This file is a PowerPoint slide showing a preliminary phase-in schedule for MIOES Task Orders (TOs). The schedule outlines a 6-month phase-in period from July 17, 2026 to February 8, 2027, planning for up to 12 Task Orders that were not awarded with the initial IDIQ contract. The plan divides the TOs into three complexity levels (high, medium, low) and organizes them into three sprints of 4 TOs each, with approximately 2 months allocated per sprint. The most complex TOs are scheduled first to allow maximum time for award and transition.

The schedule appears to be preliminary planning for the MDA IT Operations & Engineering Solutions (MIOES) contract, which will succeed the current IRES contract at the Missile Defense Agency. The visual timeline uses a color-coded legend to indicate complexity levels and marks certain TOs as "Potentially Awardable."

View the file

Other files for this federal contract opportunity

Other files attached to MDA IT Operations & Engineering Solutions (MIOES) - CANCELED, newest first.
File Type Posted
MIOES_IRES PWS -- Enterprise IT (12.20 RFI).pdf PDF
MIOES CLIN Structure RFI 12.20.2024.pdf PDF
MIOES Virtual Industry Brief Schedule.pdf PDF
MIOES DRFP Inc1 CONSOLIDATED QandAs.xlsx XLSX spreadsheet
MIOES Industry Day Overview and Instructions.docx DOCX document
MIOES Cybersecurity PWS DRFP Inc3.pdf PDF
MDA 5013.06 - Source Selection Procedures.pdf PDF
MIOES Section L DRFP Inc2 Rev1.docx DOCX document
MIOES Section M DRFP Inc2.docx DOCX document
Attachment L-6 MIOES Evaluation Scenarios DRFP Inc2.docx DOCX document
Attachment L-3 OCI Analysis Disclosure Form DRFP Inc2.pdf PDF
MIOES LCAT Table DRFP Inc2.xlsx XLSX spreadsheet
MIOES Basic IDIQ PWS 24 June DRAFT RFP.pdf PDF
QA_DRFP_Inc1_MIOES.xlsx XLSX spreadsheet
MIOES Phase-In Task Order PWS 14 June DRAFT RFP.pdf PDF
MIOES Basic IDIQ PWS 14 June DRAFT RFP.pdf PDF
MIOES Acquisition Strategy Summary - 14 June DRAFT RFP.pdf PDF
MIOES Industry Monthly Chargeback Showback - May.pptx PPTX presentation
MIOES Industry Monthly CSSP - June.pptx PPTX presentation
MIOES SE Overview (15 Feb 24).pptx PPTX presentation
22F8900_PWS.pdf PDF
23F3100_PWS.pdf PDF
23F8600_PWS.pdf PDF
22F5900_PWS.pdf PDF
18F8002_PWS.pdf PDF
23F8700_PWS.pdf PDF
23F1500_PWS.pdf PDF
23F7300_PWS.pdf PDF
MIOES OCI Guiding Principles (Final).pdf PDF
20230405-MIOES_Industry_Day_POC.xlsx XLSX spreadsheet
20230103-MIOES_Industry_Day_POC-1.xlsx XLSX spreadsheet
20230103-MIOES_Industry_Day_POC.xlsx XLSX spreadsheet
Attachment J-02 - IRES WBS and CSDR.pdf PDF
Attach L-02 - Team List.docx DOCX document
Attach L-05 - Consent Letter.docx DOCX document
Attach L-07 - PPQ (A0001).docx DOCX document
Attach L-14 - Cost Price WB 1 (A0001).xlsx XLSX spreadsheet
Attachment J-01 - IRES Contract SOO (A0005).docx DOCX document
Attachment J-04 - DD254.pdf PDF
Attach L-10 - IRES SEPI SOO (A0006).docx DOCX document
Attach L-17 - Tool App Questionnaire (A0005).docx DOCX document
Section L (A0008).docx DOCX document
Attachment J-03 - IRES Labor Category Descriptions.xlsx XLSX spreadsheet
Exhibit A - MDA Mandatory CDRLs.docx DOCX document
Exhibit B - IRES CDRLs.docx DOCX document
Attach L-06 - Client Authorization Letter.docx DOCX document
Attach L-11 - EITS SOO (A0005).docx DOCX document
Attach L-12 - FEO SOO (A0005).docx DOCX document
Attach L-16 - Cost Price WB 3 (A0003).xlsx XLSX spreadsheet
Section M (A0006).docx DOCX document
Show all 50

MDA IT Operations & Engineering Solutions (MIOES) - CANCELED has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIOES Remaining TO Award Phase-in Process (not awarded with IDIQ) Assumptions:

Approximately 6 month Phase-in TO Phase-in begins 7/17/2026 and ends 2/8/2027 12 TOs (worst case, if none of the potentially awardable TOs are awarded with IDIQ beyond Phase-in TO) 3 levels of TO complexity (high, medium, low) 3 sprints of 4 TOs Start most complex first to allow for maximum award and transition time Approximately 2 months for each sprint

MIOES TO Award Phase-in Schedule

High Medium Low Complexity Legend Potentially Awardable Potentially Awardable Potentially Awardable image1.jpg image4.png