M-001.pdf
PDF 125 KB Posted
- Attached to
- Restack of the William J. Green Federal Building
- Solicitation number
- GS-03-P-16-AZ-C-7004
About this file
Drawing m-001
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DUCTWORK SYMBOLS
MISCELLANEOUS
SUPPLY DIFFUSER 1-WAY BLOW
SUPPLY DIFFUSER 2-WAY BLOW
SUPPLY DIFFUSER 3-WAY BLOW
SUPPLY DIFFUSER 4-WAY BLOW
SUPPLY DUCT (SECTION)
RETURN, EXHAUST, OR TRANSFER
DUCT (SECTION)
EXHAUST DUCT (SECTION)
DRAWING SYMBOLS
DETAIL DESIGNATION OR ENLARGED PLAN
X
X HVAC DRAWING NUMBER WHERE DETAIL IS SHOWN
X
XX
SECTION DESIGNATION
HVAC DRAWING NUMBER WHERE SECTION IS SHOWN
HVAC DRAWING NUMBER WHERE TAKEN FROM
X X
EQUIPMENT TAG
TAG NUMBER
FIN RADIATION
FIN LENGTH
FIN RADIATION TAG NUMBER
FR
XX
POINT OF NEW CONNECTION
POINT OF DISCONNECTION
X-X
T
S
THERMOSTAT
TEMPERATURE SENSOR
XXX
GRILLE/REGISTER/DIFFUSER
GRILLE/REGISTER/DIFFUSER TAG
GRILLE/REGISTER/DIFFUSER NUMBER
BALANCING CFM
AIR FLOW DIRECTION
UNIT HEATER UH
X
DUCTWORK SYMBOLS
DOUBLE LINE SINGLE LINE
DUCT WIDTH x DEPTH
ACOUSTICAL DUCT LINING
AC ALTERNATING CURRENT
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
ADJ ADJUSTABLE
AF AIR FOIL
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFR ABOVE FINISHED ROOF
AFS AIR FLOW STATION
AHU AIR HANDLING UNIT
AP ACCESS PANEL
ARCH ARCHITECTURE
ATC AUTOMATIC TEMPURATURE CONTROL
ATM ATMOSPHERE
AUX AUXILIARY
AVG AVERAGE
AWG AMERICAN WIRE GAUGE
B BOILER
BB BASEBOARD
BC BACKWARD CURVE
BDD BACKDRAFT DAMPER
BF BOILER FEED
BHP BRAKE HORSEPOWER
BI BACKWARD INCLINED
BOD BOTTOM OF DUCT
BOJ BOTTOM OF JOIST
BOS BOTTOM OF STEEL
BTU BRITISH THERMAL UNIT
BTUH BTU PER HOUR
C CONVECTOR
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCW COUNTER CLOCKWISE
CFM CUBIC FEET PER MINUTE
CH CHILLER
C&I CONTROLS AND INSTRUMENTATION
CLG CEILING
CMU CONCRETE MASONARY UNIT
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CORR CORRIDOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONTROL VALVE
CU FT CUBIC FEET
CVS CONTROL VALVE STATION
CVT CONVERTER
CW CLOCKWISE
D DIFFUSER OR REGISTER
dB DECIBEL, RE 10 WATT
DBT DRY BULB TEMPURATURE (°F)
DDC DIRECT DIGITAL CONTROL
DEG DEGREE FAHRENHEIT (°F)
DIA DIAMETER
DIM DIMENSION
DN DOWN
DP DEW POINT TEMPURATURE (°F)
DX DIRECT EXPANSION
DWG DRAWING
E EXHAUST
EA EXHAUST AIR
EAT ENTERING AIR TEMPURATURE (°F)
EC ELECTRICAL CONTRACTOR
EDH ELECTRICAL DUCT HEATER
EDR EQUIVALENT DIRECT RADIATION
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ELEV ELEVATION
EMS ENERGY MANAGEMENT SYSTEM
ERU ENERGY RECOVERY UNIT
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWT ENTERING WATER TEMPURATURE (°F)
F FILTER
F&T FLOAT AND THERMOSTATIC
FA FACE AREA
FC FORWARD CURVE
FCU FAN COIL UNIT
FLR FLOOR
FP FIRE PROTECTION
FPM FEET PER MINUTE
FR FINNED RADATION
FRP FIBERGLASS REINFORCED POLYMER
FT FEET
FVEL FACE VELOCITY
GA GAUGE OR GAGE
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
H HUMIDIFIER
HC HEATING COIL
HG MERCURY
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HR HOUR
HVU HEATING AND VENTILATION UNIT
HX HEAT EXCHANGER
IB INVERTED BUCKET
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IGV INLET GUIDE VANES
IN INCH
IPS IRON PIPE SIZE
IU INDUCTION UNIT
KW KIOWATTS
KWH KILOWATT HOUR
LAT LEAVING AIR TEMPURATURE (°F)
LBS POUNDS
LCP LOCAL CONTROL PANEL
LD LINEAR DIFFUSER
LF LINEAR FEET
LWT LEAVING WATER TEMPURATURE (°F)
M MOTOR OPERATED
MAU MAKEUP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MC MECHANICAL CONTRACTOR
MCC MOTOR CONTROL CENTER
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MMBH 1,000,000 BTUH
NA NOT APPLICABLE
NC NOISE CRITERIA, dB RE 20 uPa
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NPS NOMINAL PIPE SIZE
NPT NOMINAL PIPE THREAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
OBD OPPOSED BLADE DAMPER
OD OUTSIDE DIAMETER
OZ OUNCE
P PUMP
PBD PARALLEL BLADE DAMPER
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDI PRESSURE DIFFERENTIAL INDICATOR
PDV PRESSURE DIFFERENTIAL VALVE
PH PHASE
PHC PREHEAT COIL
PPM PART PER MILLION
PROP PROPELLER
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA PSI, ABSOLUTE
PSIATM PSI, ATMOSPHERE
PSIG PSI, GAUGE
QTY QUANTITY
R REGISTER
RA RETURN AIR
RC ROOM CRITERIA, dB RE 20 uPa
RF RETURN/RELIEF AIR FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
S SMOKE DETECTOR
SA SUPPLY AIR
SAF SUPPLY AIR FAN
SC SENSIBLE COOLER
SCFM CFM, STANDARD CONDITIONS
SEER SEASONAL ENERGY EFFICIENY RATIO
SENS SENSIBLE
SF SQUARE FEET
SP STATIC PRESSURE (IN.WG.)
SPEC SPECIFICATION
SPS STATIC PRESSURE SENSOR
SQ SQUARE
STD STANDARD
SS STAINLESS STEEL
SV SOLENOID VALVE
T THERMOSTAT
TA TRANSFER AIR
TD TEMPURATURE DIFFERENCE (°F)
TEMP TEMPURATURE
TG TRANSFER GRILL
TOD TOP OF DUCT
TOP TOP OF PIPE
TOS TOP OF STEEL
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TYP TYPICAL
UC UNDERCUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
UV UNIT VENTILATOR
V VALVE
VA VOLD-AMPERE
VAV VARIABLE AIR VOLUME
VAVR VAV, WITH REHEAT
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VFV VAV, WITH FAN VOL VOLUME
VP VACUUM PUMP
VVT VARIABLE VOLUME VARIBLE TEMPURATURE
W WATT
WB WET BULB TEMPURATURE (°F)
WC WATER COLUMN
WG WATER GAUGE
WMS WIRE MESH SCREEN
WSHP WATER SOURCE HEAT PUMP
W/ WITH
MECHANICAL ABBREVIATIONS PIPING SYMBOLS
GENERAL
(NAME) E
(NAME)
EXISTING PIPE
ROUND DUCT
INCLINED RISE, IN DIRECTION
OF AIR FLOWR
R
D D
INCLINED DROP, IN DIRECTION
OF AIR FLOW
FLEXIBLE DUCT CONNECTION
ELBOW WITH TURNING VANES
STANDARD RADIUS ELBOW
DAMPER IN WALL
OR FLOORX
SUPPLY REGISTER, DIFFUSER,
OR GRILLE (WALL TYPE)
RETURN GRILLE/REGISTER
RUNOUT TO ROUND SUPPLY
DIFFUSER
RUNOUT TO SQUARE SUPPLY
DIFFUSER
BOD
BOD
BACKDRAFT DAMPER
DUCT HEATING COIL
ELECTRIC DUCT HEATING COIL
WITH CONTROL BOX
MOTOR OPERATED DAMPER
M M
MANUAL VOLUME DAMPER
VD
VD
S
S
SMOKE DETECTOR FURNISHED
AND WIRED BY THE E.C.,
INSTALLED BY THE M.C
X
F
S
FS
FIRE
SMOKE
FIRE/SMOKE
EXISTING PIPE TO BE REMOVED
DIRECTION OF FLOW
HEATING
A
ATV
COMPRESSED AIR
ATMOSPHERIC VENT
BOILER BLOW DOWNBBD
FOD
FOG
FOR
FOS
FOV
FUEL OIL DISCHARGE
FUEL OIL GAUGE
FUEL OIL RETURN
FUEL OIL SUCTION
FUEL OIL TANK VENT
PC
VPD
MU
VAC
HWS HOT WATER SUPPLY
VACUUM AIR
MAKE-UP WATER (COLD WATER FILL)
VACUUM PUMP DISCHARGE
PUMPED CONDENSATE
HWR
MTWS
MTWR
HOT WATER RETURN
MEDIUM TEMPURATURE HOT WATER SUPPLY
MEDIUM TEMPURATURE HOT WATER RETURN
HPS
MPS
LPS
HPC
MPC
LPC
HIGH PRESSURE STEAM
MEDIUM PRESSURE STEAM
LOW PRESSURE STEAM
HIGH PRESSURE CONDENSATE
MEDIUM PRESSURE CONDENSATE
LOW PRESSURE CONDENSATE
AIR CONDITIONING & REFRIGERATION
BS
BR
CS
CR
CHS
CHR
D
FILL
HPWS
HPWR
RL
RS
BRINE SUPPLY
BRINE RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
CHILLED WATER SUPPLY (FAN COIL AND AIR HANDLING UNITS)
CHILLED WATER RETURN (FAN COIL AND AIR HANDLING UNITS)
DRAIN LINE
FILL LINE
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
REFRIGERANT LIQUID
REFRIGERANT SUCTION
SYSTEM SPECIALTIES
TRAP, FLOAT
TRAP, THERMOSTATIC
TRAP, FLOAT & THERMOSTATIC
TRAP, INVERTED BUCKET
RS
T
VALVES
BALL
BUTTERFLY
GATE
GLOBE
PLUG
CALIBRATED BALANCE/FLOW MEASURE
CHECK VALVE (ARROW INDICATED DIRECTION
OF FLOW)
RELIEF (R) OR SAFETY (S)
PRESSURE REDUCING
DRAIN VALVE W/ HOSE CONNECTION
AND SEAL CAP
ATC, TWO-WAY
SOLENOID
ATC, THREE-WAY
REFRIGERANT EXPANSION, AUTOMATIC
REFRIGERANT EXPANSION, MANUAL
REFRIGERANY EXPANSION,
ELECTRIC
FLOW CONTROL VALVE
(A=AUTOMATIC, M= MANUAL)
S
M
F A
PIPING SYMBOLS
PIPING SPECIALTIES & FITTINGS
ANCHOR
PIPE GUIDES
FLEXIBLE CONNECTION
FINNED RADIATION
MANUAL AIR VENT
CONCENTRIC REDUCER OR INCREASER
AUTOMATIC AIR VENT
ECCENTRIC REDUCER OR INCREASER
TOP CONNECTION, 45 DEG OR 90 DEG
BOTTOM CONNECTION, 45 DEG OR 90 DEG
SIDE CONNECTION OR TEE FITTING
CAPPED OUTLET
CHANGE IN ELEVATION OF PIPE
PIPE RISE OR ELBOW TURNED UP
PIPE DROP OR ELBOW TURNED DOWN
UNION OR FLANGE
STRAINER
STRAINER W/ BLOWDOWN AND HOSE END CONNECTION
THERMOMETER
PRESSURE GAUGE
THERMOMETER WELL
NEEDLE VALVE
FLOW SWITCH
PRESSURE SWITCH
WATER FLOW MEASURING DEVICE
TEST/PLUG
PUMP
SIGHT GLASS
BLIND FLANGE
HOSE END CONNECTION
AV
FS
PS
P/T
1. CODES AND STANDARDS LISTED IN SPECIFICATIONS AND DRAWINGS ARE MINIMUM STANDARDS. WHERE REQUIREMENTS ON THE DRAWINGS OR SPECIFICATIONS EXCEED THE MINIMUM CODE REQUIREMENTS, THE DRAWINGS OR SPECIFICATIONS SHALL GOVERN.
2. THE POWER RATING OF MOTORS AND OTHER MECHANICAL EQUIPMENT AND THE ELECTRICAL CHARACTERISTICS OF ELECTRICAL SYSTEMS SERVING THEM HAVE BEEN ESTABLISHED AS MINIMUMS WHICH ALLOW THAT EQUIPMENT TO FUNCTION PROPERLY TO PRODUCE THE REQUIRED CAPACITIES. POWER RATINGS INCLUDE REASONABLE SAFETY FACTORS TO ACCOMMODATE COMMON DIFFERENCES BETWEEN DESIGN PARAMETERS AND FIELD CONSTRUCTION PRACTICES. EQUIPMENT WITH POWER RATINGS LESS
THAN THOSE INDICATED ON THE DRAWINGS SHALL NOT BE PERMITTED.
3. REASONABLE EFFORTS HAVE BEEN MADE TO COORDINATE ELECTRICAL REQUIREMENTS OF MECHANICAL EQUIPMENT WITH THE ELECTRICAL SYSTEMS SERVING THAT EQUIPMENT. DIFFERENCES AMONG MANUFACTURERS OF MECHANICAL EQUIPMENT MAKE IT IMPOSSIBLE TO PRODUCE A SINGLE ELECTRICAL DESIGN WHICH WILL SATISFY THE VARYING ELECTRICAL REQUIREMENTS OF THE THOSE MANUFACTURERS. CONSEQUENTLY, THE CONTRACTOR SHALL COORDINATE THE ELECTRICAL REQUIREMENTS OF THE MECHANICAL EQUIPMENT ACTUALLY FURNISHED ON THIS PROJECT WITH THE EQUIPMENT ACTUALLY FURNISHED ON THIS PROJECT AND PROVIDE ELECTRICAL SYSTEMS REQUIRED BY THAT EQUIPMENT. THIS COORDINATION EFFORT SHALL BE COMPLETED PRIOR TO THE INSTALLATION OF EITHER THE MECHANICAL EQUIPMENT OR THE ELECTRICAL SYSTEMS SERVING THAT EQUIPMENT.
ELECTRICAL SYSTEM REVISIONS REQUIRED TO COORDINATE WITH THE MECHANICAL EQUIPMENT ACTUALLY FURNISHED SHALL BE
PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
4. DRAWINGS INDICATE GENERAL LOCATIONS OF FIXTURES, APPARATUS, EQUIPMENT, PIPING, AND DUCTWORK. CHANGES ON LOCATION SHALL BE MADE TO ACCOMMODATE EXISTING OR NEW BUILDING CONDITIONS AND COORDINATION WITH OTHER TRADES, INCLUDING HVAC, PLUMBING, ELECTRICAL, FIRE PROTECTION, STRUCTURAL, AND ARCHITECTURAL, SHALL BE MADE WITHOUT
ADDITIONAL COST TO THE OWNER.
5. PROVIDE ACCESS TO EQUIPMENT AND PORTIONS OF BUILDING SYSTEMS REQUIRING SERVICE.
6. DO NOT INSTALL DUCTWORK, PIPING, OR EQUIPMENT IN ELECTRICAL ROOMS, ELEVATOR ROOMS, OR ELEVATOR SHAFTS, UNLESS EXPLICITLY INDICATED ON THE DRAWINGS. PIPING, DUCTWORK, AND EQUIPMENT (SWITCHGEAR, SWITCHBOARDS, PANELS, MOTOR CONTROL CENTERS, VARIABLE FREQUENCY DRIVES, TRANSFORMERS, OR STARTERS) SHALL NOT BE INSTALLED DIRECTLY ABOVE
OR 42" IN FRONT OF ELECTRICAL EQUIPMENT FROM THE FLOOR TO THE STRUCTURE ABOVE.
7. FOR RENOVATION PROJECTS WHERE THE BUILDING IS OCCUPIED, SCHEDULE WORK SO EXISTING SYSTEMS WILL BE INTERRUPTED FOR A MINIMUM AMOUNT OF TIME. OBTAIN APPROVAL FROM THE OWNER AND ARCHITECT AT LEAST 14 DAYS PRIOR TO INTERRUPTION OR CONNECTION. NO ALLOWANCE WILL BE MADE FOR LACK OF KNOWLEDGE OF EXISTING CONDITIONS.
8. UNLESS INDICATED OTHERWISE, EQUIPMENT AND MATERIALS SHALL BE NEW AND OF THE CUSTOMARY STANDARD AND QUALITY
FURNISHED BY THE DESIGNATED MANUFACTURER FOR THAT CATALOG NUMBER.
9. FOR EXISTING SYSTEMS, REMOVE EXPOSED PIPING AND DUCTWORK RENDERED USELESS DUE TO CHANGES. PLUG OUTLETS IN
PIPING. CAP AND SEAL OPENINGS IN DUCTWORK AND SEAL AIRTIGHT.
10. AIR SYSTEMS SHALL OPERATE WITHOUT AERODYNAMIC NOISE GENERATED FROM FAULTY INSTALLATION OF DUCTWORK, DIFFUSERS, OR ANY PORTION OF THE AIR DISTRIBUTION SYSTEM.
11. SUPPORT PIPING INDEPENDENTLY OF EQUIPMENT. HANGER RODS SHALL BE SUSPENDED FROM THE STRUCTURE. DO NOT SUSPEND
FROM OTHER PIPING, CONDUIT, EQUIPMENT, OR DUCTWORK.
12. ALL WORK REFERENCED UNDER DIVISION 23 SHALL BE DONE BY THE MECHANICAL CONTRACTOR.
GENERAL MECHANICAL NOTES:
1. INSTALL PIPING TO ALLOW ACCESS FOR VALVES, AIR
VENTS, AND EQUIPMENT REQUIRING ACCESSIBILITY, AND
TO PROVIDE MAXIMUM HEADROOM.
2. PROVIDE OFFSETS TO MAINTAIN CEILING HEIGHT AND TO
COORDINATE WITH OTHER TRADES.
3. INSTALL VALVES IN HORIZONTAL PIPING WITH VALVE
STEMS AT OR ABOVE THE PIPE CENTERLINE.
4. ARRANGE PIPING FOR VENTING OF AIR AND DRAINAGE OF
ENTIRE SYSTEM.
5. REPLACE EXISTING MECHANICAL PIPE HANGERS AND
PIPE FLOOR SUPPORTS WITH NEW TO SERVE EXISTING
MECHANICAL PIPING TO REMAIN IN ORDER TO
ACCOMMODATE THE INSTALLATIONOF ALL NEW
EQUIPMENT, SYSTEMS, AND DEVICES. MECHANICAL
CONTRACTOR SHALL VERIFY EXACT LOCATIONS AND
SIZES IN THE FIELD.
6. WHEREVER NEW PIPING IS JOINED TO EXISTING PIPING,
THE MECHANICAL CONTRACTOR SHALL PROPERLY SEAL
THESE CONNECTIONS WATERTIGHT AND INSULATE THESE
LOCATIONS WITH NEW INSULATION AS INDICATED IN THE
SPECIFICATION.
7. FOR COPPER AND STEEL PIPING GROOVED OR
MECHANICALLY FORMED T-TYPE FITTINGS ARE NOT
ACCEPTABLE.
8. LUBRICATE, EXERCISE, CLEAN AND TEST ALL EXISTING
VALVES AND STRAINERS FOR THE HEATING PLANT,
COOLING PLANT (CHILLED WATER AND CONDENSER
WATER), PIPE RISER TAKE-OFFS, 10TH FLOOR PUMP
ROOM, AND PIPE MAIN SHUTOFFS PER THE
MANUFACTURER'S INSTRUCTIONS.
1. CHANGES IN SHAPE OR DIMENSION SHALL BE MADE WITH
MAXIMUM TRANSITION OF 1 TO 7.
2. SEPARATE GALVANIZED SHEET METAL FROM ALUMINUM OR
COPPER PER THE SPECIFICATIONS.
3. PROVIDE SUPPLEMENTAL STIFFENING AND SUPPORTS TO
DUCTS AND APPARATUS CASINGS TO PREVENT DRUMMING,
SAGGING AND TO PROVIDE A STRUCTURALLY SOUND ASSEMBLY.
4. PROVIDE OFFSETS AND TRANSITIONS TO COORDINATE WITH
OTHER TRADES.
5. PROVIDE DUCTWORK AND TRANSITIONS TO CONNECT DUCTWORK TO
NEW OR EXISTING EQUIPMENT, DUCTWORK, AND COILS.
6. INSTALL FLEXIBLE PERMANENT DUCTWORK IN A FULLY EXTENDED
CONDITION WITHOUT SAGS AND KINKS.
7. MECHANICAL CONTRACTOR SHALL INSTALL DUCT MOUNTED SMOKE
DETECTORS IN ACCESSIBLE LOCATIONS. DETECTORS SHALL BE
FURNISHED AND WIRED BY THE ELECTRICAL CONTRACTOR. REFER
TO ELECTRICAL DRAWINGS FOR EXACT QUANTITY AND LOCATIONS.
8. INDICATED DIMENSIONS DENOTE FREE AND CLEAR INSIDE
DIMENSIONS.
9. REPLACE EXISTING DUCT HANGERS WITH NEW TO SERVE EXISTING
DUCTWORK TO REMAIN IN ORDER TO ACCOMMODATE THE
INSTALLATION OF ALL NEW EQUIPMENT, SYSTEMS, AND DEVICES.
MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS
AND SIZES IN THE FIELD.
10. WHEREVER NEW DUCTWORK IS JOINED TO EXISTING DUCTWORK,
THE MECHANICAL CONTRACTOR SHALL PROPERLY SEAL THESE
CONNECTIONS AIRTIGHT AND INSULATE THESE LOCATIONS WITH NEW
INSULATION AS INDICATED IN THE SPECIFICATION.
GENERAL PIPING NOTES: GENERAL DUCTWORK NOTES:
1. TRANSFORMERS OR FILTERS FOR OPERATION OF AUTOMATIC TEMPERATURE CONTROLS FROM BUILDING POWER
CIRCUITS SHALL BE PROVIDED UNDER DIVISION 23.
2. LOW VOLTAGE WIRING (LOWER THAN 110 VOLTS) FOR INTERLOCKED DEVICES, DDC CONTROLLERS, TERMINAL CONTROL UNITS, FLOW MEASURING DEVICES, AND OTHER POWER CONSUMING CONTROL DEVICES SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR. ALL LOW VOLTAGE WIRING SHALL BE INSTALLED IN
A CONDUIT AND SHALL BE PLENUM RATED.
3. WIRING 110 VOLTS AND HIGHER FOR INTERLOCKED DEVICES, DDC CONTROLLERS, TERMINAL CONTROL UNITS, FLOW MEASURING DEVICES, AND OTHER POWER CONSUMING CONTROL DEVICES SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR WITH DIVISION 26 REQUIREMENTS. COORDINATE WITH THE ELECTRICAL
CONTRACTOR.
4. BRANCH CIRCUIT WIRING AND CONDUIT FURNISHED FOR CONTROL EQUIPMENT POWER SHALL BE SEPARATE FROM OTHER POWER WIRING. EACH CIRCUIT SHALL EXTEND TO A 120V BRANCH CIRCUIT PANEL, AND IDENTIFIED 120V, 20 AMPERE, SINGLE POLE BRANCH CIRCUIT BREAKER FURNISHED IN THE PANEL TO SERVE THE CIRCUIT. NO MORE THAN 2 DDC CONTROLLER INSTALLATIONS SHALL OPERATE FROM A SINGLE 120V BRANCH CIRCUIT, UNLESS
INDICATED OTHERWISE.
5. WHERE SYSTEMS ARE SERVED BY EMERGENCY POWER, CONTROLS FOR OPERATION OF THOSE SYSTEMS SHALL
ALSO BE SERVED BY EMERGENCY POWER.
6. WHERE DAMPERS PREVENT AIRFLOW THROUGH AN AIR HANDLING UNIT OR FAN, THOSE DAMPERS SHALL BE PROVEN OPEN PRIOR TO STARTING THE UNIT OR FAN. PROOF SHALL BE BY MECHANICAL SAFETY LIMIT SWITCH ACTIVATED BY THE DAMPER BLADE. FOR SERVICE WITH VARIABLE FREQUENCY DRIVES THE SWITCH SHALL BE WIRED IN THE AUTOMATIC AND HAND/TEST POSITIONS AND IN THE BYPASS POSITION FOR VARIABLE FREQUENCY DRIVES WITH
BYPASS.
7. ALL AIR PIPING OR TUBING SHALL BE PLENUM RATED. MECHANICAL CONTRACTOR SHALL FURNISH ALL AIR PIPING
AND TUBING REQUIRED FOR AUTOMATIC CONTROLS SYSTEMS.
8. PROVIDE SUPPLEMENTAL STIFFENING AND SUPPORTS TO DUCTS AND APPARATUS CASINGS TO PREVENT
DRUMMING, SAGGING AND TO PROVIDE A STRUCTURALLY SOUND ASSEMBLY.
GENERAL AUTOMATIC TEMPERATURE CONTROL
NOTES:
VAV BOX
FAN COIL UNIT
LINEAR DIFFUSER
BLOWER COIL
FAN POWERED BOX
FCU
X
VAV
X
BC
X
FPB
X
CHS-P
CHR-P
CHILLED WATER SUPPLY - PRIMARY LOOP
CHILLED WATER RETURN - PRIMARY LOOP
N
(SBU)
SENSITIVE BUT UNCLASSIFIED
PROPERTY OF THE UNITED
STATES GOVERNMENT, COPYING,
DISSEMINATION, OR
DISTRIBUTION OF THIS
DOCUMENT TO UNAUTHORIZED
RECIPIENTS IS PROHIBITED.
Do not Remove this Notice.
Properly Destroy or return documents when no longer needed.
WEST EAST
© 2015 Erdy McHenry Architecture, LLC
DRAWN BY:
Erdy McHenry Architecture, LLC 915 North Orianna Street Philadelphia, Pennsylvania 19123 ph: 215.925.7000 fax: 215.925.1990 web: http://www.em-arc.com
Architect: SCOTT A. ERDY, AIA
DAVID S. MCHENRY, AIA
emArchitecture
SCALE:
PROJECT NO:
DATE:
SHEET NUMBER:
P lo tte d:
KEY PLAN
As indicated
M001
MECHANICAL LEGEND
1158.00/SCR-2015216.00DLA
05-06-16
600 Arch Street
Philadelphia, PA 19107
GREEN FEDERAL BUILDING
CONSOLIDATION
Program + Strategy Consultant Studio Hillier 190 Witherspoon Street Princeton, NJ 08542
Greenman - Pedersen, Inc. (GPI) 50 Glenmaura National Blvd.
Suite 102 Scranton, PA 18505
Cerami & Associates 404 Fifth Avenue New York, NY 10018
TCT Cost Consultants, LLC 1090 Vermont Avenue NW Suite 230 Washington, DC 20005
Weidlinger Associates, INC 1825 K Street Avenue NW Suite 350 Washington, DC 20006
Antis Veterans Engineering adn Technical Services 2074 Cobblestone Lane Suite 850 Reston, VA 20191
Structural Engineer
MEP Engineer
Acoustical Consultant
Cost Specialist
Security + Blast
Praxis Building Solutions, LLC 2401 Walnut Street Suite 102 Philadelphia, PA 19103
Green Building Consultant
Beam, Ltd 428 West Waverly Road Glenside, PA 19038
Lighting Consultant
GSA Project Data William J. Green Federal Building GSA Project #: VPA00027 GSA Building #: PA0277 GSA Contract #: GS-03P-14-AZ-C-0020 GSA Solicitation #: GS-03P-15-AZ-C-1020
Core & Shell Package 05-06-16
Revision Number Drawing Issue Date
1 Issued for Addendum 02 06-10-16
| Sheets |
| M001 - MECHANICAL LEGEND |
File details come from the government source that posted it. Updated .