CLIN structure V26 - 2.pdf

PDF 549 KB Posted

Attached to
Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Alternate Source
Solicitation number
FA8307-12-R-0003
Issued by

About this file

Draft CLIN Structure

View the file

Other files

File Type Posted
NOCA 04 Sept 12.pdf PDF
RFP Letter 4 v1.pdf PDF
Atch 13 - Cost Formats 20120602.xlsx XLSX spreadsheet
RFP Letter 3 v2.pdf PDF
RFP Letter 2 v1.pdf PDF
GTRD 14 May Update Errata.docx DOCX document
1 RFP 20120424 Section J.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120424.xlsx XLSX spreadsheet
Atch 13 - Cost Formats 20120416v35.xlsx XLSX spreadsheet
RFP Letter v4.pdf PDF
1 RFP 20120424 No Attachments.pdf PDF
DRAFT RFP No Attachments.pdf PDF
DRAFT RFP Section J.pdf PDF
1 RFP No Attachments and Exhibits.pdf PDF
1 RFP Section J.pdf PDF
20120323_FABT_AltSource_Revised_and_New_Docs_Available_v2.pdf PDF
Revised_GTRD_20120224_FABT_AltSouce_Special_Handling.pdf PDF
Draft RFP 3_9_12 v30 Sections A-M.pdf PDF
Draft RFP 3_9_12 v30 Exhibits and Attachments.pdf PDF
FAB_T_Industry_Day_Brief_8MAR2012_FEDBizOpps.pdf PDF
NOTICE OF CONTRACT ACTION.pdf PDF
ESC_OCI_PolicyBrief_IDB2008.ppt PPT presentation
Atch 13 - Cost Formats 20120228 v23.pdf PDF
SECTION L 20120301 cdl.pdf PDF
FAB-T RFI for 8 March 2012 Industry Day Jan 2012 V1.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120216 v3.pdf PDF
Exhibit E - Data Requirements List for TM86-01 20120223 v36.pdf PDF
Exhibit A - Instructions for Data Requirements List 20120223 v36.pdf PDF
Atch 14 - Cost and Software Data Reporting Plan.pdf PDF
Exhibit C - Data Requirements List for LRIP 20120223 v36.pdf PDF
Exhibit D - Data Requirements List for Production 20120223 v36.pdf PDF
Exhibit F - Data Requirements List for PDAL - full 20120223 v36.pdf PDF
Exhibit B - Data Requirements List for EMD 20120223 v36.pdf PDF
Atch 3 - Entrance and Exit Criteria for SRR PDR CDR 20120223.pdf PDF
Atch 1 - Statement of Work 20120223 v36.pdf PDF
Exhibit G - Data Requirements List for PDAL - sust 20120223 v36.pdf PDF
Atch 4 - Preliminary WBS.pdf PDF
Atch 13 - Cost Formats 20120223 v23.pdf PDF
Atch 9 - Terminal Delivery Schedule 20120223 v4.pdf PDF
Gov_Proposed_WBS.pdf PDF
FAB_T_Corporate_NDA.pdf PDF
SECTION_M.pdf PDF
DD Form 254.pdf PDF
SECTION_L.pdf PDF
GTRD_and_Other_Documents_Requiring_Special_Handling.pdf PDF
FA8307_12_R_0003.pdf PDF
FAB_T_Individual_NDA.pdf PDF
FAB_T_RFI_for_Industry_Day.pdf PDF
FAB_T_Industry_Day_Brief_Jan_12.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

CLIN Description Contract Type Reference PoP

General Instructions for CDRLs Exhibit A

0001 FAB-T CPT W/PNVC; INITIAL ENGINEERING MANUFACTURING AND DEVELOPMENT (EMD) FFP 10 Mo

0002 DATA FOR CLIN 0001, AND IF EXERCISED CLINS 0003, 0004, 0005 & 0020 FFP (NSP) Exhibit B

0003 Option FAB-T CPT W/PNVC ONLY EMD; IMP EVENT 1 TO IMP EVENT 2 FFP 2 Mo

0004 Option FAB-T CPT W/PNVC ONLY EMD; IMP EVENT 2 TO IMP EVENT 3 FFP 2 Mo

0005 Option FAB-T CPT W/PNVC ONLY EMD; CDR TO PNVC EMD COMPLETION FFP contractor proposed

0006 Option FLIGHT TEST AIRCRAFT FFP contractor proposed

0007 Option INSTALLATION OF ENGINEERING DESIGN MODELS (EDM) CPFF contractor proposed

0008 Option DATA RIGHTS FFP contractor proposed

0009 Option TECHNICAL MANUALS FFP Exhibit E 48 Mo

0010 Option TRAINING CLASSES FFP 60 Mo

0011 Option PREOPERATIONAL SUPPORT CPFF 24 Mo

0012 Option AIRBORNE PLATFORM INTEGRATION SUPPORT CPFF 36 Mo

0013 Option IOT&E SUPPORT CPFF contractor proposed

0014 Option TECHNICAL DATA PACKAGE (REPROCUREMENT) FFP Exhibit F contractor proposed

0015 Option TECHNICAL DATA PACKAGE (SUSTAINMENT) FFP Exhibit G contractor proposed

Q1FY14 to

Q1FY16

0020 Option TT&C EMD FFP contractor proposed

0100 Option LOW RATE INITIAL PRODUCTION 1 FFP 1st terminal, 4Q FY15

0101 Option GROUND INSTALLATION CPFF contractor proposed

0102 DATA FOR CLINS 0100 & 0200 (IF EXERCISED) FFP (NSP) Exhibit C

0103 Option GROUND SITE SURVEY FFP contractor proposed

0104 Reserved SUPPORT EQUIPMENT FFP based on SERD

0105 Option SPARES FFP contractor proposed

0106 Option IOT&E FLIGHT TEST AIRCRAFT FFP 12 Mo

0200 Option LOW RATE INITIAL PRODUCITON 2 FFP contractor proposed

0201 Option GROUND INSTALLATION CPFF contractor proposed

0300 Option FULL RATE PRODUCTION 1 FFP contractor proposed

0301 Option GROUND INSTALLATION CPFF contractor proposed

0302 Option DATA FOR CLINS 0300, 0400, 0500 & 0600 (IF EXERCISED) FFP (NSP) Exhibit D

0400 Option FULL RATE PRODUCTION 2 FFP contractor proposed

0401 Option GROUND INSTALLATION CPFF contractor proposed

0500 Option FULL RATE PRODUCTION 3 FFP contractor proposed

0501 Option GROUND INSTALLATION CPFF contractor proposed

0600 Option FULL RATE PRODUCTION 4 FFP contractor proposed

0601 Option GROUND INSTALLATION CPFF contractor proposed

FY 15 1001 Option ICS - HARDWARE MAINTENANCE CPFF 12 Mo

FY 16 1002 Option ICS - HARDWARE MAINTENANCE CPFF 12 Mo

FY 17 1003 Option ICS - HARDWARE MAINTENANCE CPFF 12 Mo

FY 18 1004 Option ICS - HARDWARE MAINTENANCE CPFF 12 Mo

FY 16 1101 Option ICS - SOFTWARE MAINTENANCE CPFF 12 Mo

FY 17 1102 Option ICS - SOFTWARE MAINTENANCE CPFF 12 Mo

FY 18 1103 Option ICS - SOFTWARE MAINTENANCE CPFF 12 Mo

FY 19 1104 Option ICS - SOFTWARE MAINTENANCE CPFF 12 Mo

FY19

Prod'n

Q3FY12 to

Q2FY14

FY14

Prod'n

FY15

Prod'n

FY16

Prod'n

FY17

Prod'n

FY18

Prod'n