Family of Advanced
Beyond Line-of-Sight
Terminals (FAB-T)
Competitive Acquisition
Industry Day
11 JAN 2012
ESC/HNT
Electronic Systems Center
Industry Day Schedule
Day 1
1000 – 1015 Kickoff
1015 – 1030 Organizational Conflict of Interest (OCI)
1030 – 1045 Opening Remarks from Col DeLaPena
1045 – 1130 Industry Briefing
1130 – 1200 Question and Answer Session
1200 – 1300 Lunch
1300 – 1730 One-on-one sessions
Day 2
0800 – 1230 One-on-one sessions
Administrative Information
• Shut off all electronic devices
• Restrooms are located outside of the auditorium to the left – no escorts required
• Escorts are required for any other movement outside of this room
• Emergency exit is located in the M Lobby
• Forms are available to submit questions for the Q&A session
Companies Represented at Industry Day
Raytheon
Xicom
Boeing
ViaSat
DRS ICAS, LLC
Harris Corp.
MITEQ
Rockwell Collins
General Dynamics C4S
L-3 Communications
Sechan Electronics
Cubic Defense Applications
Millitech, Inc
Cobham Electronic Systems
Lockheed Martin
Northrop Grumman
Disclaimer
• All acquisition strategy information is draft and subject to change pending receipt of the required approvals, including approval on the method of acquisition (full and open, small business set-aside, 8(a) program, etc)
• This briefing does not constitute an invitation for bid or request for proposal and is not to be construed as a commitment by the Government
Special Presentation
ESC/JA Presentation on Organizational Conflict of Interest
Acquisition Objective
• Restructures the program to deliver Warfighters’ highest priority terminals: E-4, E-6, and Ground
Command Post Terminals with Presidential &
National Voice Conferencing (PNVC)
• Defers the force element requirements for the B-2, B-52, and RC-135 airborne and ground terminals
– Force element requirements to be addressed in a future acquisition
• Initial terminal deliveries no later than the end of
FY15 to meet Warfighter needs
Presidential & National Voice Conferencing (PNVC) Overview
• Description
– PNVC is the AEHF (XDR) worldwide, secure, survivable voice conferencing capability for the President and national senior leaders
– Capability is achieved through the development and integration of PNVC Baseband equipment with the Digital
Red Switch Network (DRSN) and AEHF systems
– DISA’s role is to acquire the baseband equipment and facilitate
• Warfighter Benefits
– Provides worldwide survivable voice conferencing
– Reduces conferencing time delays
– Improves voice quality
– Adds conference management
Business Opportunity
• Competitive award of up two (2) fixed price contracts for development/production in FY12 based on
Offerors’ proposals and demonstrations of existing
HW/SW
• Contract values will be capped at $80M for a Firm
Fixed Price (FFP) initial ten month development period
• A down-select decision will occur at month ten to a single contractor for the remainder of development effort and production
RFP Key Features (1 of 2)
• Technical requirement document splits requirements into two blocks
− Block 1 design focused on high priority (PNVC) mission
− Block 2 remainder of CPT capabilities
• An extended source selection will be conducted in two phases and will include demonstrations for risk assessment at both the initial award and down-select
• Proposals will describe a detailed schedule (e.g., SRR, PDR, CDR, TRR) and event information for the entire CPT development and production
• Proposal will include a contractor defined development event from their Integrated Master Plan (IMP) nine months after award
RFP Key Features (2 of 2)
• Contractor(s) will be provided an opportunity to update their proposals and prices for the remainder of development effort and production for the down-select
• Special Clauses will be used to define down-select, downward adjustment and contract incentives
(positive and negative)
• Full Data rights will be sought to enable the
Government to sustain FAB-T system and reuse to support the future force element portion of the program
Contract Structure
• Development Period of Performance 39 months (FY12-14)
– FFP CLIN initial development of CPT w/PNVC (10 months to down-select)
– FPIF Option CLIN for completion of CPT w/PNVC (14 months)
– FPIF Option CLIN for full capability CPT to completion (15 months)
• Production six (6) annual buys
– FPIF Option CLIN LRIP FY14
– FPIF Option CLIN LRIP FY15
– FFP Option CLINs FRP FY16-19
Production Quantities
• Command Post Terminals
– Airborne Terminals
• E-4
• E-6
– Ground Terminals
• Fixed
• Transportable
Note: Force element terminal requirements (Qty 132) to be addressed in a future acquisition
Terminals Quantity
E-4 4
E-6 17
Ground Fixed 41
Ground
Transportable
Total: 84
Source Selection
• Draft Evaluation Factors for Initial Contract Award(s)
– Evaluation Factors
– Demonstration
– Past Performance Relevancy
• Draft Evaluation Factors for Down-select
– Down-select Decision
Draft Evaluation Factors for
Contract Award(s)
• Section M: Initial Contract Award
• Evaluation Factors and Subfactors:
− Factor 1: Technical Capability
− Sub-factor 1: Architecture, System Design and Performance
− Sub-factor 2: Integrated Processes
− Sub-factor 3: Small Business (Acceptable/Unacceptable)
− Factor 2: Past Performance
− Factor 3: Cost/Price
• Relative Importance of Factors − Technical Capability is approximately equal to Cost/Price. All evaluation factors, when combined are significantly more important than Cost/Price, however Cost/Price will substantially contribute to the selection decision
Draft Demonstration (Initial Award)
• A one day demonstration to be conducted at the
Offeror’s facility with the Offeror’s equipment
• The demonstration will address the maturity and the performance of the Offeror’s proposed technical solution as well as the Offeror’s overall ability to deliver a sufficiently mature and integrated solution within the proposed contract schedule
• The demonstration will be used as a means to assess the risk associated with the contents of the written proposal
• No GFE is planned to be used for the demonstration
Draft Past Performance Relevancy Criteria (1 of 2)
• Developing communication systems with layered communication architectures
• Developing EHF satellite communications systems or segments
• Developing, producing, and sustaining multi-band satellite terminals where the degree of complexity is similar to that of the FAB-T
• Development and platform integration of terrestrial and/or airborne satellite terminals
• Developing airborne terminals operating with narrow beam-width satellite tracking antennas
Draft Past Performance Relevancy Criteria (2 of 2)
• Demonstrating understanding of strategic Nuclear
Command and Control Extremely Sensitive
Information, formally known as Single Integrated
Operations Plan (SIOP), radio communications requirements
• Demonstrating an understanding of security certification of satellite communication systems including cryptographic devices
• Large scale military software development
• Development and production of HEMP and nuclear hardened components
Draft Evaluation Factors for Single Award
• Section H Clause: Down-select
• Evaluation Factors and Subfactors:
− Factor 1: Technical Capability
− Sub-factor 1: Architecture, System Design and Performance
− Sub-factor 2: Integrated Processes
− Factor 2: Cost/Price
• Relative Importance of Factors − Technical Capability and Cost/Price will be evaluated and they are approximately equal.
Down-select Decision
• Down-select criteria will consist of an assessment of the contractors’ revised cost and price for the remainder of the development and production and technical performance from the nine (9) month IMP event and demonstration
FAB-T Schedule
FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
Competitive
Development &
Production
Proposal Receipt
MDA Decision & Competitive RFP release
Source Selection
Requirements defined, Acq Strategy & SSP signed
FAB-T w/PNVC
MS-C
First delivery CV/SV
Flight test IOT&E
Production
FCA/PCA
Delivery of Command
Post with PNVC in FY15
RFP Release to Meet FY12
Contract Award
Dual Award
TT&C Option
Development to a
9 month IMP event
Exercise Option to Complete
Notional start of AWT
Development
FAB-T w/PNVC
Down-Select Award based on IMP event results, Demo
& Cost/Price update
Development to a
9 month IMP event
Contract Award Schedule
Industry Day #2 Jan 12
Final RFP release Feb 12
Proposal Receipt / Demonstration Mar 12
Source Selection Mar-Aug 12
Award(s) Aug 12