Amendment_0002.pdf

PDF 5 MB Posted

Attached to
Restack of the William J. Green Federal Building
Solicitation number
GS-03-P-16-AZ-C-7004
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Amendment_0007.pdf PDF
Ta4.26_-_02_Enlarged_Plans_-_Conference_Room_05.pdf PDF
Amendment_0006.pdf PDF
Flow_Test.pdf PDF
23_0900_INSTRUMENTATION_AND_CONTROL_FOR_HVAC._-_Add__2.pdf PDF
S4-02_-_ENLARGED_PARTIAL_PLANS.pdf PDF
Amendment_0005.pdf PDF
Specification_-_Table_of_Contents.pdf PDF
10_2240_Folding_Glass-Panel_Partitions.pdf PDF
MS-502.pdf PDF
09_5113_acoustical_panel_ceilings.pdf PDF
23_2113_HYDRONIC_PIPING_-_Add__2.pdf PDF
MP-405.pdf PDF
01_1030_TELECOMMUNICATIONS_SYSTEMS_OVERVIEW.pdf PDF
08_8713_Window_Film_Type_01.pdf PDF
01_ARCHITECTURAL_-_Addendum_02.pdf PDF
Addendum_No_02_-_Cover_Sheet.pdf PDF
09_3033_stone_tiling.pdf PDF
10_1423_Panel_Signage.pdf PDF
MD-124.pdf PDF
MP-103_2.pdf PDF
M-001.pdf PDF
09_6813_tile_carpeting.pdf PDF
S3-01_-_TYPICAL_DETAILS.pdf PDF
MP-104.pdf PDF
MS-501.pdf PDF
10_2226_Operable_Partitions.pdf PDF
MD-123.pdf PDF
08_8713_Window_Film_Type_02.pdf PDF
09_3000_ceramic_tile.pdf PDF
10_2241_Vertically_Folding_Panel_Doors.pdf PDF
MD103.pdf PDF
MD501.pdf PDF
Pre-Alteration_Asbestos_Assessment.pdf PDF
Specification_-_23_0529_HANGERS_AND_SUPPORTS_FOR_HVAC_PIPING_AND_EQUIPMENT-Addendum__1.pdf PDF
Ty6-00.pdf PDF
Specification_-_09_6513_RESILIENT_BASE_AND_ACCESSORIES.pdf PDF
Specification_-_01_1000_SUMMARY.pdf PDF
MH104.pdf PDF
Amendment_0004.pdf PDF
Construction_Sequencing_Diagrams.pdf PDF
Addendum_No_01_-_Cover_Sheet.pdf PDF
01_ARCHITECTURAL_-_Addendum_01.pdf PDF
MH103.pdf PDF
Specification_-_01_2400_OPTIONS.pdf PDF
Specification_-_Table_of_Contents.pdf PDF
Specification_-_09_5113_ACOUSTICAL_PANEL_CEILINGS.pdf PDF
MD104.pdf PDF
Amendment_0003.pdf PDF
02_STRUCTURAL.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Restack of the William J. Green Federal Building Page 02

GS-03-P-16-AZ-C-7004

Amendment 0002

The subject solicitation is hereby amended to incorporate the following changes:

1. Davis Bacon Wage Rate PA160005, dated 5/27/2016, is hereby incorporated into the solicitation. Offerors shall use the most updated wage rate when preparing proposals.

2. The “Pre-Proposal Conference” sign-in sheet, agenda and small business presentation are attached for the reference of all offerors.

3. All references to “Option 003: Sound Masking” are hereby deleted from the bidding documents. Offerors shall not include costs for “Option 003: Sound Masking” in their proposal.

4. As a result of the above, the bid sheet has been revised. The attached revised bid sheet is incorporated into the subject solicitation.

5. Specification “Section 012400 – Options” has been revised. The attached section replaces section 012400 that was included in the original bidding documents. The attached revised specification “Section 012400 – OPTIONS” is incorporated into the subject solicitation.

All other terms and conditions remain unchanged.

RFP for GS-03-P-16-AZ-C-7004 Restack of the William J. Green Federal Building

Standard Form (SF) 1442, Pricing Schedule

CMc Base Contract:

(1) CMc Design Phase Services: $_________________________

CMc Construction Option 001: Construction Phase 1:

(2) Target Estimated Cost of Work (ECW): $_________________________

(3) CMc Contingency Allowance (Line 2 x 3%): $_________________________

(4) Fee: $_________________________

(5) Option 001 Guaranteed Maximum Price (GMP) (2+3+4): $_________________________

CMc Construction Option 002: Construction Phase 2:

(6) Target Estimated Cost of Work (ECW): $_________________________

(7) CMc Contingency Allowance (Line 6 x 3%): $_________________________

(8) Fee: $_________________________

(9) Option 002 Guaranteed Maximum Price (GMP) (6+7+8): $_________________________

(10) Total Evaluated Price (Lines 1 + 5 + 9) $_________________________

Green Federal Building Consolidation Project 600 Arch Street

Philadelphia, Pennsylvania

GSA # GS-03P-14-AZ-C-0020

OPTIONS

PROPERTY OF THE U.S. GOVERNMENT - FOR OFFICIAL USE ONLY

Do not remove this notice - Properly destroy documents when no longer needed

012400 - 1

27 MAY 2016

SECTION 012400 – OPTIONS

PART 1 - GENERAL

See FAR 2.101, GSAM clauses and Contract Agreement for more information.

1.1 SUMMARY

A. “Option” means a unilateral right in a contract by which, for a specified time, the Government may elect to purchase additional scope of work, products, materials, equipment, systems or installation methods described in the Contract Documents.

B. The amount for an option is the total adjustment from the Base Bid to incorporate the option work into the project.

C. Option work shall include miscellaneous devices, accessory objects and similar items incidental to or required for a complete installation, whether or not mentioned as part of the option description.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 SCHEDULE OF OPTIONS

NOTE: THIS SECTION HAS BEEN SIGNIFICANTLY EDITED TO REMOVE THE ORIGINAL

OPTIONS FOR A SOUND MASKING SYSTEM (WHICH HAS BEEN DELETED FROM THE

CORE & SHELL SCOPE OF WORK).

Option No. 001: CMc Construction Phase 1

When funds become available Government may elect, at its sole discretion, to award Option No.

001. Should this option not be elected, CMc shall not be entitled to any compensation or damages under Phase 1 of the work.

Work under this Option shall include all scope as indicated elsewhere in these documents and Allowance Item No. 01 through Allowance Item No. 03 as described in Specification Section 01 2100 Allowances.

Green Federal Building Consolidation Project 600 Arch Street

Philadelphia, Pennsylvania

GSA # GS-03P-14-AZ-C-0020

OPTIONS

PROPERTY OF THE U.S. GOVERNMENT - FOR OFFICIAL USE ONLY

Do not remove this notice - Properly destroy documents when no longer needed

012400 - 2

27 MAY 2016

Option No. 002: CMc Construction Phase 2

When funds become available Government may elect, at its sole discretion, to award Option No.

002. Should this option not be elected, CMc shall not be entitled to any compensation or damages under Phase 2 of the work.

Work under this Option shall include all scope as indicated elsewhere in these documents and Allowance Item No. 04 through Allowance Item No. 09 as described in Specification Section 01 2100 Allowances.

END OF SECTION 012400

SF 30
Amendment 0002 back up
Amendment 2 page 2
Davis Bacon Wage Dated 5.27.txt
Pre Bid Agenda
Sign in Sheet - Restack Prebid - 5.25.16
Small Business Slides
Bid Sheet - Restack - Revised 5.31.16
01 2400_Options

File details come from the government source that posted it. Updated .