1 RFP Section J.pdf

PDF 7 MB Posted

Attached to
Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Alternate Source
Solicitation number
FA8307-12-R-0003
Issued by

About this file

DRAFT RFP Section J Exhibits Attachments

View the file

Other files

File Type Posted
NOCA 04 Sept 12.pdf PDF
RFP Letter 4 v1.pdf PDF
Atch 13 - Cost Formats 20120602.xlsx XLSX spreadsheet
RFP Letter 3 v2.pdf PDF
RFP Letter 2 v1.pdf PDF
GTRD 14 May Update Errata.docx DOCX document
1 RFP 20120424 Section J.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120424.xlsx XLSX spreadsheet
Atch 13 - Cost Formats 20120416v35.xlsx XLSX spreadsheet
RFP Letter v4.pdf PDF
1 RFP 20120424 No Attachments.pdf PDF
DRAFT RFP No Attachments.pdf PDF
DRAFT RFP Section J.pdf PDF
1 RFP No Attachments and Exhibits.pdf PDF
20120323_FABT_AltSource_Revised_and_New_Docs_Available_v2.pdf PDF
Revised_GTRD_20120224_FABT_AltSouce_Special_Handling.pdf PDF
Draft RFP 3_9_12 v30 Sections A-M.pdf PDF
Draft RFP 3_9_12 v30 Exhibits and Attachments.pdf PDF
FAB_T_Industry_Day_Brief_8MAR2012_FEDBizOpps.pdf PDF
NOTICE OF CONTRACT ACTION.pdf PDF
ESC_OCI_PolicyBrief_IDB2008.ppt PPT presentation
Atch 13 - Cost Formats 20120228 v23.pdf PDF
SECTION L 20120301 cdl.pdf PDF
FAB-T RFI for 8 March 2012 Industry Day Jan 2012 V1.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120216 v3.pdf PDF
Exhibit E - Data Requirements List for TM86-01 20120223 v36.pdf PDF
Exhibit A - Instructions for Data Requirements List 20120223 v36.pdf PDF
Atch 14 - Cost and Software Data Reporting Plan.pdf PDF
Exhibit C - Data Requirements List for LRIP 20120223 v36.pdf PDF
Exhibit D - Data Requirements List for Production 20120223 v36.pdf PDF
CLIN structure V26 - 2.pdf PDF
Exhibit F - Data Requirements List for PDAL - full 20120223 v36.pdf PDF
Exhibit B - Data Requirements List for EMD 20120223 v36.pdf PDF
Atch 3 - Entrance and Exit Criteria for SRR PDR CDR 20120223.pdf PDF
Atch 1 - Statement of Work 20120223 v36.pdf PDF
Exhibit G - Data Requirements List for PDAL - sust 20120223 v36.pdf PDF
Atch 4 - Preliminary WBS.pdf PDF
Atch 13 - Cost Formats 20120223 v23.pdf PDF
Atch 9 - Terminal Delivery Schedule 20120223 v4.pdf PDF
Gov_Proposed_WBS.pdf PDF
FAB_T_Corporate_NDA.pdf PDF
SECTION_M.pdf PDF
DD Form 254.pdf PDF
SECTION_L.pdf PDF
GTRD_and_Other_Documents_Requiring_Special_Handling.pdf PDF
FA8307_12_R_0003.pdf PDF
FAB_T_Individual_NDA.pdf PDF
FAB_T_RFI_for_Industry_Day.pdf PDF
FAB_T_Industry_Day_Brief_Jan_12.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8307-12-R-0003

Exhibit A

Instructions for Contract Data Requirements List (CDRL)

For

Family of Advanced Beyond-Line-of-Sight

Terminals

DRAFT

REVISION INDEX

Rev Description of Revision Exhibit Revised Date v21 Draft in synch with Draft SOW v21 A, B, C, D 24 January 2012 v28 Draft in synch with Draft SOW v28

Admin changes to:

B001, B003, B008-012, B018, B020-022, B034- 036, B039-041, B043, B044, B046, B049, B052- 055, B060-063, B066, B070, B072, B074 C001-003, C008, C009, C012, C020-022, C034, C035, C039, C041, C049, C052, C054, C060, C062, C063, C066, C072, C074 D001-003, D008, D009, D012, D020-022, D034, D035, D041, D046, D049, D052, D054, D060, D062, D063, D066, D072, D074 Deleted: B019, B028, B040, B041, C028, C040, C041, D028, D041 Added: B0xx, C0xx, D0xx

A, B, C, D 7 February 2012

V36 Draft in synch with Draft SOW v36 Added CDRLs for IMS, IOT&E Spt Rev Rpt, Airborne Integrator CPT Spt Extracted PDAL and TMCR CDRLs to individual Exhibits (E, F, and G).

All CDRLs renumbered.

Exhibit A:

Clarification of the word “disposition” used on CDRLs in Supplemental CDRL information Added mailing addresses for SCMS/GULAAC, DLIS-KPD

Admin changes to:

B003, B006, B010, B017, B018, B021, B027, B035, B038, B039, B044, B064, B065, B066 C001, C005-007, C010, C017, C018, C025-027, C029, C031, C035, C037, C038, C044, C046, C064-066, C071 D001, D006, D007, D017, D018, D025, D026, D031, D046, D071

A, B, C, D 23 February 2012

V39 Draft in synch with Draft SOW v39 A, B, C, D, E, F, G

6 March 2012

V41 Draft in synch with Draft SOW v41 CFSR CDRL added to Exhibit B. CDRL numbers rolled. RESERVED CDRL added to Exhibits C and D.

A, B, C, D

20 March 2012

Exhibit A

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL FOR THE CONTRACTOR

Item A. Self-explanatory Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

Item B. Self-explanatory

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM -

Technical Manual; Other - other category of data, such as “Provisioning”, “Configuration Management”, etc.

a. Group I. Definition - Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Item D. Enter name of system/item being acquired that data will support

Item E. Self-explanatory (to be filled in after contract award.

Item F. Self-explanatory (to be filled in after contract award.

Item G. Signature of preparer of CDRL.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government .

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administration and other expenses related to reproducing and delivering such data item to the government.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g. Statement of Work paragraph number).

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the government.

Item 6. Enter technical office responsible for ensuring adequacy of the data item. d. Group IV. Definition - data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Estimated Price - Group IV items should normally be shown on the DD

Form 1423 at no cost.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data. These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use of additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

DD FORM 1423 SUPPLEMENTAL INFORMATION

The required data requested on the DD Forms 1423s shall be prepared in accordance with the applicable Data Item Descriptions (DIDs) set forth in the Acquisition Streamlining and Standardization Information System (ASSIST). The DD Form 1664 (DID), along with any DID tailoring in Block 16 of the DD Form 1423, contains instructions which shall be followed by the contractor in the preparation of data for delivery under this contract.

APPLICABLE DOCUMENTS. The contractor shall use as a guide the following documents to the extent specified.

Document and Date Title

DOD Directive 5230.24 Distribution Statements on Technical Documents 18 Mar 87

ASSIST Acquisition Streamlining and Standardization Information System current

DOD 5010.12-M Procedure for the Acquisition and Management of Technical Data current

DOD 5000.2-R Mandatory Procedures for Major Defense Acquisition (MDAPS) and Major Automated Information System (MAIS) Acquisition Programs

DD 250 REQUIREMENT (BLOCK 7): A DD Form 250 will only be required for data listed on the CDRL which requires government inspection and acceptance. These are:

(1) Final Air Force technical Orders.

(2) Engineering drawings delivered to an Air Logistics Center Engineering Data Service Center.

(3) Data which will be used by Air Force personnel for operation, installation, or maintenance, even though equipment and/or software will not be transferred to AFLC (AFR 800-4).

Location designation for performance of government inspection and acceptance (contractor’s facility or destination) are shown below:

CODE INSPECTION ACCEPTANCE

SS Source (DD Form 250) Source (DD Form 250) DD Destination (DD Form 250) Destination (DD Form 250) SD* Source (DD Form 250) Destination (DD Form 250) DS Destination (DD Form 250) Source (DD Form 250) LT Letter of Transmittal only NO No inspection or acceptance required XX Inspection and acceptance requirements specified elsewhere in the contract

NOTE: “S” indicates the contractor's facility. “D” normally indicates the primary distribution point.

*SD will be used for all engineering data that are to be delivered to an Engineering Data Service Center

Exhibit A

LETTER OF TRANSMITTAL: Data submitted under this contract (electronically or hard copy) shall be accompanied by a letter of transmittal (LT) addressed to the Procuring Contracting Officer (PCO).

Each LT shall be identified with the following elements:

a) Contractor

b) Contractor’s LT Number, including a running serial number and date

c) Contract Number

d) CDRL Data Item Number, including a running sequence number and revision status (revision shall be indicated by an alpha character).

e) DID number and Title

f) Revision Identification, if any

g) Location of document where posted on the FAB-T Alternate Source Website

h) Method of Transmission of document (i.e. Express Mail or ESC/HNT Common Mailbox).

In all cases an electronic signed copy of the LT for each data deliverable (draft/final) shall be sent to the ESC/HNT Common Mailbox (ESC.HNT.DATA@HANSCOM.AF.MIL) and to ESC/HNTK no matter which mode of transmission is used.

APPROVAL REQUIREMENT (BLOCK 8): An “A” in Block 8 indicates the data requires Government review and written approval by the PCO PRIOR to the distribution of the FINAL submittal.

Most of these data require submission of a Draft prior to the publication of a final document.

Approval does not indicate Government concurrence to proceed to the next event unless specifically stated in the PCO letter.

When Block 8 is blank, approval is not required; however, the Government has the inherent right to disapprove any data item that does not comply with the DID format and content requirements.

DISPOSITION OF DATA REQUIRING APPROVAL: In the event that a data submission is disapproved, the PCO will advise the contractor of the reasons for disapproval and a resubmission shall be accomplished within 30 days unless otherwise directed in the PCO letter.

In the event that a data submission is approved with comments, a resubmittal is required unless otherwise directed in the PCO letter.

GOVERNMENT RESPONSE TIME: Unless a different time period for approval is specified on the DD Form 1423-1, the Government will notify the contractor of the approval/disapproval disposition of a data submission within 30 days of receipt of the data submitted through e-mail. For data submitted via USPS/overnight mail the disposition will be within 30 days after receipt of the data.

Government response dates falling on Saturdays, Sundays or Federal holidays will be adjusted to fall on the next regular working day.

The Contractor shall not assume Government concurrence with any data item designated for approval until so notified by PCO letter.

In the event that the contractor delivers one or more revisions to a submitted document during the Government review cycle, the Government will provide a single disposition to the overall document (initial submittal and changes) one calendar month after receipt of the final revision unless otherwise specified by PCO letter.

Exhibit A

DISTRIBUTION STATEMENT AND EXPORT CONTROL (BLOCKS 9 AND C): Appropriate DoD Directive 5230.24 Distribution Statements identified in Block 9 on the DD Form 1423, and further defined in the CDRL “Remarks” Block, shall be placed on the document cover page.

The contractor shall apply export control warning statements IAW DoD Directive 5230.25 to CDRL items identified as “TDP” in item C of each DD Form 1423-1.

Increases or decreases to CDRL quantities shall be in accordance with the Special Provision titled “Modification of Data Requirements”.

The documents referenced in Block 10 of the DIDs shall be the issue cited in the Statement of Work (SOW) / Integrated Master Plan (IMP).

FREQUENCY (BLOCK 10). The following are the codes used in this block:

CODE FREQUENCY

MTHLY Monthly QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time and revisions R/ASR Revisions as required

* ASREQ As required

* When ASREQ is used in Items 10, 11, 12, or 13, an explanation of the requirement will be entered in Block 16.

DUE DATES (BLOCKS 12 AND 13): Data shall be submitted in accordance with the due dates specified on the individual DD Form 1423-1,or unless otherwise specified in the contract or in a PCO letter. Due dates falling on non-working days (Saturdays, Sundays, and Federal holidays) shall be construed to mean the next regular working day. Unless otherwise specified, reference to award of contract for data delivery shall be interpreted as the mailing date of the contract.

All due dates (e.g., 30 DAC) are calendar counted unless designated otherwise. All data must be received by noon East Coast Time.

NEGATIVE SUBMITTALS: Requirements for periodic revisions to data, where no changes have occurred since date of last submission, shall be satisfied by a record LT from the contractor stating that “no changes have occurred since the last submission”. In such cases, the contractor shall identify the data in question and assign the next delivery CDRL sequence number and the reporting period. Government disposition will not be provided for record transmittals, however, the Government reserves the right to non-concur with the reported negative status.

DUPLICATION: The Contractor shall take care not to unnecessarily duplicate data previously procured by the Government, except to provide required copies to newly established recipients under the contract.

Instances of apparent unnecessary duplication should be identified to the 850th ELSG/PKC office. The Contractor is encouraged to recommend deletions, additions, substitutions, consolidations, and use of existing contractor or subcontractor formats of data when such actions will aid the procuring agency in obtaining minimum essential data, in a timely and cost effective manner.

Exhibit A

FORMAT: All documentation for deliverables shall be prepared using Microsoft Office products (Word, Excel, Project, and PowerPoint) in a readable format, able to be copied, searchable and editable, unless the use of other software is mutually agreed upon between the Contracting Officer and the contractor.

All data (draft/final) shall be delivered by electronic media. Electronic Mail (e-mail) is acceptable for delivery purposes (with the exception of classified documents). All data must comply with the distribution statements indicated in Block 9 of the DD Form 1423-1. The FAB-T Alternate Source website must indicate the appropriate distribution statement applicable to the specific documents that will be accessed via the FAB-T Alternate Source website. In the case of classified documents or oversized documents that exceed the e-mail limitations, that data should be delivered to the address listed on the CDRL Address List. For these classified or oversized submittals, the Contractor will continue to transmit the related e-mail notification to the ESC/HNS Common Mailbox (ESC.HNT.DATA@HANSCOM.AF.MIL) and addressees noted within the DD Form 1423-1 that includes the transmittal letter, and other smaller attachments. Additional delivery information is contained within Exhibit A, Part 2, CDRL Address List (following these General Instructions).

For all Contract Change Proposals (CCPs) and Engineering Change Proposals (ECP) (DI-ADMN- 81401B/T and DI-CMAN-80639C/T of this contract) the entire proposal shall be mailed to the FAB-T Contracts; ESC/HNTK (Attention: FAB-T Alternate Source Buyer).

CDRL ADDRESS LIST FOR EXHIBITS

MAILING ADDRESS FOR ESC/HNT

Department of the Air Force Air Force Material Command (AFMC) HQ Electronic System Center (ESC) ESC/HNT (FAB-T Data Management Officer) 5 Eglin Street Building 1624 Hanscom AFB, MA 01731

MAILING ADDRESS FOR SMC/MCL

SMC/MCL

1050 East Stewart Avenue, Building 2025 Peterson AFB, CO 80914-4370

MAILING ADDRESS FOR OSD DCARC

Defense Cost and Resource Center (DCARC) 1111 Jefferson Davis Highway PO Box 005 Arlington, VA 22202 Phone: (703) 602-3169 Website: http://dcarc.pae.osd.mil

MAILING ADDRESS FOR SCMS/GULAAC

6038 Aspen Ave Building 1289 SW Hill AFB UT 84056

MAILING ADDRESS FOR DLIS-KPD

74 Washington Ave Battle Creek MI 49037

All data (except classified) for every CDRL shall be submitted electronically to the following email address: ESC.HNT.DATA@HANSCOM.AF.MIL. Additional addressees (websites) may be specified on individual DD Form 1423s.

Every CDRL deliverable (draft/final) shall be submitted electronically in Microsoft Word, PDF or other software as mutually agreed upon. With the exceptions as follows:

- For Nomenclature CDRL (DI-CMAN-81254A/T) requests use the Joint Electronic Type Designation Automated System (JETDAS). Use the website: tdsa6.monmouth.army.mil/tdas.htm for requirements.

- For CCDR and SRDR CDRLs (DI-FNCL-81565C/T, DI-FNCL-81566C/T, DI-MGMT-81739B/T and DI-MGMT-81740A/T): Forward an electronic copy (in Microsoft Excel format) of all CCDR and SRDR related forms to the OSD DCARC website: http://dcarc.pae.osd.mil.

- For ACPIN CDRL (DI-MISC-81454B/T) requests use the http://wbcpins.tinker.af.mil website.

- All COST CDRLS (DI-FNCL-81565C/T, DI-FNCL-81566C/T,DI-MGMT-81334D, DI-MGMT- 81466A/T, DI-MGMT-81739B/T and DI-MGMT-81740A/T): Contractor to format and transmit the deliverable data for Electronic Data Interchange (EDI) in accordance with the American National Standards Institute (ANSI X12) standards (transaction sets 839 for cost and 806 for schedule).

* One electronic copy of the signed Letter of Transmittal (L/T) for each CDRL deliverable (draft/final) shall be provided to ESC/HNTK.

All CDRL deliverables will be posted on the FAB-T Alternate Source web site (with the exception of classified documents).

Exhibit A

Electronic Mail (e-mail) is acceptable for delivery purposes (with the exception of classified documents, or oversized documents that exceed the e-mail limitations).

ELECTRONIC DELIVERY AS FOLLOWS:

All electronic media shall be screened for viruses and shall be delivered virus free.

UNCLASSIFIED CDRL deliverables shall be submitted as an attachment to an email. Unclassified documents do not require password protection. One copy of all unclassified CDRL deliverables shall be submitted via the ESC/HNT Common Mailbox (ESC.HNT.DATA@HANSCOM.AF.MIL).

All FOUO data shall be submitted as an attachment within an encrypted email. One copy of all FOUO CDRL deliverables shall be submitted via the ESC/HNT Common Mailbox

(ESC.HNT.DATA@HANSCOM.AF.MIL).

CLASSIFIED CDRL deliverables: One copy shall be delivered to the ESC/HNT (FAB-T) mailing address (see below). Allow five business days for Base distribution of all classified packages. The contractor shall transmit a copy of the Letter of Transmittal (L/T), for notification of the classified submittal delivery, to the ESC/HNT Common Mailbox (ESC.HNT.DATA@HANSCOM.AF.MIL) at the time the classified package is shipped.

MAILING DELIVERY FOR CLASSIFIED DOCUMENTS AS FOLLOWS: (Unless a different Organization/Address is directed via a PCO letter.)

Classified Documents shall be submitted via the US Postal Service Registered Mail or Overnight Express mail (Airborne Express, FedEx, etc.) and shipped to the following address:

On Outer Wrapper:

Department of the Air Force

Air Force Material Command (AFMC) HQ Electronic System Center (ESC)

ESC/HNT (FAB-T Alternate Source) 5 Eglin Street Building 1624 Hanscom AFB, MA 01731-2100 Attn: Security Officer – ESC/HNT (FAB-T Alternate Source)

On Inner Wrapper:

ESC/HNT (FAB-T Alternate Source) 5 Eglin Street Building 1624 Hanscom AFB, MA 01731-2100 Attention: For FAB-T Contract To be Announced FAB-T Secretary (781) 271-6970 / Mr. Mike Rioux (781) 271-6064 / or Mr. Joseph DiChiara (781) 271-3942

RFP FA8307-12-R-0003

Exhibit A

CDRL LISTING

TITLE DID Apprvl SOW Para EX B Delivery Schedule EX C Delivery Schedule EX D Delivery Schedule

001 Contract Change Proposal (CCP) DI-ADMN-81401B Yes 3.1.4.2 ASREQ ASREQ ASREQ

Logistics Management Information (LMI) Data Products -- Provisioning Technical Documentation

(PTD)

DI-ALSS-81529/T Yes 3.6.5.1 Established at the Provisioning Guid Conf

Established at the Provisioning Guid Conf N/A

Logistics Management Information (LMI) Summaries -- Repair Level Analysis

DI-ALSS-81530/T Yes 3.6.3

ASREQ

- Initial 1MP PDR

- Update 1MP CDR

- Final 2MP Final FCA/PCA

N/A N/A

Logistics Management Information (LMI) Summaries -- Support Equipment Recommendation Data (SERD) --Standard Modified Hand Tools List

DI-ALSS-81530/T Yes 3.6.5.2

ASREQ

- SERD: 1MA eqpt ID'd

- Std Mod Hand Tool List: 4MP to first end article delivery

- Revisions ASREQ

N/A N/A

005 Supplemental Data For Provisioning DI-ALSS-81557/T Yes 3.6.5.1 Concurrent with delivery of Provisioning Technical Documentation (PTD) to PPA

Concurrent with delivery of Provisioning Technical Documentation (PTD) to PPA

N/A

006 Engineering Change Proposal (ECP) DI-CMAN-80639C/T Yes 3.1.4.2 ASREQ ASREQ ASREQ 007 Request for Deviation (RFD) DI-CMAN-80640C/T Yes 3.1.4.3 ASREQ ASREQ ASREQ

Configuration Audit Summary Report

(CASR)

-- Functional Configuration Audit and Physical Configuration Audit (FCA/PCA) Reports

DI-CMAN-81022C/T No 3.1.4.1

ONE/R

- 1MA FCA/PCA complete

- Revisions ASREQ to incorporate AI disposition

N/A N/A

009 Interface Control Document (ICD) DI-CMAN- 81248A/T Yes 3.2.2.2

ASREQ

- Draft 1MP CDR

- Revisions ASREQ

- Final 14CD after govt apprvl of

PCA.

N/A N/A

010 Request for Nomenclature (DD Form 61)

DI-CMAN-

81254A/T Yes 3.1.4.5 ASREQ

- 6MA CDR

ASREQ

- Revisions only if there is a design change or by PCO direction.

ASREQ

- Revisions only if there is a design change or by PCO direction.

011 Electromagnetic Interference Test Procedures DI-EMSC-80201C Yes 3.5.1

ASREQ

- Draft 3MP @ test for govt disposition

- Final 30DA govt apprvl of draft

N/A N/A

012 Electromagnetic Interference Test Report DI-EMSC-80200C Yes 3.5.1

ONE/R

- 1MA @ test completion

- Revisions ASREQ

N/A N/A

TITLE DID Apprvl SOW Para EX B Delivery Schedule EX C Delivery Schedule EX D Delivery Schedule

013 TEMPEST Test Plan DI-EMCS-81683 Yes 3.3

ASREQ

- Draft 1MP CDR - Info only

- Revisions ASREQ

- Final 60DPTT for govt disposition

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

014 TEMPEST Test Evaluation Report DI-EMCS-81684 Yes 3.3

ONE/R

- 1MA test for govt disposition

- Revisions ASREQ

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

015 TEMPEST Control Plan DI-EMCS-81687 Yes 3.3

ONE/R

- Draft 1MP PDR for govt disposition

- Revisions ASREQ

- Final 1MA govt apprvl of Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

016 Nuclear Hardness & Survivability Design Analysis Report DI-ENVR-80266/T Yes 3.2.11

ASREQ

- Prelim 1MP CDR

- Final 2MP FCA/PCA for govt apprvl

- Revisions ASREQ

N/A N/A

Cost Data Summary Report DD Form 1921)

- Contractor Cost Data Reporting (CCDR)

DI-FNCL-

81565C/T Yes 3.1.5.4

ASREQ

IAW CSDR Plan (atch 14) Revisions ASREQ

ASREQ

IAW CSDR Plan (atch 14) Revisions ASREQ

ASREQ

IAW CSDR Plan (atch 14) Revisions ASREQ

Functional Cost-Hour Report DD Form 1921-1

- Contract Cost Data Reporting (CCDR)

DI-FNCL-

81566C/T Yes 3.1.5.4

ASREQ

IAW CSDR Plan (atch 14) Revisions ASREQ

ASREQ

IAW CSDR Plan (atch 14) Revisions ASREQ

ASREQ

IAW CSDR Plan (atch 14) Revisions ASREQ

Interim Contractor Support (ICS) Parts Usage and Maintenance Data Collection Report

DI-ILSS-81226/T Yes 3.7.1

MTHLY

- Initial - 1MA first EDM install

- MTHLY thereafter 27th day

- Revisions ASREQ

MTHLY

- Initial - 1MA first EDM install

- MTHLY thereafter

- Revisions ASREQ

MTHLY

- Initial - 1MA first EDM install

- MTHLY thereafter

- Revisions ASREQ

020 Failure Mode Effects, and Critical Analysis Report (FMECA) DI-ILSS-81495 Yes 3.2.5

ASREQ

- 90DA CDR

- Final 60DP FCA/PCA

- Revisions ASREQ

021 Software Development Plan (SDP) DI-IPSC-81427A/T Yes 3.4

ASREQ

- Draft 30DP SRR for govt disposition

- Revisions ASREQ

- Final 30DA govt apprvl of Draft

- Updates annually thereafter

1YA CDR

ANNLY 1YA CDR ANNLY 1YA CDR

022 Software Transition Plan DI-IPSC-81429A/T Yes 3.6.9

ASREQ

- Prelim 3MA CDR

- Revisions ASREQ

- Draft 1MA FCA/PCA

- Revisions ASREQ

- Final 30DA Govt apprvl of Draft

R/ASR

Revisions as required

R/ASR

Revisions as required

023 System / Subsystem Specification (SSS) DI-IPSC-81431A/T Yes 3.2.2.1

ASREQ

- Prelim 6WP SRR

- Interim 6WP PDR

- Draft 6WP CDR

- Final 30DA govt apprvl of Final Draft

R/ASR

- Draft change pages in conjunction with C008, ECP

- Final change pages 15DA contract mod award incorporating ECP into the contract

R/ASR

- Draft change pages in conjunction with D008, ECP

- Final change pages 15DA contract mod award incorporating ECP into the contract

024 Software Requirements Specification (SRS) DI-IPSC-81433A/T Yes 3.4

ASREQ

- Prelim 2MP PDR - info only

- Interim 2MP CDR for govt disposition

- Final Draft 2MP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Draft

R/ASR

- Draft change pages in conjunction with C008, ECP

- Final change pages 15DA contract mod award incorporating ECP into the contract

R/ASR

- Draft change pages in conjunction with D008, ECP

- Final change pages 15DA contract mod award incorporating ECP into the contract

025 Software Design Description (SDD) DI-IPSC-81435A Yes 3.4

ASREQ

- Prelim 45DP PDR - info only

- Interim 30DA CDR for govt disposition

- Revisions ASREQ

- Final Draft 30DP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Draft

R/ASR

Revisions as required

R/ASR

Revisions as required

026 Software Test Plan (STP) DI-IPSC-81438A Yes 3.4

ASREQ

- Prelim 30DP CDR - info only

- Final Draft 2MP @ SQT for govt disposition

- Revisions ASREQ

- Final 30DA govt apprvl of Final Draft

R/ASR

Revisions as required

R/ASR

Revisions as required

027 Software Test Description (STD) DI-IPSC-81439A Yes 3.4

ASREQ

- Draft 2MP @ SQT for govt disposition

- Revisions ASREQ

- Final 30DA govt apprvl of Draft

R/ASR

Revisions as required

R/ASR

Revisions as required

028 Software Test Report (STR) DI-IPSC-81440A Yes 3.4

ONE/R

- 1MA @ SQT for govt apprvl

- Revisions ASREQ

029 Software Product Specification -- Software Products / Systems DI-IPSC-81441A Yes 3.4

ASREQ

- Prelim 2MP @ SQT - info only

- Revisions ASREQ

- Draft 1MP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Draft

ASREQ

- Draft change pages in conjunction with C008, ECP

- Final change pages 15DA contract mod award incorporating ECP into the contract

ASREQ

- Draft change pages in conjunction with D008, ECP

- Final change pages 15DA contract mod award incorporating ECP into the contract

030 Software Version Description (SVD) DI-IPSC-81442A/T No 3.4

ONE/R

- Initial with initial release of SW

- Final with @ SW version released or @ IA update

ONE/R

- Initial with initial release of

SW

- Final with @ SW version released or @ IA update

ONE/R

- Initial with initial release of

SW

- Final with @ SW version released or @ IA update

031 Corrosion Prevention and Control Plan DI-MFFP-81403 Yes 3.2.10

ASREQ

- Draft 1MP CDR for govt disposition

- Revisions ASREQ

- Final Draft 1MP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Final Draft

R/ASR

- Revisions as required for govt disposition

- Final 30DA govt apprvl of Revision

R/ASR

- Revisions as required for govt disposition

- Final 30DA govt apprvl of Revision

Management Plan -- Manufacturing Readiness Assessment and Report -- Manufacturing Maturation Plan

DI-MGMT

80004A/T No 3.9.1, 3.9.2

ASREQ

- MRA Assessment: 30DP CDR

- Maturation Pl: 60DP FCA/PCA

- Revisions ASREQ

Exhibit A

TITLE DID Apprvl SOW Para EX B Delivery Schedule EX C Delivery Schedule EX D Delivery Schedule

033 Contract Work Breakdown Structure

(CWBS)

DI-MGMT-

81334D/T Yes 3.1.5.1

ASREQ

- Draft 2MACA

- Final 30DA govt apprvl of Draft

- Updates as the result of contractual modifications of scope change

ASREQ

- Draft 2MACA

- Final 30DA govt apprvl of Draft

- Updates as the result of contractual modifications of scope change

ASREQ

- Draft 2MACA

- Final 30DA govt apprvl of Draft

- Updates as the result of contractual modifications of scope change

034 Data Accession List (DAL) DI-MGMT- 81453A No 3.1.6.1

SEMIA

- Initial: 6MACA

- Subsequent: semi-annually

SEMI-ANNLY SEMI-ANNLY

035 Contract Performance Report (CPR) DI-MGMT- 81466/T Yes 3.1.5.3

MTHLY

- First Sub end of the Ktr's 2nd acctg period

- Format 1: Mthly 25thCD for Govt disposition

MTHLY

- First Sub end of the Ktr's 2nd acctg period

- Format 1: Mthly 25thCD for Govt disposition

N/A

036 Contract Funds Status Report (CFSR) DI-MGMT- 81468/T Yes 3.1.5.3

QTRLY

- First Sub end of the Ktr's 1st acctg period

- Qtrly, 25th DA end of calendar quarter.

037 Integrated Master Schedule (IMS) DI-MGMT- 81650/T Yes 3.1.4.2

OTIME

-- Submit 1 month after contract award

OTIME

-- Submit 1 month after exercise of option

OTIME

-- Submit 1 month after exercise of option

038 Communication Security (COMSEC) Anonymity Plan DI-MGMT-81717C Yes 3.3

ASREQ

- Draft 1MP PDR for govt disposition

- Revisions ASREQ

- Final 30DA govt apprvl of Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

Software Resources Data Report: Initial Developer Report and Data Dictionary (DD Form 2630-2)

DI-MGMT-

81739B/T Yes 3.1.5.5

ONE/R

- IAW CSDR Plan (atch 14)

- Revisions ASREQ

N/A N/A

Software Resources Data Report: Final Developer Report and Data Dictionary (DD Form 2630-2)

DI-MGMT-

81740A/T Yes 3.1.5.5

ONE/R

- IAW CSDR Plan (atch 14)

- Revisions ASREQ

041 Information Assurance (IA) Design Review Information Package (DRIP)

DI-MGMT-

81845/T Yes 3.3

ASREQ

- Prelim 1MP PDR - info only

- Draft 1MP CDR - info only

- Updated Draft 30DP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Updated Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

042 Technical Report - Study/Services -- Project Support Agreements (PSA)

DI-MISC-

80508B/T Yes 3.8, 3.8.1

ASREQ

- Initial PSA due 3MA initial site survey.

- Update to PSA NLT 4MP install start date for ea grd cmd post terminal.

- Final Rpt with instln & chkout results and as-built dwgs updated with redlines incorporated 2MA installation.

ASREQ

- Initial PSA due 3MA initial site survey.

- Update to PSA NLT 4MP install start date for ea grd cmd post terminal.

- Final Rpt with instln & chkout results and as-built dwgs updated with redlines incorporated 2MA installation.

ASREQ

- Initial PSA due 3MA initial site survey.

- Update to PSA NLT 4MP install start date for ea grd cmd post terminal.

- Final Rpt with instln & chkout results and as-built dwgs updated with redlines incorporated 2MA installation.

043 Scientific and Technical Report -- Interface & Operators Guide

DI-MISC-

80711A/T Yes 3.3

ASREQ

- Draft 3MP FCA/PCA - info only

- Draft 1MP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

044 Scientific and Technical Report -- Security Production Assurance

DI-MISC-

80711A/T Yes 3.3

ASREQ

- Draft 1MP CDR - info only

- Final Draft 30DP FCA/PCA for govt disposition

- Final 30 days after govt apprvl of Final Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

Scientific and Technical Report -- IOT&E Documentation Review Support

DI-MISC-

80508B/T No 3.5.5

ASREQ

- IOT&E Test Plan - Submit 30 days after receipt of Government provided IOT&E Test Plan.

- IOT&E Test Procedures - Submit 60 days after receipt of Government provided IOT&E Test Procedures.

ASREQ

- IOT&E Test Report - Submit 30 days after receipt of Government provided IOT&E Test Report.

N/A

046 Scientific and Technical Report -- Airborne Integrator CPT Support

DI-MISC-

80711A/T Yes 3.8.2

- Initial report will be submitted 1 Quarter after start of CDR

- Draft Reports will be submitted NLT 14 days after reporting period.

- Final Report will be submitted NLT 60 days after completion.

- Initial report will be submitted 1 Quarter after start of CDR

- Draft Reports will be submitted NLT 14 days after reporting period.

- Final Report will be submitted NLT 60 days after completion.

N/A

Automated Computer Program Identification Number (ACPIN) Data and Control Record

DI-MISC-81454B Yes 3.1.4.6 ASREQ

- 2MA NMN apprvl

ASREQ

- 2MA NMN apprvl

ASREQ

- 2MA NMN apprvl

Key Management Plan -- Key Management Plan & Benign Fill Requirements

DI-MISC-81688 Yes 3.3

ASREQ

- Prelim 1MP PDR - info only

- Draft 1MP CDR for govt disposition

- Final 30DA govt apprvl of Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

049 Security Evaluation Document (SED) DI-MISC-81762 Yes 3.3

ASREQ

- Prelim Draft 14DA SRR - info only

- Initial Draft 14DP PDR - info only

- Draft 1MP CDR for govt disposition

- Final Draft 30DP FCA/PCA for govt disposition

- Final 30DA govt apprvl of Final Draft

R/ASR

Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.)

Exhibit A

TITLE DID Apprvl SOW Para EX B Delivery Schedule EX C Delivery Schedule EX D Delivery Schedule

050 Test / Inspection Reports DI-NDTI-80809B Yes

3.5.1, 3.5.2, 3.5.3, 3.5.4

ONE/R

- 1MA completion @ test for govt disposition

- Revisions ASREQ

ASREQ

- 1MA completion @ test for govt disposition

- Revisions ASREQ

ASREQ

- 1MA completion @ test for govt disposition

- Revisions ASREQ

Test and Evaluation Program Plan

- Test and Evaluation Program Plan for Development

- Acceptance Test Plan

DI-NDTI-81284/T Yes 3.5.1, 3.5.2

ASREQ

- Initial Draft 1MP PDR

- Update 1MP CDR

- Revisions ASREQ

N/A N/A

First Article Qualification Test Plan and Procedures

- First Article Qualification Test Plan

DI-NDTI-81307A Yes 3.5.2

ONE/R

- Draft 1MP FCA/PCA for govt disposition

- Revisions ASREQ

R/ASR

- Revisions ASREQ for govt disposition

- Final 30DA govt apprvl of Revision

R/ASR

- Revisions ASREQ for govt disposition

- Final 30DA govt apprvl of Revision

053 Nuclear Survivability Assurance Plan -- Hardness Assurance Plan DI-NUOR-80926/T Yes 3.2.11

ASREQ

- 1MP SRR

- 1MP FCA/PCA

- Revisions ASREQ

N/A N/A

054 GIDEP Annual Progress Report -DMS/MS Reporting DI-QCIC-80127A No 3.9.4.1 ANNLY ACA ANNLY ACA ANNLY ACA

Security Verification Plan & Procedures -- Security Verification (SV) Plan / Cryptographic Verification (CV) Plan

DI-QCIC-81689 Yes 3.3

ASREQ

- Plan:

--Initial 2WP PDR - info only -- Draft 30DP CDR - info only -Procedures:

--Draft 2MP @ test for govt disposition --Final 30DA govt apprvl of @ Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

Security Verification (SV) Report --Cryptographic Verification/Security Verification (CV/SV) Report

DI-QCIC-81690 Yes 3.3

ONE/R

- 1MA completion of @ test for govt disposition

- Revisions ASREQ

ASREQ

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

ASREQ

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

In-Process Accounting Procedures Plan --In-Process Accounting Procedures Documentation

DI-QCIC-81691A Yes 3.3

ASREQ

-Prelim Draft 30DA PDR - info only

- Draft 1MP CDR for govt disposition

- Final 30DA govt apprvl of CDR Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

058 Failed Item Analysis Report DI-RELI-80253 No 3.7.3.1, 3.7.3.2

MTHLY

- 60DA first EDM delivery

- Subsequent MTHLY 10thD

MTHLY 10thD MTHLY 10thD

059 Failure Summary and Analysis Report DI-RELI-80255 No 3.2.4 MTHLY- 60DA CDR- Subsequent MTHLY 10thD MTHLY 10thD MTHLY 10thD

060 Reliability Prediction and Documentation of Supporting Data DI-RELI-81497/T Yes 3.2.12

ONE/R

- 1MP CDR for govt disposition

- Revisions ASREQ

N/A N/A

061 System Safety Hazard Analysis (SSHA) Report DI-SAFT-80101B Yes 3.2.9

ASREQ

- Initial 1MP PDR - info only

- Update 1MP @SSWG - info only

- Update 1MP FCA/PCA for govt disposition

- Final 30DA govt apprvl of FCA/PCA update

ASREQ

- Update 1MP @SSWG

ASREQ

- Update 1MP @SSWG

062 Safety Assessment Report DI-SAFT-80102B Yes 3.2.9

ASREQ

- Draft 2MP FQT for govt disposition

- Revisions ASREQ

- Final 1MA govt apprvl of Draft

- Update Final 2MP end of program

ASREQ

- Update Final 2MP end of program

ASREQ

- Update Final 2MP end of program

063 Parts Management Plan DI-SDMP-81748 Yes 3.9.4

ASREQ

- Initial Draft 1MP SRR - info only

- Update 2MP FCA/PCA for govt disposition

- Revisions ASREQ

- Final 30DA govt apprvl of Draft

A/ASR

- Revisions as required for govt disposition

A/ASR

- Revisions as required for govt disposition

Exhibit A

TITLE DID Apprvl SOW Para EX B Delivery Schedule EX C Delivery Schedule EX D Delivery Schedule

064 Parts Management Plan --Supply Chain Risk Management Plan DI-SDMP-81748 Yes 3.3.4

ASREQ

- Prelim Draft 1MP SRR - info only

- Draft 1MP PDR for govt disposition

- Revisions ASREQ

- Final 1MA govt apprvl of Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

Training Conduct Support Document -- Operator Training Materials Development

DI-SESS-81523B/T Yes 3.6.8, 3.6.8.2

ASREQ

- CBT Trng Matl:

-- 1MP 35% IPR

-- 1MP 75% IPR

-- 1MP 100% IPR

- Final 1MA completion of 1st course presentation

- Change pages, completion of SW update

- Entire trng matl pkg at end of contract

ASREQ

- CBT Trng Matl:

-- 1MP 35% IPR

-- 1MP 75% IPR

-- 1MP 100% IPR

- Final 1MA completion of 1st course presentation

- Change pages, completion of SW update

- Entire trng matl pkg at end of contract

N/A

Training Conduct Support Document -- Maintenance Training Materials Development

DI-SESS-81523B/T Yes 3.6.8, 3.6.8.2

ASREQ

- MX Trng Matl:

-- 1MP 35% IPR

-- 1MP 75% IPR

-- 1MP 100% IPR

- Final 1MA completion of 1st course presentation

- Change pages, completion of SW update

- Entire trng matl pkg at end of contract

ASREQ

- MX Trng Matl:

-- 1MP 35% IPR

-- 1MP 75% IPR

-- 1MP 100% IPR

- Final 1MA completion of 1st course presentation

- Change pages, completion of SW update

- Entire trng matl pkg at end of contract

N/A

Training Conduct Support Document -- Computer Based Training (CBT) Materials Development

DI-SESS-81523B/T Yes 3.6.8, 3.6.8.1

ASREQ

- OP Trng Matl:

-- 1MP 35% IPR

-- 1MP 75% IPR

-- 1MP 100% IPR

- Final 1MA completion of 1st course presentation

- Change pages, completion of SW update

- Entire trng matl pkg at end of contract

ASREQ

- OP Trng Matl:

-- 1MP 35% IPR

-- 1MP 75% IPR

-- 1MP 100% IPR

- Final 1MA completion of 1st course presentation

- Change pages, completion of SW update

- Entire trng matl pkg at end of contract

N/A

Exhibit A

TITLE DID Apprvl SOW Para EX B Delivery Schedule EX C Delivery Schedule EX D Delivery Schedule

Configuration Audit Plan -- Functional Configuration Audit / Physical Configuration Audit FCA/PCA Plan

DI-SESS-81646/T Yes 3.1.4.1

ASREQ

- Block 1:

-- Draft 1MP SRR - info only -- Final 2MP FCA/PCA for govt disposition -- Revisions ASREQ

- Block 2:

-- Update 2MP FCA/PCA for govt disposition -- Revisions ASREQ

N/A N/A

Engineering Database and Configuration Management Information (EDCMI) --Configuration Control Documentation --Engineering and Drawings, Software and Configuration Management Information Database

DI-SESS-81694 Yes 3.3

ONE/R

- 1MP CDR

- Revisions ASREQ

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

070 Test Plans/ Test Procedures DI-SESS-81704/T Yes 3.5.1, 3.5.2, 3.5.4

ASREQ

- Draft 3MP @ test

- Revisions ASREQ

- Final 1MA govt apprvl of Draft

R/ASR

- Revisions as required

- Final 1MA govt apprvl of Revision

R/ASR

- Revisions as required

- Final 1MA govt apprvl of Revision

Written Course of Instruction of Key Personnel -- Maintenance Training Plan & Course of Instruction (COI)

DI-SESS-81724 No 3.3

2TIME

- Prelim Draft 30DP CDR - info only

- Interim Draft 30DP FCA/PCA -info only

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

072 Request for Waiver (RFW) DI-SESS-81732 Yes 3.1.4.4 N/A ASREQ ASREQ

073 Systems Engineering Management Plan (SEMP) DI-SESS-81785 Yes 3.2

ASREQ

- Draft 1MP SRR for govt disposition

- Revisions ASREQ

- Final 1MA govt apprvl of Draft

074 Full Maintenance Manual (Type III) DI-TMSS-81668A Yes 3.3

ASREQ

- Draft 1MP CDR

- Revisions ASREQ

- Final 1MA govt apprvl of Draft

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

R/ASR

- Revisions as required (e.g., including but not limited to ECPs, bug fixes, FQT test changes, external test changes, Government driven changes, etc.).

075 Reliability Program Plan ANSI/GEIA-STD- 0009/T Yes 3.2.12

ASREQ

- Prelim Draft 1MP PDR - info only

- Draft 1MP CDR for Govt disposition

- Revisions ASREQ

- Final 30DA govt apprvl of Draft

R/ASR

- Revisions as required for govt disposition

- Final 30DA Government approval of Revisions

R/ASR

- Revisions as required for govt disposition

- Final 30DA Government approval of Revisions

TITLE DID Apprvl SOW Para

E001 AF Technical Manual Contract Requirement TM-86-01N/T Yes 3.6.4

TITLE DID Apprvl SOW Para

F001 Product Drawings/Models & Associated Lists

DI-SESS-

81000D/T Yes 3.6.5.3, 3.6.5.5

Exhibit B

Contract Data Requirements List for CLINs 0001, 0003, 0004, 0005, and 0020, Engineering, Development and Manufacturing

For

Family of Advanced Beyond-Line-of-Sight Terminals

EXHIBIT B TABLE OF CONTENTS

CDRL

SEQ NO. TITLE/SUBTITLE DID #

B001 Contract Change Proposals (CCPs) DI-ADMN-81401B/T B002 Logistics Management Information (LMI) Data Products

-- Provisioning Technical Documentation (PTD)

DI-ALSS-81529/T

B003 Logistics Management Information (LMI) Summaries -- Repair Level Analysis

DI-ALSS-81530/T

B004 Logistics Management Information (LMI) Summaries -- Support Equipment Recommendation Data (SERD) -- Standard Modified Hand Tools List

DI-ALSS-81530/T

B005 Supplemental Data for Provisioning DI-ALSS-81557/T B006 Engineering Change Proposal (ECP) DI-CMAN-80639C/T B007 Request for Deviation (RFD) DI-CMAN-80640C/T B008 Configuration Audit Summary Report (CASR)

-- Functional Configuration Audit and Physical Configuration Audit (FCA/PCA) Reports

DI-CMAN-81022C/T

B009 Interface Control Document (ICD) DI-CMAN-81248A/T B010 Request for Nomenclature (DD Form 61) DI-CMAN-81254/T B011 Electromagnetic Interference Test Procedures (EMITP) DI-EMSC-80201C B012 Electromagnetic Interference Test Report (RMITR) DI-EMSC-80200C B013 TEMPEST Test Plan DI-EMSC-81683 B014 TEMPEST Test Evaluation Report DI-EMSC-81684 B015 TEMPEST Control Plan DI-EMSC-81687 B016 Nuclear Hardness & Survivability Design Analysis Report DI-ENVR-80266/T B017 Cost Data Summary Report (DD-Form 1921)

-- Contract Cost Data Reporting (CCDR)

DI-FNCL-81565C/T

B018 Functional Cost-Hour Report DD Form 1921-1 -- Contract Cost Data Reporting (CCDR)

DI-FNCL-81566C/T

B019 Interim Contractor Support (ICS) Parts Usage and Maintenance Data Collection Report

DI-ILSS-81226/T

B020 Failure Mode Effects, and Critical Analysis Report (FMECA) DI-ILSS-81495/T B021 Software Development Plan (SDP) DI-IPSC-81427A/T B022 Software Transition Plan DI-IPSC-81429A/T B023 System / Subsystem Specification (SSS) DI-IPSC-81431A/T B024 Software Requirements Specification (SRS) DI-IPSC-81433A/T B025 Software Design Description (SDD) DI-IPSC-81435A B026 Software Test Plan (STP) DI-IPSC-81438A B027 Software Test Description (STD) DI-IPSC-81439A B028 Software Test Report (STR) DI-IPSC-81440A B029 Software Product Specification

-- Software Products / Systems

DI-IPSC-81441A

B030 Software Version Description (SVD) DI-IPSC-81442A B031 Corrosion Prevention and Control Plan DI-MFFP-81403 B032 Management Plan

-- Manufacturing Readiness Assessment and Report -- Manufacturing Maturation Plan

DI-MGMT-80004/T

B033 Contract Work Breakdown Structure (CWBS) DI-MGMT-81334D B034 Data Accession List (DAL) DI-MGMT-81453A B035 Contract Performance Report (CPR) DI-MGMT-81466A/T B036 Contract Funds Status Report (CFSR) DI-MGMT-81468/T B037 Integrated Master Schedule (IMS) DI-MGMT-81650/T B038 Communications Security (COMSEC) Anonymity Plan DI-MGMT-81717C B039 Software Resources Data Report: Initial Developer Report and Data Dictionary

-- Software Resources Data Report: Initial Developer Report

DI-MGMT-81739B/T

B040 Software Resources Data Report: Final Developer Report and Data Dictionary -- Software Resources Data Report: Final Developer Report

DI-MGMT-81740A/T

B041 Information Assurance (IA) Design Review Information Package (DRIP) DI-MGMT-81845

B042 Technical Report – Study / Services --Project Support Agreement (PSA)

DI-MISC-80508B/T

B043 Scientific and Technical Report -- Interface & Operators Guide

DI-MISC-80711A/T

B044 Scientific and Technical Report -- Security Production Assurance

DI-MISC-80711A/T

B045 Scientific and Technical Report -- IOT&E Support Review Reports

DI-MISC-80711A/T

B046 Scientific and Technical Report -- Airborne Integrator CPT Support

DI-MISC-80711A/T

B047 Automated Computer Program Identification Number (ACPIN) Data and Control Record

DI-MISC-81454/T

B048 Key Management Plan -- Key Management Plan & Benign Fill Requirements

DI-MISC-81688

B049 Security Evaluation Document (SED) DI-MISC-81762 B050 Test / Inspection Report DI-NDTI-80809B B051 Test and Evaluation Program Plan

-- Test and Evaluation Program Plan for Development -- Acceptance Test Plan

DI-NDTI-81284

B052 First Article Qualification Test Plan and Procedures -- First Article Qualification Test Plan

DI-NDTI-81307A

B053 Nuclear Survivability Assurance Plan -- Hardness Assurance Plan

DI-NUOR-80926/T

B054 GIDEP Annual Progress Report --DMS/MS Reporting

DI-QCIC-80127A

B055 Security Verification Plan & Procedures -- Cryptographic Verification/Security Verification (CV/SV) Plan and Procedures

DI-QCIC-81689

B056 Security Verification (SV) Report -- Cryptographic Verification/Security Verification (CV/SV) Report

DI-QCIC-81690

B057 In-Process Accounting Procedures Plan -- In-Process Accounting Procedures Documentation

DI-QCIC-81691A

B058 Failed Item Analysis Report DI-RELI-80253 B059 Failure and Analysis Tracking Report DI-RELI-80255 B060 Reliability Prediction and Documentation of Supporting Data DI-RELI-81497/T B061 System Safety Hazard Analysis (SSHA) Report DI-SAFT-80101B/T B062 Safety Assessment Report DI-SAFT-80102B B063 Parts Management Plan DI-SDMP-81748 B064 Parts Management Plan

--Supply Chain Risk Management Plan

DI-SDMP-81748

B065 Training Conduct Support Document -- Operator Training Materials Development

DI-SESS-81523B/T

B066 Training Conduct Support Document -- Maintenance Training Materials Development

DI-SESS-81523B/T

B067 Training Conduct Support Document -- Computer Based Training (CBT) Materials Development

DI-SESS-81523B/T

B068 Configuration Audit Plan -- Functional Configuration Audit and Physical Configuration Audit (FCA/PCA) Plan

DI-SESS-81646/T

B069 Engineering Database and Configuration Management Information (EDCMI) -- Configuration Control Documentation -- Engineering and Drawings, Software and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .