This document is a PowerPoint presentation that provides an overview of the Mission Integration and Operations for Enterprise Solutions (MIOES) mission engineering effort for the Missile Defense Agency (MDA). The presentation covers the background, purpose, and organization of the MIOES mission engineering activities, which focus on providing mission assurance for MDIOC operations and test events. Key details include:
The MDIOC currently has a single task order for systems engineering and program integration, with the desire to potentially have mission engineering as a stand-alone effort under MIOES. The presentation outlines the planned organization of the mission engineering activities, including an Engineering Review Board, Configuration Control Board, technical baseline management, and mission/event protection. It discusses the need to integrate across multiple government organizations and support contracts to align under a singular governance. The presentation also touches on the importance of Model-Based Systems Engineering, MDIOC facility sustainment, and leadership/processes as critical elements.
View the file
Other files for this federal contract opportunity
Show all 50
MDA IT Operations & Engineering Solutions (MIOES) - CANCELED has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIOES Mission Engineering Overview By: Anthony Bruno MDIOC Deputy Director Missile Defense Agency February 07, 2024
CUI
Purpose
BLUF: This is an information brief
Intent: Provide potential bidders additional information on the MDIOC mission engineering effort
Background
Current IRES contract has Systems Engineering and Program Integration combined in a single task order There are pros/cons to this approach SE could potentially be a stand alone effort under MIOES
Desire is to have a process/structure whereby all contracts in place at the MDIOC follow standardized practices that allow for any contract to flow their activities into the larger MDIOC Technical Baseline Management and Engineering Processes
MDIOC Operational View
MDIOC Concurrent Activities Goal: Provide Mission Assurance for MDIOC operations and test events Configuration Management is a key element Current process is labor intensive Ensure concurrent activities successfully execute Enable the conduct of facility maintenance activities
How do we know we’re ready to support?
MBSE/DE
Opportunity?
Task Order Organization Current thought is to organize the Mission Engineering activity around planning and operations Integrated Planning: using government provided governance, develop supporting processes Engineering Review Board Configuration Control Board Technical baseline management Quality assurance auditing (targeted, not random) Mission/Event protection Situational awareness/Scheduling/Corrective Action Program Integrated Operations MDIOC Facility Mission Assurance Engineering Review Board, Configuration Control Board, Range Risk/Outage Board MIOES process control and monitoring Technical Baseline Management Mission/Event Protection Event Deconfliction, Work Screening Team, Event Protection Team Situational Awareness Issue/Incident Management Integration crosses multiple government organizations and support contracts, all of which must align under singular governance.
Mission Assurance Discussion Focus on MDA’s Mission Essential Functions (MEFs) MEF 1—provide Missile Defense System readiness and sustainment support to the Warfighter MEF 2—manage, direct, and execute the development and delivery of the Missile Defense System What MDIOC Mission Essential Activities (MEAs) support MDA MEFs?
How do we protect those MEAs?
| MDIOC Essential Activities | |
| Cloud Services | Ground Test Support |
| C2 Services | Missile Defense Ops |
| Cybersecurity | Network and Comms |
| Facilities Services | Physical Security |
| Flight Test Support | Space Sensor Support |
| GMD Support | Wargames/Exercises |
Mission Engineering Discussion Engineering Review Board Serves as the single pathway to conduct sustainment, renovation, and modernization activities within the MDIOC In the past, anyone wanting to do work within the MDIOC had to progress through a number of disparate review boards Facilities, IT, MDIOC If done correctly, the board process should enhance cost/schedule/performance for the customer while also providing for standards enforcement and technical baseline management Consolidation of multiple, disparate boards Artifact standardization Software enabled asynchronous review process
Relied upon to ensure sound configuration management of the MDIOC Technical Baseline The ERB is arguably the most important mission engineering activity
Integration Discussion Contract Integration Individual task orders must follow contract level guidance Since different 2-letters oversee different task orders, this can be a challenge to enforce Participation in contract level guidance is not optional The level of integration required between IT services (IC), Facilities services (MS) and MDIOC mission engineering (SS) is not trivial MDIOC Integration All contracts doing work in the MDIOC must align with facility boards, standards and practices
Closing Thoughts Thought Leadership Model Based Systems Engineering How do you implement when the plane is already in flight?
MDIOC Facility Sustainment Technical Utility Service/Uninterruptable Power Supply/Air Handling Units Cooling during a power outage Facility project process
Tools and innovation are good, but good leadership (including middle management), sound processes and a proactive team are better
I’m interested in us doing the right thing, not the easy thing image2.jpg image1.jpg image4.PNG image5.png image6.png image3.jpg