Draft Cost Formats

View the file

Other files

File Type Posted
NOCA 04 Sept 12.pdf PDF
RFP Letter 4 v1.pdf PDF
Atch 13 - Cost Formats 20120602.xlsx XLSX spreadsheet
RFP Letter 3 v2.pdf PDF
RFP Letter 2 v1.pdf PDF
GTRD 14 May Update Errata.docx DOCX document
1 RFP 20120424 Section J.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120424.xlsx XLSX spreadsheet
Atch 13 - Cost Formats 20120416v35.xlsx XLSX spreadsheet
RFP Letter v4.pdf PDF
1 RFP 20120424 No Attachments.pdf PDF
DRAFT RFP No Attachments.pdf PDF
DRAFT RFP Section J.pdf PDF
1 RFP No Attachments and Exhibits.pdf PDF
1 RFP Section J.pdf PDF
20120323_FABT_AltSource_Revised_and_New_Docs_Available_v2.pdf PDF
Revised_GTRD_20120224_FABT_AltSouce_Special_Handling.pdf PDF
Draft RFP 3_9_12 v30 Sections A-M.pdf PDF
Draft RFP 3_9_12 v30 Exhibits and Attachments.pdf PDF
FAB_T_Industry_Day_Brief_8MAR2012_FEDBizOpps.pdf PDF
NOTICE OF CONTRACT ACTION.pdf PDF
ESC_OCI_PolicyBrief_IDB2008.ppt PPT presentation
Atch 13 - Cost Formats 20120228 v23.pdf PDF
SECTION L 20120301 cdl.pdf PDF
FAB-T RFI for 8 March 2012 Industry Day Jan 2012 V1.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120216 v3.pdf PDF
Exhibit E - Data Requirements List for TM86-01 20120223 v36.pdf PDF
Exhibit A - Instructions for Data Requirements List 20120223 v36.pdf PDF
Atch 14 - Cost and Software Data Reporting Plan.pdf PDF
Exhibit C - Data Requirements List for LRIP 20120223 v36.pdf PDF
Exhibit D - Data Requirements List for Production 20120223 v36.pdf PDF
CLIN structure V26 - 2.pdf PDF
Exhibit F - Data Requirements List for PDAL - full 20120223 v36.pdf PDF
Exhibit B - Data Requirements List for EMD 20120223 v36.pdf PDF
Atch 3 - Entrance and Exit Criteria for SRR PDR CDR 20120223.pdf PDF
Atch 1 - Statement of Work 20120223 v36.pdf PDF
Exhibit G - Data Requirements List for PDAL - sust 20120223 v36.pdf PDF
Atch 4 - Preliminary WBS.pdf PDF
Atch 9 - Terminal Delivery Schedule 20120223 v4.pdf PDF
Gov_Proposed_WBS.pdf PDF
FAB_T_Corporate_NDA.pdf PDF
SECTION_M.pdf PDF
DD Form 254.pdf PDF
SECTION_L.pdf PDF
GTRD_and_Other_Documents_Requiring_Special_Handling.pdf PDF
FA8307_12_R_0003.pdf PDF
FAB_T_Individual_NDA.pdf PDF
FAB_T_RFI_for_Industry_Day.pdf PDF
FAB_T_Industry_Day_Brief_Jan_12.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

Page 1 of 33 FA8307-12-R-0003

Attachment 13, Revision 1

Beyond-Line-of-Sight Terminals

Attachment 13

Cost Formats

For

Family of Advanced

Table of Contents

1 1.CLIN Summary

2 2. BEQ Pricing Summary

3 3. FAB-T BEQs

4 4. Terminal Pricing Table

5 5. Spares Pricing Table

6 6. Cost by WBS Production

7 7. Flight Test Pricing Table

8 8. Site Survey Pricing Table

9 9. Cost Element by CLIN

10 10. Cost by WBS SDD

11 11. WBS to CLIN Matrix SDD

12 12. WBS by GFY Matrix SDD

13 13. Cost by WBS Production

14 14. WBS to CLIN Matrix Production

15 15. WBS to GFY Matrix Production

16 16. Prime Contractor Rates

17 17. Subcontractor Rates

18 18. Bill of Material (BOM)

19 19. Price Track - CLIN

20 20. Software M-1

21 21. Software M-2

1.CLIN Summary Return to Table of Contents

CLIN

Number

Contract

Type Description Fund Type Estimated Cost Fixed Fee CPFF/FFP

0001 FFP EMD; CPT w/PNVC Initial Development 3600 $0

0002 FFP Data for CLINs 0001, 0003, 004, 005, 0020 3600

Basic CLINS TOTAL 3600 $0

CLIN

Number

Contract

Type Description Fund Type Estimated Cost Fixed Fee CPFF/FFP

0003 FFP EMD; CPT w/PNVC Only IMP Event 1 to IMP Event 2 3600 $0

0004 FFP EMD; CPT w/PNVC Only IMP Event 2 to IMP Event 3 3600 $0

0005 FFP EMD; CPT w/PNVC Only IMP Event 3 to Complete 3600 $0

0006 FFP Flight Test Aircraft 3600 $0

0007 CPFF EDM Installation 3600 $0 $0 $0

0008 FFP Data Rights 3600 $0

0009 FFP Technical Manuals 3600 $0

0010 FFP Training Classes 3600 $0

0011 CPFF Preoperational Support 3600 $0 $0 $0

0012 CPFF Airborne Platform Integration Support 3600 $0 $0 $0

0013 T&M IOT&E Support 3600 $0 $0 $0

0014 FFP Technical Data Package (Reprocurement) 3600 $0

0015 FFP Technical Data Package (Sustainment) 3600 $0

0020 FFP EMD Completion: TT&C 3600 $0

0100 FFP LRIP 1 Terminals 3010 / 3080 $0

0101 CPFF Ground Installation 3010 / 3080 $0 $0 $0

0102 FFP Data for CLINs 0100 & 0200 3010 / 3080

0103 FFP Ground Site Survey 3010 / 3080 $0

0104 FFP Initial Support Equipment 3010 / 3080

0105 FFP Provisioning Item Orders (Spares) 3010 / 3080 $0

0106 FFP IOT&E Flight Test Aircraft 3010 / 3080 $0

0200 FFP LRIP 2 Terminals 3010 / 3080 $0

0201 CPFF Ground Installation 3010 / 3080 $0 $0 $0

0300 FFP FRP 1 Terminals 3010 / 3080 $0

0301 CPFF Ground Installation 3010 / 3080 $0 $0 $0

0302 FFP Data for CLINs 0300, 0400, 0500, 0600 3010 / 3080

0400 FFP FRP 2 Terminals 3010 / 3080 $0

0401 CPFF Ground Installation 3010 / 3080 $0 $0 $0

0500 FFP FRP 3 Terminals 3010 / 3080 $0

0501 CPFF Ground Installation 3010 / 3080 $0 $0 $0

0600 FFP FRP 4 Terminals 3010 / 3080 $0

0601 CPFF Ground Installation 3010 / 3080 $0 $0 $0

1001 CPFF ICS - Hardware Maintenance 3010 / 3080 $0 $0 $0

1002 CPFF ICS - Hardware Maintenance 3010 / 3080 $0 $0 $0

1003 CPFF ICS - Hardware Maintenance 3010 / 3080 $0 $0 $0

1004 CPFF ICS - Hardware Maintenance 3010 / 3080 $0 $0 $0

1101 CPFF ICS - Software Maintenance 3010 / 3080 $0 $0 $0

1102 CPFF ICS - Software Maintenance 3010 / 3080 $0 $0 $0

1103 CPFF ICS - Software Maintenance 3010 / 3080 $0 $0 $0

1104 CPFF ICS - Software Maintenance 3010 / 3080 $0 $0 $0

Total of Option CLINs on a Cost Plus Fixed Fee basis $0 $0 $0

Total of Option CLINs on a Firm Fixed Price basis $0

Grand Total of all CLINs $0

ICS Contract Option CLINs

NOT SEPARATELY PRICED (NSP)

LRIP Contract Option CLINs

FRP Contract Option CLINs

Base Contract Cost/Price Summary by CLIN

Contract Basic CLINs

Options Cost/Price Summary by CLIN

EMD Contract Option CLINs

NOT SEPARATELY PRICED (NSP)

NOT SEPARATELY PRICED (NSP)

RESERVED

Return to Table of Contents

User Configurations

E-4 EQ

E-6 EQ

Ground Fixed - No Remoting EQ

Ground Fixed - No Remoting (TT&C) EQ

Ground Trans - No Remoting EQ

Ground Trans - No Remoting (TT&C) EQ

Remoting Ground Fixed w/ 1RN EQ

Remoting Ground Trans w/ 1RN EQ

Remoting Ground Fixed w/ 2RN EQ

Remoting Ground Trans w/ 2RN EQ

Total Cost

User Configurations

Total Spares Price (CLIN 0105)

Training Type/Location

CPT Operations and Maintenance at Contractor Facility (CLIN 0010)

CPT Operations and Maintenance Training at CONUS Gov't Facility (CLIN 0010)

Total Training Course Price

Flight Test

Mod/De-Mod & Contractor Flights (CLIN 0006)

Government Flights (CLIN 0006)

Mod/De-Mod & Government Flight (CLIN 0106)

Additional Government Flights (CLIN 0106)

Total Flight Test Price

Format does NOT require additional contractor input. For summary purposes only

Terminal Pricing Summary

Spares Pricing Summary

Flight Test Pricing Summary

Ground Terminals

Airborne Terminals

Training Class Pricing Summary

Location

CONUS (CLIN 0103)

O-CONUS (CLIN 0103)

Total Site Survey Price

FAB-T Site Survey Pricing Summary

FY14 - LRIP 1 FY15 - LRIP 2 FY16 - FRP 1 FY17 - FRP 2

FY14 - LRIP 1 FY15 - LRIP 2 FY16 - FRP 1 FY17 - FRP 2

FY2014 FY2015 FY2016 FY2017

FY14 FY15 FY16 Total

Format does NOT require additional contractor input. For summary purposes only

Terminal Pricing Summary

Spares Pricing Summary

Flight Test Pricing Summary

Ground Terminals

GFY14 GFY15 GFY16 GFY17

FY18 - FRP 3 FY19 - FRP 4 Total

FY18 - FRP 3 FY19 - FRP 4 Total

FY2018 Total

Terminal Pricing Summary

Spares Pricing Summary

Ground Terminals

GFY18 GFY19 Total

User Configurations

FY14 - LRIP 1

(0100)

FY15 - LRIP 2

(0200)

FY16 - FRP 1

(0300)

FY17 - FRP 2

(0400)

FY18 - FRP 3

(0500)

FY19 - FRP 4

(0600) Total

E-4 EQ 0 1 1 0 2 0 4

E-6 EQ 0 1 5 4 7 0 17

Ground Fixed - No Remoting EQ 3 2 6 2 5 0 18

Ground Fixed - No Remoting (TT&C) EQ 0 0 0 3 0 0 3

Ground Trans - No Remoting EQ 2 1 0 3 4 0 10

Ground Trans - No Remoting (TT&C) EQ 0 1 2 0 0 0 3

Remoting Ground Fixed w/ 1RN EQ 3 2 3 1 2 7 18

Remoting Ground Trans w/ 1RN EQ 0 0 0 0 1 5 6

Remoting Ground Fixed w/ 2RN EQ 0 0 0 2 0 0 2

Remoting Ground Trans w/ 2RN EQ 0 0 1 2 0 0 3

Total Terminals 8 8 18 17 21 12 84

Training Type/Location FY2014 FY2015 FY2016 FY2017 FY2018

CPT Operations and Maintenance at Contractor Facility (CLIN 0010) 2 2 2 2 2

CPT Operations and Maintenance Training at CONUS Gov't Facility (CLIN 0010) 2 2 2 2 2

Total Training Courses 4 4 4 4 4

Flight Test GFY14 GFY15 GFY16

Mod/De-Mod & Contractor Flights (CLIN 0006) 1 0 0

Government Flights (CLIN 0006) 3 0 1

Mod/De-Mod & Government Flight (CLIN 0106) 0 0 1

Additional Government Flights (CLIN 0106) 0 0 2

Total Flight Tests 4 0 4

Location GFY14 GFY15 GFY16 GFY17 GFY18 GFY19

CONUS (CLIN 0103) 7 8 17 14 18 10

O-CONUS (CLIN 0103) 1 0 1 3 3 2

FAB-T Site Survey BEQs

Contractor to propose spares types & quantities based on the contractor's design using 30% sparing for each yearly terminal buy, rounded up to the closest complete LRU, as the best estimated terminal quantity.

Spares BEQs: (CLIN 0105)

FAB-T BEST ESTIMATED QUANTITIES (BEQs)

FAB-T Training Class BEQs

FAB-T Flight Test BEQs

Airborne Terminals

Ground Terminals

FAB-T Terminal BEQs

User Configurations

GFY14 - LRIP 1

(0100)

GFY15 - LRIP 2

(0200)

GFY16 - FRP 1

(0300)

GFY17 - FRP 2

(0400)

GFY18 - FRP 3

(0500)

GFY19 - FRP 4

(0600)

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

E-4 Terminals

10+

E-6 Terminals

10+

Ground Fixed - No Remoting Terminals

10+

Ground Fixed - No Remoting (TT&C) Terminals

10+

Ground Trans - No Remoting Terminals

10+

Ground Trans - No Remoting (TT&C) Terminals

10+

Remoting Ground Fixed w/ 1RN Terminals

10+

Remoting Ground Trans w/ 1RN Terminals

10+

Remoting Ground Fixed w/ 2RN Terminals

10+

Remoting Ground Trans w/ 2RN Terminals

10+

FAB-T TERMINAL PRICING

Ground Terminals

CLIN Part Number Description QTY 1 QTY 2 QTY n QTY n+ LRUs in Terminal Buy Spares BEQ Extended Price

X X LRU 1 0

X X LRU 2 0

X X LRU 3 0

X X 0

X X 0

X X SRU 1 0

X X 0

X X 0

X X 0

X X 0

X X Removable Media 1 0

X X 0

X X 0

X X 0

X X 0

X X LRU Mounting 1 0

X X 0

X X 0

X X 0

X X 0

X X Rack 1 0

X X Cable 1 0

X X 0

X X 0

X X 0

X X 0

X X 0

X X 0

X X 0

X X 0

Spares Pricing: GFY14 LRIP 1 (CLIN 00105)

Contractor to propose spares types & quantities based on the contractor's design using 30% sparing for each yearly terminal buy, rounded up to the closest complete component, at the best estimated terminal quantity.

Line Replacable Units

Shop Replacable Units

Removable Media

LRU-Mounting and Cooling

Racks and Cables

Other Maintenance Items

FY2014 FY2015 FY2016 FY2017 FY2018

Quantity Unit Price Unit Price Unit Price Unit Price Unit Price

3+

FY2014 FY2015 FY2016 FY2017 FY2018

Quantity Unit Price Unit Price Unit Price Unit Price Unit Price

3+

CPT Operations and Maintenance at Contractor Facility

CPT Operations and Maintenance Training at CONUS Gov't Facility

FAB-T Training Class Pricing Type 1 Training Classes (CLIN 0010)

GFY14 GFY15 GFY16

Quantity Unit Price Unit Price Unit Price

Additional Government Flights

Mod/De-Mod & Government Flight

FAB-T Flight Test Pricing Tables

CLIN 0006

Mod/De-Mod & Contractor Flights

Government Flights

CLIN 0106

Location GFY14 GFY15 GFY16 GFY17 GFY18 GFY19

Unit Price Unit Price Unit Price Unit Price Unit Price Unit Price

CONUS

O-CONUS

FAB-T Site Survey Pricing Table

Contractor to propose cost per site survey. Varible pricing is to be provided based on the general location of the terminal.

CLIN 0103

9. Cost Elements by CLIN

Return to Table of Contents

COST ELEMENT SUMMARY FOR EACH CLIN

0001 0003 0004 0005 0006 0007 0008 0009 0010 0011 0012

EMD; CPT w/PNVC

Initial Development

EMD; CPT w/PNVC

Only IMP Event 1 to

IMP Event 2

EMD; CPT w/PNVC

Only IMP Event 2 to

IMP Event 3

EMD; CPT w/PNVC

Only IMP Event 3 to

Complete Flight Test Aircraft EDM Installation Data Rights

Technical

Manuals Training Classes

Preoperational

Support

Airborne Platform

Integration

Support

Materials $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Purchased Parts

Purchased Software

Subcontracts $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Subcontractor A

Subcontractor B

Subcontractor C

Interdivisional Transfers

Labor Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

In-Plant Engr Labor Costs

Field Engr Labor Costs

Manufacturing Labor Costs

Travel

Other Direct Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

ODC A

ODC B

ODC C

Indirect Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Procurement Overhead

Fringe

In-Plant Engineering Ovhd

Field Engineering Ovhd

Manufacturing Overhead

G&A

Subtotal Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

FCCOM

Total Estimated Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

CLIN

0013 0014 0015 0020 0100 0101 0102 0104 0105 0106 0200 0201 0300 0301 0400

IOT&E Support

Technical Data

Package

(Reprocurement)

Technical Data

Package

(Sustainment)

EMD Completion:

TT&C LRIP 1 Terminals

Ground

Installation

Data for CLINs 0100

& 0200

Initial Support

Equipment

Provisioning Item

Orders (Spares)

IOT&E Flight Test

Aircraft LRIP 2 Terminals

Ground

Installation FRP 1 Terminals

Ground

Installation FRP 2 Terminals

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

0401 0500 0501 0600 0601 1001 1002 1003 1004 1101 1102 1103 1104

Ground

Installation FRP 3 Terminals

Ground

Installation FRP 4 Terminals

Ground

Installation

ICS - Hardware

Maintenance

ICS - Hardware

Maintenance

ICS - Hardware

Maintenance

ICS - Hardware

Maintenance

ICS - Software

Maintenance

ICS - Software

Maintenance

ICS - Software

Maintenance

ICS - Software

Maintenance TOTAL

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0

$0

$0

$0

$0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

$0

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

10. Cost by WBS SDD

Return to Table of Contents

Materials Subcontracts Inter Division

L L L L WBS SubKtr A SubKtr B SubKtr C Tot SubKtr Tot SubKtr Transfers (IDT)

Description Purchased Purchased Total Labor Labor Labor Labor Labor Labor

1 2 3 4 Parts Software Materials Hours Amount Hours Amount Hours Amount Hours Amount Hours Amount Hours

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 . 1 Prime Mission Product (PMP) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 1 Modem Processor Group (MPG) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 1 1 MPG Hardware 0 0 0

1 1 1 2 MPG Software 0 0 0

1 1 1 3 MPG Integration, Assembly, Test and Checkout 0 0 0

1 1 2 Operator Interface Group (OIG) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 2 1 OIG Hardware 0 0 0

1 1 2 2 OIG Software 0 0 0

1 1 2 3 OIG Integration, Assembly, Test and Checkout 0 0 0

1 1 3 Antenna Group (AG) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 3 1 AG Hardware 0 0 0

1 1 3 2 AG Software 0 0 0

1 1 3 3 AG Integration, Assembly, Test and Checkout 0 0 0

1 1 4 Prime Mission Product Software 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 4 1 Software Product Engineering 0 0 0

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n) 0 0 0

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout 0 0 0

1 1 5 PMP Integration, Assembly, Test and Checkout 0 0 0

1 2 Platform Integration, Assembly, Test and Checkout 0 0 0

1 3 Systems Engineering 0 0 0

1 4 Program Management 0 0 0

1 5 System Test and Evaluation 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 5 1 Development Test and Evaluation 0 0 0

1 5 2 Operational Test and Evaluation 0 0 0

1 5 3 Mock-ups/System Integration Lab (SILs) 0 0 0

1 5 4 Test and Evaluation Support 0 0 0

1 5 5 Test Facilities 0 0 0

1 6 Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 6 1 Training Equipment 0 0 0

1 6 2 Training Services 0 0 0

1 6 3 Training Facilities 0 0 0

1 7 Data 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 7 1 Technical Publications 0 0 0

1 7 2 Engineering Data 0 0 0

1 7 3 Management Data 0 0 0

1 7 4 Support Data 0 0 0

1 7 5 Data Depository 0 0 0

1 8 Peculiar Support Equipment (PSE) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 8 1 PSE Test and Measurement Equipment 0 0 0

1 8 2 PSE Support and Handling Equipment 0 0 0

1 9 Common Support Equipment (CSE) 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 9 1 CSE Test and Measurement Equipment 0 0 0

1 9 2 CSE Support and Handling Equipment 0 0 0

1 10 Operational/Site Activation 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 10 1 System Assembly, Installation and Checkout on Site 0 0 0

1 10 2 Contractor Technical Support 0 0 0

1 10 3 Site Construction 0 0 0

1 10 4 Site/Ship/Vehicle Conversion 0 0 0

1 10 5 Sustainment/Interim Contractor Support 0 0 0

1 11 Industrial Facilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 11 1 Construction/Conversion/Expansion 0 0 0

1 11 2 Equipment Acquisition or Modernization 0 0 0

1 11 3 Maintenance (Industrial Facilities) 0 0 0

1 12 Initial Spares and Repair Parts 0 0 0

Note: One Cost by WBS chart will suffice to include all EMD CLINs.

WBS

Total Prime Labor

Note: Subcontractors should be identified. Subcontractor A, B, and C are placeholders to be over-written by contractor.

Note: ODC categoried should be identified. ODC A, B, and C are placeholders to be over-written by contractor.

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

Note: One Cost by WBS chart will suffice to include all EMD CLINs.

WBS

Note: Subcontractors should be identified. Subcontractor A, B, and C are placeholders to be over-written by contractor.

Note: ODC categoried should be identified. ODC A, B, and C are placeholders to be over-written by contractor.

Other Direct Costs Indirect Costs FCCOM

Total Engr Engr Mfg Total

Labor Labor Procurement Overhead Overhead Overhead Est. Cost FCCOM FCCOM

Dollars Hours Travel ODC A ODC B ODC C ODC Total Overhead Fringe In-Plant Field Site G&A (w/o FCCOM) Labor G&A

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

Total Prime Labor

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

Note: One Cost by WBS chart will suffice to include all EMD CLINs.

WBS

Note: Subcontractors should be identified. Subcontractor A, B, and C are placeholders to be over-written by contractor.

Note: ODC categoried should be identified. ODC A, B, and C are placeholders to be over-written by contractor.

Total

FCCOM FCCOM Estimated

Other Subtotal Cost

0 0 0

0 0 0

0 0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

0 0

0 0

0 0 0

0 0

0 0

0 0

11. WBS to CLIN Matrix SDD

Return to Table of Contents

0001 0003

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1) 0 0

1 . 1 Prime Mission Product (PMP) 0 0

1 1 1 Modem Processor Group (MPG) 0 0

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG) 0 0

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG) 0 0

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software 0 0

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation 0 0

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training 0 0

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data 0 0

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE) 0 0

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE) 0 0

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation 0 0

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities 0 0

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS

EMD; CPT w/PNVC

Initial Development

EMD; CPT w/PNVC Only

IMP Event 1 to IMP

Event 2

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS 0004 0005

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

EMD; CPT w/PNVC Only

IMP Event 2 to IMP

Event 3

EMD; CPT w/PNVC Only

IMP Event 3 to

Complete

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS 0006 0007

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Flight Test Aircraft EDM Installation

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS

8 9

0008 0009

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Data Rights Technical Manuals

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS

10 11

0010 0011

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Training Classes Preoperational Support

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS

12 13

0012 0013

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

IOT&E Support

Airborne Platform

Integration Support

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS 0014 0015

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Technical Data Package

(Reprocurement)

Technical Data Package

(Sustainment)

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

WBS

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

TOTALEMD Completion: TT&C

12. WBS by GFY Matrix SDD

Return to Table of Contents

L L L L WBS GFY GFY GFY GFY GFY TOTAL

1 2 3 4 Description 2012 2013 2014 2015 2016

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1) 0 0 0 0 0 0

1 . 1 Prime Mission Product (PMP) 0 0 0 0 0 0

1 1 1 Modem Processor Group (MPG) 0 0 0 0 0 0

1 1 1 1 MPG Hardware 0

1 1 1 2 MPG Software 0

1 1 1 3 MPG Integration, Assembly, Test and Checkout 0

1 1 2 Operator Interface Group (OIG) 0 0 0 0 0 0

1 1 2 1 OIG Hardware 0

1 1 2 2 OIG Software 0

1 1 2 3 OIG Integration, Assembly, Test and Checkout 0

1 1 3 Antenna Group (AG) 0 0 0 0 0 0

1 1 3 1 AG Hardware 0

1 1 3 2 AG Software 0

1 1 3 3 AG Integration, Assembly, Test and Checkout 0

1 1 4 Prime Mission Product Software 0 0 0 0 0 0

1 1 4 1 Software Product Engineering 0

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n) 0

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout 0

1 1 5 PMP Integration, Assembly, Test and Checkout 0

1 2 Platform Integration, Assembly, Test and Checkout 0

1 3 Systems Engineering 0

1 4 Program Management 0

1 5 System Test and Evaluation 0 0 0 0 0 0

1 5 1 Development Test and Evaluation 0

1 5 2 Operational Test and Evaluation 0

1 5 3 Mock-ups/System Integration Lab (SILs) 0

1 5 4 Test and Evaluation Support 0

1 5 5 Test Facilities 0

1 6 Training 0 0 0 0 0 0

1 6 1 Training Equipment 0

1 6 2 Training Services 0

1 6 3 Training Facilities 0

1 7 Data 0 0 0 0 0 0

1 7 1 Technical Publications 0

1 7 2 Engineering Data 0

1 7 3 Management Data 0

1 7 4 Support Data 0

1 7 5 Data Depository 0

1 8 Peculiar Support Equipment (PSE) 0 0 0 0 0 0

1 8 1 PSE Test and Measurement Equipment 0

1 8 2 PSE Support and Handling Equipment 0

1 9 Common Support Equipment (CSE) 0 0 0 0 0 0

1 9 1 CSE Test and Measurement Equipment 0

1 9 2 CSE Support and Handling Equipment 0

1 10 Operational/Site Activation 0 0 0 0 0 0

1 10 1 System Assembly, Installation and Checkout on Site 0

1 10 2 Contractor Technical Support 0

1 10 3 Site Construction 0

1 10 4 Site/Ship/Vehicle Conversion 0

1 10 5 Sustainment/Interim Contractor Support 0

1 11 Industrial Facilities 0 0 0 0 0 0

1 11 1 Construction/Conversion/Expansion 0

1 11 2 Equipment Acquisition or Modernization 0

1 11 3 Maintenance (Industrial Facilities) 0

1 12 Initial Spares and Repair Parts 0

Note: Please use Government Fiscal Year (1 Oct - 30 Sep).

WBS

13. Cost by WBS Prod

Return to Table of Contents

Materials Subcontracts Inter Division

L L L L WBS SubKtr A SubKtr B SubKtr C Tot SubKtr Tot SubKtr Transfers (IDT)

Description Purchased Purchased Total Labor Labor Labor Labor Labor Labor Labor

1 2 3 4 Parts Software Materials Hours Amount Hours Amount Hours Amount Hours Amount Hours Amount Hours Dollars

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 . 1 Prime Mission Product (PMP) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 1 Modem Processor Group (MPG) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 1 1 MPG Hardware 0 0 0

1 1 1 2 MPG Software 0 0 0

1 1 1 3 MPG Integration, Assembly, Test and Checkout 0 0 0

1 1 2 Operator Interface Group (OIG) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 2 1 OIG Hardware 0 0 0

1 1 2 2 OIG Software 0 0 0

1 1 2 3 OIG Integration, Assembly, Test and Checkout 0 0 0

1 1 3 Antenna Group (AG) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 3 1 AG Hardware 0 0 0

1 1 3 2 AG Software 0 0 0

1 1 3 3 AG Integration, Assembly, Test and Checkout 0 0 0

1 1 4 Prime Mission Product Software 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 1 4 1 Software Product Engineering 0 0 0

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n) 0 0 0

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout 0 0 0

1 1 5 PMP Integration, Assembly, Test and Checkout 0 0 0

1 2 Platform Integration, Assembly, Test and Checkout 0 0 0

1 3 Systems Engineering 0 0 0

1 4 Program Management 0 0 0

1 5 System Test and Evaluation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 5 1 Development Test and Evaluation 0 0 0

1 5 2 Operational Test and Evaluation 0 0 0

1 5 3 Mock-ups/System Integration Lab (SILs) 0 0 0

1 5 4 Test and Evaluation Support 0 0 0

1 5 5 Test Facilities 0 0 0

1 6 Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 6 1 Training Equipment 0 0 0

1 6 2 Training Services 0 0 0

1 6 3 Training Facilities 0 0 0

1 7 Data 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 7 1 Technical Publications 0 0 0

1 7 2 Engineering Data 0 0 0

1 7 3 Management Data 0 0 0

1 7 4 Support Data 0 0 0

1 7 5 Data Depository 0 0 0

1 8 Peculiar Support Equipment (PSE) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 8 1 PSE Test and Measurement Equipment 0 0 0

1 8 2 PSE Support and Handling Equipment 0 0 0

1 9 Common Support Equipment (CSE) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 9 1 CSE Test and Measurement Equipment 0 0 0

1 9 2 CSE Support and Handling Equipment 0 0 0

1 10 Operational/Site Activation 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 10 1 System Assembly, Installation and Checkout on Site 0 0 0

1 10 2 Contractor Technical Support 0 0 0

1 10 3 Site Construction 0 0 0

1 10 4 Site/Ship/Vehicle Conversion 0 0 0

1 10 5 Sustainment/Interim Contractor Support 0 0 0

1 11 Industrial Facilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

1 11 1 Construction/Conversion/Expansion 0 0 0

1 11 2 Equipment Acquisition or Modernization 0 0 0

1 11 3 Maintenance (Industrial Facilities) 0 0 0

1 12 Initial Spares and Repair Parts 0 0 0

Note: One Cost by WBS chart will suffice to include all LRIP and FFP CLINs.

WBS

Total Prime Labor

Note: Subcontractors should be identified. Subcontractor A, B, and C are placeholders to be over-written by contractor.

Note: ODC categoried should be identified. ODC A, B, and C are placeholders to be over-written by contractor.

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

Note: One Cost by WBS chart will suffice to include all LRIP and FFP CLINs.

WBS

Note: Subcontractors should be identified. Subcontractor A, B, and C are placeholders to be over-written by contractor.

Note: ODC categoried should be identified. ODC A, B, and C are placeholders to be over-written by contractor.

Other Direct Costs Indirect Costs FCCOM

Total Engr Engr Mfg Total

Labor Procurement Overhead Overhead Overhead Est. Cost FCCOM FCCOM FCCOM

Hours Travel ODC A ODC B ODC C ODC Total Overhead Fringe In-Plant Field Site G&A (w/o FCCOM) Labor G&A Other

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0

0 0 0

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1)

1 . 1 Prime Mission Product (PMP)

1 1 1 Modem Processor Group (MPG)

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG)

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG)

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE)

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE)

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities

1 11 1 Construction/Conversion/Expansion

1 11 2 Equipment Acquisition or Modernization

1 11 3 Maintenance (Industrial Facilities)

1 12 Initial Spares and Repair Parts

Note: One Cost by WBS chart will suffice to include all LRIP and FFP CLINs.

WBS

Note: Subcontractors should be identified. Subcontractor A, B, and C are placeholders to be over-written by contractor.

Note: ODC categoried should be identified. ODC A, B, and C are placeholders to be over-written by contractor.

Total

FCCOM Estimated

Subtotal Cost

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

14. WBS to CLIN Matrix Prod

Return to Table of Contents

L L L L WBS

Description

1 2 3 4

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1) 0

1 . 1 Prime Mission Product (PMP) 0

1 1 1 Modem Processor Group (MPG) 0

1 1 1 1 MPG Hardware

1 1 1 2 MPG Software

1 1 1 3 MPG Integration, Assembly, Test and Checkout

1 1 2 Operator Interface Group (OIG) 0

1 1 2 1 OIG Hardware

1 1 2 2 OIG Software

1 1 2 3 OIG Integration, Assembly, Test and Checkout

1 1 3 Antenna Group (AG) 0

1 1 3 1 AG Hardware

1 1 3 2 AG Software

1 1 3 3 AG Integration, Assembly, Test and Checkout

1 1 4 Prime Mission Product Software 0

1 1 4 1 Software Product Engineering

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n)

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout

1 1 5 PMP Integration, Assembly, Test and Checkout

1 2 Platform Integration, Assembly, Test and Checkout

1 3 Systems Engineering

1 4 Program Management

1 5 System Test and Evaluation 0

1 5 1 Development Test and Evaluation

1 5 2 Operational Test and Evaluation

1 5 3 Mock-ups/System Integration Lab (SILs)

1 5 4 Test and Evaluation Support

1 5 5 Test Facilities

1 6 Training 0

1 6 1 Training Equipment

1 6 2 Training Services

1 6 3 Training Facilities

1 7 Data 0

1 7 1 Technical Publications

1 7 2 Engineering Data

1 7 3 Management Data

1 7 4 Support Data

1 7 5 Data Depository

1 8 Peculiar Support Equipment (PSE) 0

1 8 1 PSE Test and Measurement Equipment

1 8 2 PSE Support and Handling Equipment

1 9 Common Support Equipment (CSE) 0

1 9 1 CSE Test and Measurement Equipment

1 9 2 CSE Support and Handling Equipment

1 10 Operational/Site Activation 0

1 10 1 System Assembly, Installation and Checkout on Site

1 10 2 Contractor Technical Support

1 10 3 Site Construction

1 10 4 Site/Ship/Vehicle Conversion

1 10 5 Sustainment/Interim Contractor Support

1 11 Industrial Facilities 0

1 11 1 Construction/Conversion/Expansion

LRIP 1 Terminals

15. WBS by GFY Matrix Prod

Return to Table of Contents

L L L L WBS GFY GFY GFY GFY GFY GFY TOTAL

1 2 3 4 Description 2014 2015 2016 2017 2018 2019

1 Family of Beyond Line-of-Sight Terminals Increment 1 (FAB-T Inc 1) 0 0 0 0 0 0 0

1 . 1 Prime Mission Product (PMP) 0 0 0 0 0 0 0

1 1 1 Modem Processor Group (MPG) 0 0 0 0 0 0 0

1 1 1 1 MPG Hardware 0

1 1 1 2 MPG Software 0

1 1 1 3 MPG Integration, Assembly, Test and Checkout 0

1 1 2 Operator Interface Group (OIG) 0 0 0 0 0 0 0

1 1 2 1 OIG Hardware 0

1 1 2 2 OIG Software 0

1 1 2 3 OIG Integration, Assembly, Test and Checkout 0

1 1 3 Antenna Group (AG) 0 0 0 0 0 0 0

1 1 3 1 AG Hardware 0

1 1 3 2 AG Software 0

1 1 3 3 AG Integration, Assembly, Test and Checkout 0

1 1 4 Prime Mission Product Software 0 0 0 0 0 0 0

1 1 4 1 Software Product Engineering 0

1 1 4 2 Computer Software Configuration Item (CPCI) (1…n) 0

1 1 4 3 Subsystem Integration, Assembly, Test and Checkout 0

1 1 5 PMP Integration, Assembly, Test and Checkout 0

1 2 Platform Integration, Assembly, Test and Checkout 0

1 3 Systems Engineering 0

1 4 Program Management 0

1 5 System Test and Evaluation 0 0 0 0 0 0 0

1 5 1 Development Test and Evaluation 0

1 5 2 Operational Test and Evaluation 0

1 5 3 Mock-ups/System Integration Lab (SILs) 0

1 5 4 Test and Evaluation Support 0

1 5 5 Test Facilities…