DRAFT RFP No Attachments.pdf

PDF 451 KB Posted

Attached to
Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Alternate Source
Solicitation number
FA8307-12-R-0003
Issued by

About this file

DRAFT RFP Document without Section J attachments

View the file

Other files

File Type Posted
NOCA 04 Sept 12.pdf PDF
RFP Letter 4 v1.pdf PDF
Atch 13 - Cost Formats 20120602.xlsx XLSX spreadsheet
RFP Letter 3 v2.pdf PDF
RFP Letter 2 v1.pdf PDF
GTRD 14 May Update Errata.docx DOCX document
1 RFP 20120424 Section J.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120424.xlsx XLSX spreadsheet
Atch 13 - Cost Formats 20120416v35.xlsx XLSX spreadsheet
RFP Letter v4.pdf PDF
1 RFP 20120424 No Attachments.pdf PDF
DRAFT RFP Section J.pdf PDF
1 RFP No Attachments and Exhibits.pdf PDF
1 RFP Section J.pdf PDF
20120323_FABT_AltSource_Revised_and_New_Docs_Available_v2.pdf PDF
Revised_GTRD_20120224_FABT_AltSouce_Special_Handling.pdf PDF
Draft RFP 3_9_12 v30 Sections A-M.pdf PDF
Draft RFP 3_9_12 v30 Exhibits and Attachments.pdf PDF
FAB_T_Industry_Day_Brief_8MAR2012_FEDBizOpps.pdf PDF
NOTICE OF CONTRACT ACTION.pdf PDF
ESC_OCI_PolicyBrief_IDB2008.ppt PPT presentation
Atch 13 - Cost Formats 20120228 v23.pdf PDF
SECTION L 20120301 cdl.pdf PDF
FAB-T RFI for 8 March 2012 Industry Day Jan 2012 V1.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120216 v3.pdf PDF
Exhibit E - Data Requirements List for TM86-01 20120223 v36.pdf PDF
Exhibit A - Instructions for Data Requirements List 20120223 v36.pdf PDF
Atch 14 - Cost and Software Data Reporting Plan.pdf PDF
Exhibit C - Data Requirements List for LRIP 20120223 v36.pdf PDF
Exhibit D - Data Requirements List for Production 20120223 v36.pdf PDF
CLIN structure V26 - 2.pdf PDF
Exhibit F - Data Requirements List for PDAL - full 20120223 v36.pdf PDF
Exhibit B - Data Requirements List for EMD 20120223 v36.pdf PDF
Atch 3 - Entrance and Exit Criteria for SRR PDR CDR 20120223.pdf PDF
Atch 1 - Statement of Work 20120223 v36.pdf PDF
Exhibit G - Data Requirements List for PDAL - sust 20120223 v36.pdf PDF
Atch 4 - Preliminary WBS.pdf PDF
Atch 13 - Cost Formats 20120223 v23.pdf PDF
Atch 9 - Terminal Delivery Schedule 20120223 v4.pdf PDF
Gov_Proposed_WBS.pdf PDF
FAB_T_Corporate_NDA.pdf PDF
SECTION_M.pdf PDF
DD Form 254.pdf PDF
SECTION_L.pdf PDF
GTRD_and_Other_Documents_Requiring_Special_Handling.pdf PDF
FA8307_12_R_0003.pdf PDF
FAB_T_Individual_NDA.pdf PDF
FAB_T_RFI_for_Industry_Day.pdf PDF
FAB_T_Industry_Day_Brief_Jan_12.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

10 Apr 12

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING

DO-A7

PAGE OF PAGES

1 52

2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

5. DATE ISSUED

6. REQUISITION/PURCHASE NO.

FA8307-12-R-0003

7. ISSUED BY ESC/HNSK CODE FA8307 8. ADDRESS OFFER TO (If other than Item 7)

AIR FORCE MATERIEL COMMAND, USAF

ELECTRONIC SYSTEMS CENTER

5 EGLIN STREET

HANSCOM AFB, MA 01731-2100

CHRISTOPHER D. LINSKEY 781-271-1305

CHRISTOPHER.LINSKEY@HANSCOM.AF.MIL

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

SOLICITATION

9.

10. FOR

INFORMATION

CALL:

A. NAME

TIMOTHY M. FRANK

B. TELEPHONE (Include area code)

(NO COLLECT CALLS)

271-7188

C. E-MAIL ADDRESS

timothy.frank@hanscom.af.mil

11. TABLE OF CONTENTS

() SEC. DESCRIPTION PAGE(S) () SEC DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES 43

B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.

C DESCRIPTION/SPECS./WORK STATEMENT 23 J LIST OF ATTACHMENTS 50

D PACKAGING AND MARKING 29 PART IV - REPRESENTATIONS AND INSTRUCTIONS

E INSPECTION AND ACCEPTANCE 30 K REPRESENTATIONS, CERTIFICATIONS, K - 1

F DELIVERIES OR PERFORMANCE 33 AND OTHER STATEMENTS OF OFFERORS

G CONTRACT ADMINISTRATION DATA 35 L INSTRS, CONDS, AND NOTICES TO OFFERORS L - 1

H SPECIAL CONTRACT REQUIREMENTS 36 M EVALUATION FACTORS FOR AWARD M - 1

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____ ____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS

20 CALENDAR DAYS

30 CALENDAR DAYS

CALENDAR DAYS

14. ACKNOWLEDGEMENTS OF AMENDMENTS

(The offeror acknowledges receipt of amend-

AMENDMENT NO. DATE AMENDMENT NO. DATE

ments to the SOLICITATION for offerors and related documents numbered and dated:

15A. NAME

AND

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

ADDRESS

OF

OFFEROR

15B. TELEPHONE NO. (Include area code)

15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-

TION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION IS UNUSABLE Prescribed by GSA ConWrite Version 6.13.1 FAR (48 CFR) 53.21(c) Created 10 Apr 2012 8:53 AM

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION B FA8307-12-R-0003

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0001 1 __________ Lot __________ Noun: FAB-T CPT W/PNVC; ENGINEERING MANUFACTURING

AND DEVELOPMENT (EMD)

NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. The contractor shall start the design, development and test efforts for the Family of Advanced Beyond Line-of-Sight Terminal (FAB-T) Command Post Terminal (CPT) with Presidential National Voice Conferencing (PNVC). This CLIN also includes contractor proposed IMP event 1 at month 9 for test/demonstration of capability in accordance with the documents set forth in Section C.

B. Period of Performance: 10 months from contract award.

C. Inspection and Acceptance: After successful completion of IMP event 1, final inspection and acceptance will be evidenced by Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.

D. This CLIN will be incrementally funded at time of award.

E.

Target Cost: Contractor Proposed_________ Target Profit: Contractor Proposed_________ Target Price: Contractor Proposed_________ Share Ratio:

Under-Target Share Ratio: 100/0 Over-Target Share Ratio: 0/100 Ceiling: Contractor Proposed (NTE $70,000,000.00)_________

0002 0 __________ Noun: DATA FOR CLIN 0001, AND DEVELOPMENT CLINS (IF

EXERCISED)

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. Data for CLIN 0001, and if options are exercised CLIN 0003, 0004, 0005, 0007, 0013 and 0020 in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit B.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0001, and If the options are exercised, prices will be included in CLINs 0003, 0004, 0005, 0007, 0013 and 0020 respective to the data reported on each CLIN.

C. Points of inspection and acceptance (Destination) will be IAW applicable CDRL.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0003 OPTION CLIN (supply) __________

Noun: FAB-T CPT W/PNVC EMD; COMPLETION OF CLIN 0001 TO

IMP EVENT 2

NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall continue remaining design, development, and test efforts for the FAB-T CPT W/PNVC from CLIN 0001 completion through the completion of the contractor proposed IMP event 2 in accordance with the documents set forth in Section C.

B. Period of Performance: 2 months from option exercise.

C. Inspection and Acceptance: After successful completion of IMP event 2 and delivery of CDRL data, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.

D. This CLIN will be incrementally funded at option exercise.

E. Target Cost: Contractor Proposed_________ Target Profit: Contractor Proposed_________ Target Price: Contractor Proposed_________ Share Ratio:

Under-Target Share Ratio: 100/0

0004 OPTION CLIN (supply) __________

Noun: FAB-T CPT W/PNVC EMD; IMP EVENT 2 TO IMP EVENT 3 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall continue design, development, and test efforts for the FAB-T CPT from CLIN 0003 completion through completion of contractor proposed IMP event 3 in accordance with the documents set forth in Section C.

B. Period of Performance: 2 months from option exercise.

C. Inspection and Acceptance: After successful completion of IMP event 3 and delivery of CDRL data, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Sections C.

D. This CLIN will be incrementally funded at option exercise.

E. Target Cost: Contractor Proposed_________ Target Profit: Contractor Proposed_________ Target Price: Contractor Proposed_________ Share Ratio:

Under-Target Share Ratio: 100/0

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0005 OPTION CLIN (supply) Noun: FAB-T CPT W/PNVC EMD; IMP 3 TO PNVC EMD

COMPLETION

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall finish the remaining design, development, and test efforts for the FAB-T CPT from CLIN 0004 completion through PNVC EMD completion, including 3 site surveys for ground EDMs and the delivery of 3 air, 2 ground fixed and 1 ground transportable EDMs in accordance with the documents set forth in Section C.

B. Period of Performance: contractor proposed C. Inspection and Acceptance: After successful completion of all development efforts, final inspection and acceptance will be evidenced by a Requisition and Invoice/Shipping Document (DD Form 1149) for the 6 EDMs in accordance with the terms and conditions of the documents referenced in Section C.

D. This CLIN will be incrementally funded at option exercise.

E. Total Price: $__________

0006 OPTION CLIN (service) Noun: DT FLIGHT TEST AIRCRAFT Descriptive Data:

A. If this option is exercised the contractor shall provide use of an aircraft to support both contractor and Government required flight testing. The contractor shall perform all necessary aircraft modifications to support terminal installation and demonstrate terminal capability.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After successful A/C and FLT tests, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for Government flight tests are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Pricing for the flight test aircraft shall be developed for a Firm Fixed Price environment. Separate SubCLINs may be awarded for Mod / De-mod of the aircraft, contractor flights, and/or Government flights in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0007 OPTION CLIN (service) Noun: INSTALLATION OF ENGINEERING DESIGN MODELS (EDM) Descriptive Data:

A. If this option is exercised the contractor shall install 3 ground EDMs in support of CLIN 0005 in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each ground EDM has been installed, final inspection and acceptance will be evidenced by a Requisition and Invoice/Shipping Document (DD Form 1149) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for EDM installations shall be developed for a CPFF environment. This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________ Fixed Fee: $__________ Total: $__________

0008 OPTION CLIN (supply) Noun: DATA RIGHTS NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised, the Government may purchase technical data, software and firmware deliverables, to include required development tools, the contractor is willing or able to offer, with the goal to obtain Government Purpose Data Rights consistent with DFARS Part 227. This does not negate the Government's rights under DFARS Part 227 to technical data and/or computer software and computer software documentation developed under the contract exclusively with Government funds or mixed funding.

B. The contractor is requested to provide available pricing for the purchase of Government Purpose Rights for data items listed in Attachment 8, FAB-T Data Rights Assertions List. If this option is exercised the Government may use this option to purchase any or all of the items listed in Attachment 8. Total price for this CLIN will be the sum of all items priced as Government Purpose Rights. SubCLINs may be established for the purchase of a variable amount of data rights at the prices listed in Attachment 8.

C. Government may exercise this option any time during the contract period of performance.

D. Delivery Date: Contractor Proposed E. Inspection and Acceptance: After successful delivery of data rights, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

F. Each SubCLIN will be fully funded.

G. Total Price: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0009 OPTION CLIN (supply) __________

Noun: TECHNICAL MANUALS NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall provide Technical Manuals in accordance with Contract Data Requirements List, DD Form 1423, Exhibit B, CDRL TM-8601.

B. Delivery Date: Contractor Proposed.

C. Inspection and Acceptance: After successful delivery of all technical manuals, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

0010 OPTION CLIN (service) Noun: TRAINING CLASSES Descriptive Data:

A. If this option is exercised the contractor shall conduct operator and maintainer type 1 training classes. If the option has been exercised before training materials are scheduled to be completed, the contractor shall use the training materials that have been developed up to the date of training class to be conducted in accordance with the documents set forth in Section C.

B. Period of Performance: 60 months from option exercise.

C. Inspection and Acceptance: After completion of each course, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for training classes are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Pricing for training classes shall be developed for a Firm Fixed Price environment. Separate SubCLINs will be awarded for each training class in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

0011 OPTION CLIN (service) Noun: PREOPERATIONAL SUPPORT FOR EDMS Descriptive Data:

A. The contractor shall provide the necessary labor and parts to support hardware maintenance for EDMs in accordance with the documents set forth in Section C.

B. Period of Performance: 24 months from option exercise

C. Inspection and Acceptance: After each repair has been completed, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for Preoperational shall be developed for a CPFF environment. This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0012 OPTION CLIN (service) Noun: AIRBORNE PLATFORM INTEGRATION Descriptive Data:

A. If this option is exercised the contractor shall provide technical support and equipment to airborne platform users during the contractors design, build and terminal integration test phases. The contractor shall also provide technical support to facilitate integration, installation and qualification in accordance with the documents set forth in Section C.

B. Period of Performance: 36 months from option exercise

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for Airborne Platform Integration shall be developed for a CPFF environment.

This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________

0013 OPTION CLIN (service) Noun: IOT&E SUPPORT Descriptive Data:

A. If this option is exercised the contractor shall provide technical and maintenance support for Initial Operational Test and Evaluation to include review of and performance of a dry run with the Government provided IOT&E procedures in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After IOT&E is completed as evidenced by acceptance of final reports resulting from Exhibit C CDRLs, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for IOT&E Support shall be developed for a CPFF environment. This CLIN will be incermentally funded at option exercise.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0014 OPTION CLIN (supply) __________

Noun: SUSTAINMENT TECHNICAL DATA PACKAGE NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall provide product drawings and associated lists to enable sustainment of FAB-T terminals in accordance with the documents set forth in section C.

B. Period of performance: Contractor Proposed C. Inspection and Acceptance: After acceptance of the data package, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250), in accordance with the terms and conditions of the documents referenced in Section C.

D. This CLIN will be fully funded at option exercise.

0020 OPTION CLIN (supply) __________

Noun: TT&C EMD COMPLETION NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall complete development of the FAB-T Block 2 capability including CPT Tracking, Telemetry & Commanding (TT&C). The contractor shall upgrade all EDMs to the final software baseline including Block 2 functionality. The contractor shall install the hardware necessary for Block 2 functionality (ASMCS interface) into 1 ground fixed EDM terminal and 1 ground transportable EDM terminal so that the EDMs are production representative in time for IOT&E in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After successful completion of TT&C development and successful upgrades of two EDMs, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0100 OPTION CLIN (supply) Noun: LOW RATE INITIAL PRODUCTION 1 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Low Rate Initial Production 1 in accordance with the documents set forth in Section C.

B. Delivery Dates: The first terminal shall be delivered no later than the fourth quarter in fiscal year 2015.

C. Inspection and Acceptance; Ground Terminals: A DD Form 250 will be executed after the terminal has been installed, installation and checkout procedures successfully completed, and all initial spares are available on site. In the event operational requirements dictate the need for terminal use prior to receipt of spares, a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer until all installation issues have been resolved and at that point a final DD Form 250 will be executed.

Inspection and Acceptance; Airborne Terminals: After each successful completion of factory ATP, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Total: $__________

0101 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:

A. If this option is exercised the contractor shall perform LRIP 1 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0102 0 __________ Noun: DATA FOR LOW RATE INITIAL PRODUCTION CLINS (IF

EXERCISED)

NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If the options are exercised data for CLINs 0013, 0100, 0101, 0200, 0201, and 1001 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit C.

B. This CLIN is Not Separately Priced (NSP). If the options are exercised, prices will be included in CLINs 0013, 0100, 0101, 0200, 0201, and 1001 respective to the data reported on each CLIN.

0103 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations to be provided in Attachment 9, Notional Terminal Delivery Schedule, in support of production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed

C. Inspection and Acceptance: After completion of each site survey and approval of the

PSA, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0104 RESERVED CLIN (supply) Noun: SUPPORT EQUIPMENT NSN: N - Not Applicable Descriptive Data:

A. If this option is exercised the contractor shall provide Support Equipment as identified through the Government approved Support Equipment Requirement Document (SERD) process to install, repair and maintain terminals in accordance with the documents set forth in Section C.

B. Delivery Date: Based on SERD recommendation date

C. Inspection and Acceptance: After each successful delivery of support equipment, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

D. This CLIN will be fully funded at option exercise.

E. Total Price: To Be Negotiated

0105 OPTION CLIN (supply) Noun: SPARES NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall provide spares to support terminal operations in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each successful completion of factory spare ATP, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for spares are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINs may be awarded to purchase any or all of the spares listed in Attachment 10 in variable quantities in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0106 OPTION CLIN (service) Noun: IOT&E FLIGHT TEST AIRCRAFT Descriptive Data:

A. If this option is exercised the contractor shall provide use of an aircraft to support Government required IOT&E flight testing. The contractor shall perform all necessary aircraft modifications to support terminal installation in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise

C. Inspection and Acceptance: After successful A/C and FLT tests, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for Government flight tests are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Pricing for IOT&E Flight Test Aircraft shall be developed for a Firm Fixed Price environment. Separate SubCLINs may be awarded for Mod / De-mod of the aircraft, contractor flights, and/or Government flights in accordance with the documents set forth in Section C. Each SubCLIN will be fully

0200 OPTION CLIN (supply) Noun: LOW RATE INITIAL PRODUCTION 2 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Low Rate Initial Production 2 in accordance with the documents set forth in Section C.

B. Delivery Dates: Contractor Proposed C. Inspection and Acceptance; Ground Terminals: A DD Form 250 will be executed after the terminal has been installed, installation and checkout procedures successfully completed, and all initial spares are available on site. In the event operational requirements dictate the need for terminal use prior to receipt of spares, a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer until all installation issues have been resolved and at that point a final DD Form 250 will be executed.

Inspection and Acceptance; Airborne Terminals: After each successful completion of factory ATP, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0201 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:

A. If this option is exercised the contractor shall perform LRIP 2 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Estimated Cost: $__________

0300 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 1 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 1 in accordance with the documents set forth in Section C.

B. Delivery Dates: Contractor Proposed.

C. Inspection and Acceptance; Ground Terminals: A DD Form 250 will be executed after the terminal has been installed, installation and checkout procedures successfully completed, and all initial spares are available on site. In the event operational requirements dictate the need for terminal use prior to receipt of spares, a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer until all installation issues have been resolved and at that point a final DD Form 250 will be executed.

Inspection and Acceptance; Airborne Terminals: After each successful completion of factory ATP, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0301 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 1 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Estimated Cost: $__________

0302 0 __________ Noun: DATA FOR FULL RATE PRODUCTION CLINS (IF

EXERCISED)

NSN: N - Not Applicable DD1423 is Exhibit: D Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If the options are exercised data for CLINs 0300, 0301, 0400, 0401, 0500, 0501, 0600, 0601, 1002, 1003, 1004, 1101, 1102, 1103, and 1104 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D.

B. This CLIN is Not Separately Priced (NSP). If the options are exercised, prices will be included in CLINs 0300, 0301, 0400, 0401, 0500, 0501, 0600, 0601, 1002, 1003, 1004, 1101, 1102, 1103, and 1104 respective to the data reported on each CLIN.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0400 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 2 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 2 in accordance with the documents set forth in Section C.

B. Delivery Dates: Contractor Proposed.

C. Inspection and Acceptance; Ground Terminals: A DD Form 250 will be executed after the terminal has been installed, installation and checkout procedures successfully completed, and all initial spares are available on site. In the event operational requirements dictate the need for terminal use prior to receipt of spares, a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer until all installation issues have been resolved and at that point a final DD Form 250 will be executed.

Inspection and Acceptance; Airborne Terminals: After each successful completion of factory ATP, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully

0401 OPTION CLIN (service)

DD1423 is Exhibit: D Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 2 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0500 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 3 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 3 in accordance with the documents set forth in Section C.

B. Delivery Dates: Contractor Proposed.

C. Inspection and Acceptance; Ground Terminals: A DD Form 250 will be executed after the terminal has been installed, installation and checkout procedures successfully completed, and all initial spares are available on site. In the event operational requirements dictate the need for terminal use prior to receipt of spares, a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer until all installation issues have been resolved and at that point a final DD Form 250 will be executed.

Inspection and Acceptance; Airborne Terminals: After each successful completion of factory ATP, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully

0501 OPTION CLIN (service)

DD1423 is Exhibit: D Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 3 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0600 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 4 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 4 in accordance with the documents set forth in Section C.

B. Delivery Dates: Contractor Proposed.

C. Inspection and Acceptance; Ground Terminals: A DD Form 250 will be executed after the terminal has been installed, installation and checkout procedures successfully completed, and all initial spares are available on site. In the event operational requirements dictate the need for terminal use prior to receipt of spares, a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer until all installation issues have been resolved and at that point a final DD Form 250 will be executed.

Inspection and Acceptance; Airborne Terminals: After each successful completion of factory ATP, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully

0601 OPTION CLIN (service)

DD1423 is Exhibit: D Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 4 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.

B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

1001 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $7,940,000.00.

Estimated Cost: $__________

1002 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $13,148,000.00 Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

1003 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $18,956,000.00 Estimated Cost: $__________

1004 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $26,730,000.00 Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

1101 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $12,757,000.00.

Estimated Cost: $__________

1102 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $13,104,000.00.

Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

1103 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $13,881,000.00.

Estimated Cost: $__________

1104 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Section C.

D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.

E. Total shall not exceed $14,291,000.00.

Estimated Cost: $__________

NO CLAUSES OR PROVISIONS IN THIS SECTION

SECTION C - DESCRIPTION/SPECS./WORK STATEMENT

SECTION C FA8307-12-R-0003

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

C001 WORK DESCRIPTION/SPECIFICATION (MAY 1997) (TAILORED)

CONTRACT LINE ITEM

NUMBERS (CLINs) DESCRIPTION/SPECIFICATIONS 0001/0003 0004/0005 0007/0020 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1.

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

c. Family of Advanced Beyond-Line-Of-Sight Terminals Entrance and Exit Criteria for System Requirements Review (SRR), Preliminary Design Review (PDR), and Critical Design Review (CDR), Section J, Attachment 3.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 6.

h. Family of Advanced Beyond-Line-Of-Sight Terminals Contractor Data Assertions List, Section J, Attachment 8.

i. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Delivery Schedule, Section J, Attachment 9.

k. Family of Advanced Beyond-Line-Of-Sight Terminals Manpower Pricing Tables, Section J, Attachment 11.

l. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Configuration Description, Section J, Attachment 12.

n. Family of Advanced Beyond-Line-Of-Sight Terminals Cost and Software Data Reporting Plan, Section J, Attachment 14.

o. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Plan, Section J, Attachment 15.

x. Family of Advanced Beyond Line-Of-Sight Terminals Cross Reference Matrix, Section J, Attachment 20.

0002 e. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 6.

r. Family of Advanced Beyond-Line-Of-Sight Terminals Instructions for Contract Data Requirements List, Section J, Exhibit A.

s. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Data Requirements List for CLINs 0001, 0003, 0004, 0005, 0007, 0013 & 0020 Engineering, Development and Manufacturing, Section J, Exhibit B.

x. Family of Advanced Beyond Line-Of-Sight Terminals Cross Reference Matrix, Section J, Attachment 20.

0006/0106 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1.

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 5.

f. Family of Advanced…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .