR)

OA

TTP Development

PQT/RQT

Draft

RFP

Draft

RFP

RFI

RFP

Contract Award to 2 KTRs to deliver 16 Samples each

Down Select to 1 LRIP Option Exercised

(26-PMC,

4-RDT&E (FUSL))

LRIP 2

(30)

FRP Option Exercised

IBR

30 vehicles (Includes 4 FUSL)

38 vehicles

80 vehicles

30 vehicles

30 vehicles ACV Integrated Program Plan As of 19 Mar 15

VAR

PCA

Operator

Maintenance

Maintenance

Analysis & Design Delivery

Material Delivery

Stand Up Gov’t. Training Dev.

ILA

ILA

ILA

Log Demo

LRIP 1

FRP Lot 1

FRP Lot 2

FRP Lot 3

LRIP 2

EMD

Deliver 16 Samples each (32 vehicles)

Depot Standup

TRR

Gate 5

Gate 6

Unclassified (U) Unclassified (U)

Logistics and Training Acquisition Decision Points Systems Engineering = Tech Reviews

Test & Evaluation = Select Documents

= Test Event

= IBR

Major Contract Events = RFP/RFI Release = Contract Award

= Progress Reviews

= Contract Option

= DoN Gate Reviews

= OIPT

= Capability Requirement Other

= Product

= Activity / Event Production = Item Delivery = Item Production

Total Production 208 (4 used to support Live Fire–AAO 204)

Notes: 1. Limited DT on winning Contractor’s sample vehicle 3. SRR-2, PDR/CDR, VAR, TRR, and PRR/SVR will be conducted twice; one for each contractor.

2. OA included in down select testing

= Delivery

= Govt. Training = Development = KTR Training

= Event image3.jpeg image4.png image5.jpeg image1.png image2.jpeg

File details come from the government source that posted it. Updated .