Exhibit D - Data Requirements List for Production 20120223 v36.pdf
PDF 5 MB Posted
- Solicitation number
- FA8307-12-R-0003
About this file
Draft Exhibit D
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
EXHIBIT D ~ Page 1 of 77 Pages
EXHIBIT D
CONTRACT DATA REQUIREMENTS LIST
For
FAMILY OF ADVANCED BEYOND-LINE-OF SIGHT TERMINAL
(FAB-T)
FULL RATE PRODUCTION (FRP)
RFP FA8307-12-R-0003
23 February 2012
Prepared by:
HQ ELECTRONIC SYSTEMS CENTER
AIR FORCE MATERIEL COMMAND (AFMC)
ELECTRONIC SYSTEMS CENTER (ESC)
FAMILY OF ADVANCED BEYOND-THE-LINE-OF-SIGHT TERMINALS (FAB-T) (ESC/HNT)
CONFIGURATION AND DATA MANAGEMENT
5 EGLIN STREET, HANSCOM AFB, MA 01731-1620
EXHIBIT D ~ Page 2 of 77 Pages
EXHIBIT D TABLE OF CONTENTS
CDRL
SEQ NO.
TITLE/SUBTITLE DID #
D001 Contract Change Proposals (CCPs) DI-ADMN-81401B/T
D002 RESERVED
D003 RESERVED
D004 RESERVED
D005 RESERVED
D006 Engineering Change Proposal (ECP) DI-CMAN-80639C/T
D007 Request for Deviation (RFD) DI-CMAN-80640C/T
D008 RESERVED
D009 RESERVED
D010 Request for Nomenclature (DD Form 61) DI-CMAN-81254/T
D011 RESERVED
D012 RESERVED
D013 TEMPEST Test Plan DI-EMSC-81683
D014 TEMPEST Test Evaluation Report DI-EMSC-81684
D015 TEMPEST Control Plan DI-EMSC-81687
D016 RESERVED
D017 Cost Data Summary Report (DD Form 1921) -- Contractor Cost Data Reporting (CCDR)
DI-FNCL-81565C/T
D018 Functional Cost-Hour Report DD Form 1921-1 -- Contract Cost Data Reporting (CCDR)
DI-FNCL081566C/T
D019 Interim Contractor Support (ICS) Parts Usage and Maintenance Data Collection Report
DI-ILSS-81226/T
D020 RESERVED
D021 Software Development Plan (SDP) DI-IPSC-81427A/T
D022 Software Transition Plan DI-IPSC-81429A/T
D023 System / Subsystem Specification (SSS) DI-IPSC-81431A/T
D024 Software Requirements Specification (SRS) DI-IPSC-81433A/T
D025 Software Design Description (SDD) DI-IPSC-81435A
D026 Software Test Plan (STP) DI-IPSC-81438A
D027 Software Test Description (STD) DI-IDSC-81439A
D028 Software Test Report (STR) DI-IPSC-81440A
D029 Software Product Specification -- Software Products / Systems
DI-IPSC-81441A
D030 Software Version Description (SVD) DI-IPSC-81442A
D031 Corrosion Prevention and Control Plan DI-MFFP-81403
D032 RESERVED
D033 Contract Work Breakdown Structure (CWBS) DI-MGMT-81334D
D034 Data Accession List (DAL) DI-MGMT-81453A
D035 RESERVED
D036 Integrated Master Schedule (IMS) DI-MGMT-81650/T
D037 Communications Security (COMSEC) Anonymity Plan DI-MGMT-81717C
D038 RESERVED
D039 RESERVED
D040 Information Assurance (IA) Design Review Information Package (DRIP) DI-MGMT-81845
D041 Technical Report – Study / Services -- Project Support Agreement (PSA)
DI-MISC-80508B/T
D042 Scientific and Technical Report -- Interface & Operators Guide
DI-MISC-80711A/T
D043 Scientific and Technical Report -- Security Production Assurance
DI-MISC-80711A/T
D044 RESERVED
D045 RESERVED
EXHIBIT D ~ Page 3 of 77 Pages
CDRL
SEQ NO.
TITLE/SUBTITLE DID #
D046 Automated Computer Program Identification Number (ACPIN) Data and Control Record
DI-MISC-81454/T
D047 Key Management Plan -- Key Management Plan & Benign Fill Requirements
DI-MISC-81688
D048 Security Evaluation Document (SED) DI-MISC-81762
D049 Test / Inspection Report DI-NDTI-80809B
D050 RESERVED
D051 First Article Qualification Test Plan and Procedures -- First Article Qualification Test Plan
DI-NDTI-81307A
D052 RESERVED
D053 GIDEP Annual Progress Report --DMS/MS Reporting
DI-QCIC-80127A
D054 Security Verification Plan & Procedures -- Cryptographic Verification/Security Verification (CV/SV) Plan and Procedures
DI-QCIC-81689
D055 Security Verification (SV) Report -- Cryptographic Verification/Security Verification (CV/SV) Rpt
DI-QCIC-81690
D056 In-Process Accounting Procedures Plan -- In-Process Accounting Procedures Documentation
DI-QCIC-81691A
D057 Failed Item Analysis Report DI-RELI-80253
D058 Failure and Analysis Tracking Report DI-RELI-80255
D059 RESERVED
D060 System Safety Hazard Analysis (SSHA) Report DI-SAFT-80101B/T
D061 Safety Assessment Report DI-SAFT-80102B
D062 Parts Management Plan DI-SDMP-81748
D063 Parts Management Plan --Supply Chain Risk Management Plan
DI-SDMP-81748
D064 RESERVED
D065 RESERVED
D066 RESERVED
D067 RESERVED
D068 Engineering Database and Configuration Management Information (EDCMI) -- Engineering and Drawings, Software and Configuration Management Information Database
DI-SESS-81694
D069 Test Plans / Test Procedures DI-SESS-81704
D070 Written Course of Instruction of Key Personnel --Maintenance Training Plan and Course of Instruction (COI)
DI-SESS-81724
D071 Request for Waiver (RFW) DI-SESS-81732
D072 RESERVED
D073 Full Maintenance Manual (Type III) DI TMSS-81668A
D074 Reliability Program Plan ANSI/GEIA-STD-0009/T
EXHIBIT D ~ Page 4 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER __ADMN___
D. SYSTEM/ITEM:
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D001
2. TITLE OF DATA ITEM
Contract Change Proposals (CCPs)
3. SUBTITLE
4. AUTHORITY. (Data Acquisition Document No.)
DI-ADMN-81401B/T
5. CONTRACT REFERENCE
SOW PARA 3.1.4.2
6. REQUIRING OFFICER
ESC/HNT (FAB-T Alternate Source)
7. DD 250 REQ.
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT ASREQ See Block 16 b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
Final
See Block 16 N/A See Block 16 Reg Electronic
16. REMARKS See Block 16 *:
Block 8: Government disposition will be upon issuance of the definitive contract modification.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012). Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: Submit no later than one (1) month after identification of requirement or as identified within the Request For Proposal. Revisions as required.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Preparation Instructions, General Instructions and CDRL Address List (on CDRL Address List page) of the CDRL package.
** For every Contract Change Proposal (CCP) a CD ROM with the entire proposal shall be mailed to ESC/HNTK (Attention: FAB-T Alternate Source Buyer).
ESC.HNT.DATA 1
ESC/HNTK L/T
See Block 16: **
FAB-T
ALTERNATE
SOURCE Buyer
15. TOTAL See 16
G. PREPARED BY.
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
I. APPROVED BY.
Douglas Dalessio, Program Manager, ESC/HNT
J. DATE
23 Feb 12
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 5 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D002
2. TITLE OF DATA ITEM
RESERVED
5. CONTRACT REFERENCE
6. REQUIRING OFFICER
b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
Reg Electronic
H. DATE
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages
EXHIBIT D ~ Page 6 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER ___
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D003
2. TITLE OF DATA ITEM
3. SUBTITLE:
16. REMARKS
15. TOTAL See 16 See 16 See 16
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 7 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER ___
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D004
2. TITLE OF DATA ITEM
3. SUBTITLE:
15. TOTAL See 16 See 16 See 16
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 8 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D005
2. TITLE OF DATA ITEM
EXHIBIT D ~ Page 9 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER __CMAN___
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D006
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
DI-CMAN-80639C/T
5. CONTRACT REFERENCE
SOW PARA 3.1.4.2
6. REQUIRING OFFICER
SEE BLOCK 16 See Block 16 Reg Electronic
Block 4: DD Form 1664 is tailored as follows:
Paragraph 2.i: Delete word “complete” Paragraph 2, last sentence: Delete entire reference to ANSI/EIA-649- 1998.
Block 8: Government disposition will be upon receipt of the definitive contract modification.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: All data is due no later than noon East Coast Time.
Due no later than one month after identification of requirement or as identified within the Request For Proposal. Revisions as required.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Preparation Instructions, General Instructions and CDRL Address List (on CDRL Address List page) of the CDRL package.
** For every Engineering Change Proposal (ECP) a CD ROM with the entire proposal shall be mailed to ESC/HNTK (Attention: FAB-T Alternate Source Buyer).
See Block 16 *:
See Block 16: **
FAB-T ALTERNATE
SOURCE Buyer
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 10 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER __CMAN___
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D007
2. TITLE OF DATA ITEM
Request for Deviation (RFD)
DI-CMAN-80640C/T
5. CONTRACT REFERENCE
SOW PARA 3.1.4.3
6. REQUIRING OFFICER
SEE BLOCK 16 See Block 16 Reg Electronic
Paragraph 2: Delete reference to ANSI/EIA-649-1998.
Block 8: Government disposition will be upon issuance of the definitive contract modification.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: Submit no later than one month after identification of requirement. Revisions as required
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Preparation Instructions, General Instructions and CDRL Address List (on CDRL Address List page) of the CDRL package.
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 11 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER ______
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D008
2. TITLE OF DATA ITEM
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 12 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM/ITEM:
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D009
2. TITLE OF DATA ITEM
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 13 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER ___CMAN___
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D010
2. TITLE OF DATA ITEM
Request for Nomenclature (DD Form 61)
DI-CMAN-81254/T
5. CONTRACT REFERENCE
SOW PARA 3.1.4.5
6. REQUIRING OFFICER
See Block 16 See Block 16 Reg Electronic
16. REMARKS
Data effort is a continuation of B010 and C010.
Block 4: DD Form 1664 is tailored as follows:
Para 7.2, change “…and Chapter 300 of MIL-STD-100.” to “…and ASME Y14.100M.”
Contractor format is acceptable although the format shall meet Joint Electronic Type Designation Automated System requirements to complete the DD Form 61.
Para. 10.2.14: Delete reference to MIL-STD-196. Content shall be in accordance with the DD Form 61.
Block 8: Government disposition shall be provided 1 month after nomenclature number assignment from Ft. Monmouth.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: Revisions only if there is a design change or by
PCO direction.
Submit using Joint Electronic Type Designation Automated System (JETDAS). See the website: https://tdsa6.monmouth.army.mil/jetdas for requirements.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 14 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM/ITEM:
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D011
2. TITLE OF DATA ITEM
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 15 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM/ITEM:
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D012
2. TITLE OF DATA ITEM
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 16 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER EMSC _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D013
2. TITLE OF DATA ITEM
TEMPEST Test Plan
DI-EMCS-81683
5. CONTRACT REFERENCE
SOW PARA 3.3
6. REQUIRING OFFICER
LT R/ASR See Block 16 b. COPIES
16. REMARKS See Block 16 *:
Data effort is a continuation of B013 and C013.
Block 8: Government disposition will be three months after the receipt of submittals.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 17 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER EMCS_
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D014
2. TITLE OF DATA ITEM
TEMPEST Test Evaluation Report
DI-EMCS-81684
5. CONTRACT REFERENCE
SOW PARA 3.3
6. REQUIRING OFFICER
ESC/HNT (FAB-T ALTERNATE SOURCE)
10. FREQUENCY 12. DATE OF FIRST SUBMISSION
16. REMARKS See Block 16 *:
Data effort is a continuation of B014 and C014.
Block 8: Government disposition will be 30 days after the receipt of submittals.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 18 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER EMCS_
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D015
2. TITLE OF DATA ITEM
TEMPEST Control Plan
DI-EMCS-81687
5. CONTRACT REFERENCE
SOW PARA 3.3
6. REQUIRING OFFICER
16. REMARKS See Block 16 *:
Data effort is a continuation of B015 and C015.
Block 8: Government disposition will be 30 days after the receipt of submittals.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13: Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 19 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D016
2. TITLE OF DATA ITEM
EXHIBIT D ~ Page 20 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER __FNCL___
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D017
2. TITLE OF DATA ITEM
Cost Data Summary Report (DD-Form 1921)
3. SUBTITLE
Contractor Cost Data Reporting (CCDR)
4. AUTHORITY. (Data Acquisition Document No.)
DI-FNCL-81565C/T
5. CONTRACT REFERENCE
SOW PARA 3.1.5.4
6. REQUIRING OFFICER
ESC/HNTX (FAB-T ALTERNATE SOURCE)
See Block 16 BLK 16 See Block 16 Reg Electronic
16. REMARKS
Data effort is a continuation of B017 and C017.
Block 4: DD Form 1664 is tailored as follows:
Prepare Blocks 10 through 13 in accordance with the OSD CAIG Chair-approved Cost and Software Data Reporting (CSDR) Plan provisions, the WBS Data Dictionary, and the CSDR Manual (DoD 5000.4-M-1).
The CSDR Plan is included as a Contract Attachment 14. The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) Website at http://dcarc.pae.osd.mil/
Prime contractor is responsible for flowing down CSDR requirements contained in their prime contract to all subcontractors who meet the reporting thresholds This includes requiring subcontractors to electronically report directly to the DCARC
Block 8: Government disposition shall be provided electronically by the office of OSD DCARC through their official website.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 11, 12 & 13: Deliver in accordance with the applicable CSDR
Plan (Contract Attachment 14), Block 14 CSDR Submission Dates for applicable events and due dates.
Revisions as required.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Preparation Instructions, General Instructions and CDRL Address List (on CDRL Address List page) of the CDRL package.
** All CCDR-related forms must be electronically forwarded to the DCARC Website at http://dcarc.pae.osd.mil and to ESC/HNT for the Prime contractor and subcontractor submissions.
See Block 16 **:
OSD DCARC 1
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
I. APPROVED BY.
Douglas Dalessio, Program Manager, ESC/HNT
J. DATE
EXHIBIT D ~ Page 21 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER __FNCL _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D018
2. TITLE OF DATA ITEM
Functional Cost-Hour Report (DD Form 1921-1)
3. SUBTITLE
Contractor Cost Data Reporting (CCDR)
4. AUTHORITY. (Data Acquisition Document No.)
DI-FNCL-81566C/T
SOW PARA 3.1.5.4
ESC/HNTX (FAB-T ALTERNATE SOURCE)
See Block 16 See Block
See Block 16 Reg Electronic
16. REMARKS
Data effort is a continuation of B018 and C018.
Block 4: DD Form 1664 is tailored as follows:
Prepare Blocks 10 through 13 in accordance with the OSD CAIG Chair-approved Cost and Software Data Reporting (CSDR) Plan provisions, the WBS Data Dictionary, and the CSDR Manual (DoD 5000.4-M-1).
The CSDR Plan is included as a Contract Attachment 14. The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) Website at http://dcarc.pae.osd.mil/
Prime contractor is responsible for flowing down CSDR requirements contained in their prime contract to all subcontractors who meet the reporting thresholds This includes requiring subcontractors to electronically report directly to the DCARC
Block 8: Government disposition shall be provided electronically by the office of OSD DCARC through their official website.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 11, 12 & 13: Deliver in accordance with the applicable CSDR
Plan (Contract Attachment 14), Block 14 CSDR Submission Dates for applicable events and due dates.
Revisions as required.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Preparation Instructions, General Instructions and CDRL Address List (on CDRL Address List page) of the CDRL package.
** All CCDR-related forms must be electronically forwarded to the DCARC Website at http://dcarc.pae.osd.mil and to ESC/HNT for the Prime contractor and subcontractor submissions.
See Block 16 **:
OSD DCARC 1
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 22 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER ILSS_
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D019
2. TITLE OF DATA ITEM
Interim Contractor Support (ICS) Parts Usage and Maintenance Data Collection Report
DI-ILSS-81226/T
5. CONTRACT REFERENCE
SOW PARA 3.7.1
6. REQUIRING OFFICER
LT MTHLY See Block 16 b. COPIES
8. APP CODE D
11. AS OF DATE 13. DATE OF SUBSEQUENT
A See Block 16 Reg Electronic
16. REMARKS See Block 16 *:
Data effort is a continuation of B019 and C019.
Paragraph 10.1: delete “or floppy disc” and replace with “means”.
Block 9: Distribution Statement D applies: Distribution authorized to the Department of Defense and U.S. DoD contractors only.
(critical technology) (21 Sep 2010), other requests for this document shall be referred to ESC/HNT 5 Eglin Drive. Hanscom AFB MA 01731 which is the DoD controlling office. (please refer to CDRL instructions, paragraph 14 and subparagraphs)
Blocks 8, 10, 12 & 13: Submit Initial one month after first Production install.
Subsequent submission due monthly, thereafter, on the 27 th day of each month.
Approval/disapproval by PCO letter within 15 days after receipt.
Revisions as required.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 23 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D020
2. TITLE OF DATA ITEM
EXHIBIT D ~ Page 24 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER IPSC_
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D021
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
DI-IPSC-81427A/T
5. CONTRACT REFERENCE
SOW PARA 3.4.1
6. REQUIRING OFFICER
LT ANNLY See Block 16 b. COPIES
16. REMARKS See Block 16 *:
Data effort is a continuation of B021and C021.
Contractor format is acceptable.
Delivery of individual SDDs required for each software configuration item.
Block 8: Approval for IA/CRYPTO boundary software configuration items, in support of NSA certification require two month lead time for Government approval.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 10, 12 & 13:
Submit annually beginning one (1) year after CDR.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 25 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____________ TM- _____________ OTHER IPSC_
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D022
2. TITLE OF DATA ITEM
Software Transition Plan
DI-IPSC-81429A/T
5. CONTRACT REFERENCE
SOW PARA 3.6.9
6. REQUIRING OFFICER
N/A See Block 16 Reg Electronic
16. REMARKS See Block 16 *:
Data effort is a continuation of B022 and C022.
Paragraph 4 (Content) sub-paragraph 3.5 (Personnel): after words „skills‟ add “, software language needed,”
Block 9: Distribution Statement D applies: Distribution authorized to the Department of Defense and U.S. DoD contractors only.
(critical technology) (21 Sep 2010), other requests for this document shall be referred to ESC/HNT 5 Eglin Drive. Hanscom AFB MA 01731 which is the DoD controlling office. (please refer to CDRL instructions, paragraph 14 and subparagraphs)
Blocks 10, 12 & 13: Revisions as required.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
SMC/MCL 1
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 26 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP _____X_______ TM- _____________ OTHER ______
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D023
2. TITLE OF DATA ITEM
System / Subsystem Specification (SSS)
DI-IPSC-81431A/T
5. CONTRACT REFERENCE
SOW PARA 3.2.3
6. REQUIRING OFFICER
Data effort is a continuation of B023 and C023.
Block 4: DD Form 1664 is tailored as follows: Contractor format acceptable.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 8, 10, 12, &13: Submit Draft change pages in conjunction with
D008, Engineering Change Proposal (ECP).
Government disposition will be upon receipt of the definitive contract modification.
Submit Final change pages 15 days after contract modification award incorporating ECP into the contract.
Blocks 14 & 15: * All Data shall be submitted IAW Part 2 CDRL
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
DD Form 1423–1, JUN 90 Previous editions are obsolete Page __1__ of __1__ Pages .
EXHIBIT D ~ Page 27 of 77 Pages
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contractor Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
D
C. CATEGORY:
TDP ____X_______ TM- _____________ OTHER _
D. SYSTEM / ITEM
FAB-T Alternate Source
E. CONTRACT / PR NO.
FA8307-12-R-0003
F. CONTRACTOR
TO BE DETERMINED
1. DATA ITEM NO.
D024
2. TITLE OF DATA ITEM
Software Requirements Specification (SRS)
DI-IPSC-81433A/T
5. CONTRACT REFERENCE
SOW PARA 3.4.1
6. REQUIRING OFFICER
16. REMARKS See Block 16 *:
Data effort is a continuation of B024 and C024.
Contractor format is acceptable.
Block 9: Distribution authorized to Department of Defense and US DoD
Contractors only (Administrative or Operational Use) (January 2012).
Other requests shall be referred to ESC/HNT or higher DoD authority.
Blocks 8, 10, 12, &13: Submit Draft change pages in conjunction with
D008, Engineering Change Proposal (ECP).
IA/CRYPTO boundary software configuration items, in support of NSA certification require two month lead time for Government approval.
Government disposition will be upon receipt of the definitive contract modification.
Submit Final change pages 15 days after contract modification award incorporating ECP into the contract.
Donna Jansky, Data Mgr, ESC/HNT
H. DATE
23 Feb 12
EXHIBIT D ~ Page 28 of 77 Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .