Draft RFP as of 1/6/12

View the file

Other files

File Type Posted
NOCA 04 Sept 12.pdf PDF
RFP Letter 4 v1.pdf PDF
Atch 13 - Cost Formats 20120602.xlsx XLSX spreadsheet
RFP Letter 3 v2.pdf PDF
RFP Letter 2 v1.pdf PDF
GTRD 14 May Update Errata.docx DOCX document
1 RFP 20120424 Section J.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120424.xlsx XLSX spreadsheet
Atch 13 - Cost Formats 20120416v35.xlsx XLSX spreadsheet
RFP Letter v4.pdf PDF
1 RFP 20120424 No Attachments.pdf PDF
DRAFT RFP No Attachments.pdf PDF
DRAFT RFP Section J.pdf PDF
1 RFP No Attachments and Exhibits.pdf PDF
1 RFP Section J.pdf PDF
20120323_FABT_AltSource_Revised_and_New_Docs_Available_v2.pdf PDF
Revised_GTRD_20120224_FABT_AltSouce_Special_Handling.pdf PDF
Draft RFP 3_9_12 v30 Sections A-M.pdf PDF
Draft RFP 3_9_12 v30 Exhibits and Attachments.pdf PDF
FAB_T_Industry_Day_Brief_8MAR2012_FEDBizOpps.pdf PDF
NOTICE OF CONTRACT ACTION.pdf PDF
ESC_OCI_PolicyBrief_IDB2008.ppt PPT presentation
Atch 13 - Cost Formats 20120228 v23.pdf PDF
SECTION L 20120301 cdl.pdf PDF
FAB-T RFI for 8 March 2012 Industry Day Jan 2012 V1.pdf PDF
Atch 10 - Variable Quantity Pricing Table 20120216 v3.pdf PDF
Exhibit E - Data Requirements List for TM86-01 20120223 v36.pdf PDF
Exhibit A - Instructions for Data Requirements List 20120223 v36.pdf PDF
Atch 14 - Cost and Software Data Reporting Plan.pdf PDF
Exhibit C - Data Requirements List for LRIP 20120223 v36.pdf PDF
Exhibit D - Data Requirements List for Production 20120223 v36.pdf PDF
CLIN structure V26 - 2.pdf PDF
Exhibit F - Data Requirements List for PDAL - full 20120223 v36.pdf PDF
Exhibit B - Data Requirements List for EMD 20120223 v36.pdf PDF
Atch 3 - Entrance and Exit Criteria for SRR PDR CDR 20120223.pdf PDF
Atch 1 - Statement of Work 20120223 v36.pdf PDF
Exhibit G - Data Requirements List for PDAL - sust 20120223 v36.pdf PDF
Atch 4 - Preliminary WBS.pdf PDF
Atch 13 - Cost Formats 20120223 v23.pdf PDF
Atch 9 - Terminal Delivery Schedule 20120223 v4.pdf PDF
Gov_Proposed_WBS.pdf PDF
FAB_T_Corporate_NDA.pdf PDF
SECTION_M.pdf PDF
DD Form 254.pdf PDF
SECTION_L.pdf PDF
GTRD_and_Other_Documents_Requiring_Special_Handling.pdf PDF
FAB_T_Individual_NDA.pdf PDF
FAB_T_RFI_for_Industry_Day.pdf PDF
FAB_T_Industry_Day_Brief_Jan_12.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Draft 6 Jan 12

SOLICITATION, OFFER AND AWARD

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)

RATING

DO-A7

PAGE OF PAGES

1 53

2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

5. DATE ISSUED

6. REQUISITION/PURCHASE NO.

FA8307-12-R-0003

7. ISSUED BY ESC/HNSK CODE FA8307 8. ADDRESS OFFER TO (If other than Item 7)

AIR FORCE MATERIEL COMMAND, USAF

ELECTRONIC SYSTEMS CENTER

5 EGLIN STREET

HANSCOM AFB, MA 01731-2100

CHRISTOPHER D. LINSKEY 781-271-1305

CHRISTOPHER.LINSKEY@HANSCOM.AF.MIL

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

SOLICITATION

9.

10. FOR

INFORMATION

CALL:

A. NAME

TIMOTHY M. FRANK

B. TELEPHONE (Include area code)

(NO COLLECT CALLS)

271-7188

C. E-MAIL ADDRESS

timothy.frank@hanscom.af.mil

11. TABLE OF CONTENTS

() SEC. DESCRIPTION PAGE(S) () SEC DESCRIPTION PAGE(S)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES 45

B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.

C DESCRIPTION/SPECS./WORK STATEMENT 25 J LIST OF ATTACHMENTS 52

D PACKAGING AND MARKING 29 PART IV - REPRESENTATIONS AND INSTRUCTIONS

E INSPECTION AND ACCEPTANCE 30 K REPRESENTATIONS, CERTIFICATIONS, K - 1

F DELIVERIES OR PERFORMANCE 31 AND OTHER STATEMENTS OF OFFERORS

G CONTRACT ADMINISTRATION DATA 33 L INSTRS, CONDS, AND NOTICES TO OFFERORS L - 1

H SPECIAL CONTRACT REQUIREMENTS 34 M EVALUATION FACTORS FOR AWARD M - 1

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____120____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS

20 CALENDAR DAYS

30 CALENDAR DAYS

CALENDAR DAYS

14. ACKNOWLEDGEMENTS OF AMENDMENTS

(The offeror acknowledges receipt of amend-

AMENDMENT NO. DATE AMENDMENT NO. DATE

ments to the SOLICITATION for offerors and related documents numbered and dated:

15A. NAME

AND

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

ADDRESS

OF

OFFEROR

15B. TELEPHONE NO. (Include area code)

15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-

TION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)

PREVIOUS EDITION IS UNUSABLE Prescribed by GSA ConWrite Version 6.13.1 FAR (48 CFR) 53.21(c) Created 06 Jan 2012 4:02 PM

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SECTION B FA8307-12-R-0003

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0001 1 __________ Lot __________ Noun: SDD AWARD TO PDR; CPT W/PNVC INCLUDING TT&C NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. The contractor shall develop the Family of Advanced Beyond-Line-of-Sight Terminal (FAB-T) Command Post Terminal (CPT) with Presidential National Voice Conferencing (PNVC) including Telemetry, Tracking and Control (TT&C) capability through PDR in accordance with the documents set forth in Section C.

B. Period of Performance: 12 months from contract award.

C. Inspection and Acceptance: After successful completion of PDR (acceptance by Government of PDR minutes), final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at time of award.

E. Target Cost:__________ Target Profit:__________ Target Price:__________ Share Ratio: 70/30 Ceiling: 120%

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0002 1 __________ Lot __________ Noun: DATA FOR CLINS 0001, 0003 & 0004 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. Data for CLIN 0001, and if options are exercised CLINs 0003, & 0004 in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit B.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0001, and if options are exercised CLINs 0003 & 0004.

C. Points of inspection and acceptance (Destination) will be IAW applicable CDRL.

0003 OPTION CLIN (supply) __________

Noun: SDD PDR TO CDR; CPT W/PNVC INCLUDING TT&C NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall develop the FAB-T CPT with PNVC including TT&C capability from PDR through CDR, including demonstration in accordance with the documents set forth in Section C. Perform site surveys for 3 ground EDMs and update prices for installation contained in option CLIN 0006.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After successful completion of CDR (acceptance by

Government of CDR minutes), final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Target Cost:__________ Target Profit:__________ Target Price:__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0004 OPTION CLIN (supply) __________

Noun: SDD CDR TO COMPLETION; CPT W/PNVC ONLY NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall finish developing the FAB-T CPT with

PNVC only from CDR through SDD completion, including 6 EDM deliveries in accordance with the documents set forth in Section C.

B. Period of Performance: 18 months from option exercise.

C. Inspection and Acceptance: After successful completion of all development efforts as evidenced by government acceptance of FCA/PCA minutes, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Target Cost:__________ Target Profit:__________ Target Price:__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0005 OPTION CLIN (supply) Noun: FLIGHT TEST AIRCRAFT NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall provide an aircraft to support both contractor desired and Government required flight testing. The contractor shall perform all necessary aircraft modifications to support terminal installation and demonstrate terminal capability in accordance with Section C.

B. Period of Performance: 18 months from option exercise.

C. Inspection and Acceptance: After successful A/C and FLT test, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be fully funded at option exercise.

E. Target Cost:__________ Target Profit:__________ Target Price:__________

0006 OPTION CLIN (service) Noun: INSTALLATION OF EDMs Descriptive Data:

A. The contractor shall install up to 3 ground EDMs and provide technical support for airborn platform installations in accordance with the documents set forth in Section C. All subsequent SubClin awards will be in accordance with Attachment 13, Manpower Pricing Tables.

B. Period of Performance: 24 months after option exercise.

C. Inspection and Acceptance: After each ground or airborne EDM has been installed, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________ Fixed Fee: $__________ Total Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0007 OPTION CLIN (supply) __________

Noun: DATA RIGHTS NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. The Contractor shall provide Government Purpose Rights for all data and software under this contract scheduled to be provided with less than Government Purpose Rights.

These data or software items will be furnished by the contractor and listed in Attachment 10, FAB-T Technical Data Furnished with Other than Unlimited Rights.

B. The Government may exercise this option for any or all of the items listed in Attachment 10. Items to be delivered with additional rights under this CLIN will be specified in the contract modification exercising this option. Total price for this CLIN will be the sum of all item prices listed.

C. Government may exercise this option anytime during the contract period of performance.

D. This contract line item is specifically to allow the Government to purchase additional rights in technical data and software, with the goal to negotiate "Government Purpose Rights" as defined by DFARS Clause 252.227-7013 and DFARS 252.227-7014. This does not negate the Government's rights under DFARS Part 227 to technical data and/or computer software and computer software documentation developed under the contract exclusively with Government funds or mixed funding.

E. Delivery Date: __ months from option exercise.

F. Inspection and Acceptance: After successful delivery of data rights, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

G. This CLIN will be fully funded at option exercise.

H. Total Price: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0008 OPTION CLIN (supply) __________

Noun: TECHNICAL MANUALS NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall provide Technical Manuals in accordance with Contract Data Requirements List, DD Form 1423,Exhibit B, CDRL ____.

B. Delivery Date: 48 months after Option 0004 has been exercised in accordance with DD Form 1423. Additionally, updates as driven by the exercise of option CLIN 0020 shall be delivered 48 months after exercise of CLIN 0020.

C. Inspection and Acceptance: After successful delivery of all technical manuals, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be fully funded at option exercise.

E. Total Price: $__________

0009 OPTION CLIN (supply) Noun: TRAINING CLASSES NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall conduct operator and maintainer type 1 training classes. If the option has been exercised before training materials are scheduled to be completed, the contractor shall use the training materials that have been developed up to the date of training class to be conducted in accordance with the documents set forth in Section C.

B. Period of Performance: 60 months from option exercise.

C. Inspection and Acceptance: After completion of each course, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be fully funded option exercise.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0020 OPTION CLIN (supply) __________

Noun: CDR TO SDD COMPLETION: CPT W/PNVC AND TT&C NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE

FOB: SOURCE

Descriptive Data:

A. If this option is exercised the contractor shall complete development for the Family of Advanced Beyond-Line-of-Sight Terminal (FAB-T) with Tracking Telemetry & Control (TT&C) in accordance with the documents set forth in Section C.

B. Period of Performance: 18 months from option exercise.

C. Inspection and Acceptance: After successful completion of TT&C development, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Target Cost:__________ Target Profit:__________ Target Price:__________

0021 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0020 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0020 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit C.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0020.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0100 OPTION CLIN (supply) Noun: LOW RATE INITIAL PRODUCTION 1 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Low Rate Initial Production in accordance with the documents set forth in Section C. Pricing for this CLIN is developed in accordance with Attachment 12, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will provide for each configuration in accordance with the documents set forth in Section C. Deliveries shall consist of 3 airborne terminals and 4 ground terminals.

B. Delivery Dates: ________, see Attachment 11, Terminal Delivery Schedule, for terminal priority list in the case of variable quantity orders.

C. Inspection and Acceptance: After each successful terminal delivery, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be fully funded at option exercise.

E. Target Cost:__________ Target Profit:__________ Target Price:__________ Share Ratio: 70/30 Under run, Over run 50/50

0101 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0100 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0100 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0100 .

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0102 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations provided in Attachment 11, Terminal Delivery Schedule, and will update the estimated prices for CLIN 0103 installations. Pricing of the site surveys will be FFP.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After acceptance of CLIN 0103 price updates, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

0103 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:

A. If this option is exercised the contractor shall perform LRIP 1 terminal installations in accordance with the agreed to schedule as outlined in each locations project support agreement. Pricing of the installations will be CPFF and will be updated following completion of CLIN 0102 site survey.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

F. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0104 OPTION CLIN (supply) Noun: INITIAL SUPPORT EQUIPMENT NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. The contractor shall provide Support Equipment as identified through the Government approved Support Equipment Requirement Document (SERD) process to install, repair and maintain terminals in accordance with the documents set forth in Section C.

B. Delivery Date: 24 months from option exercise

C. Inspection and Acceptance: After each successful delivery of support equipment, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

E. Total Price: To Be Negotiated

0105 OPTION & RESERVED CLIN (supply) Noun: PROVISIONING ITEM ORDERS NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. PIOs ordered under this CLIN are to be negotiated and shall be issued through the

ACO office.

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0200 OPTION CLIN (supply) Noun: LOW RATE INITIAL PRODUCITON 2 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Low Rate Initial Production in accordance with the documents set forth in Section C. Pricing for this CLIN is developed in accordance with Attachment 12, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will provide for each configuration in accordance with the documents set forth in Section C. Deliveries shall consist of 3 airborne terminals and 4 ground terminals.

B. Delivery Dates: ________, see Attachment 11, Terminal Delivery Schedule, for terminal priority list in the case of variable quantity orders.

C. Inspection and Acceptance: After each successful terminal delivery, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be fully funded at option exercise.

E. Target Cost:__________ Target Profit:__________ Target Price:__________ Share Ratio: 70/30 Under run, Over run 50/50

0201 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0200 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0200 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit E.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0200 .

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0202 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations provided in Attachment 11, Terminal Delivery Schedule, and will update the estimated prices for CLIN 0203 installations. Pricing of the site surveys will be FFP.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After acceptance of CLIN 0203 price updates, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

0203 OPTION CLIN (service)

Descriptive Data:

A. If this option is exercised the contractor shall perform LRIP 2 terminal installations in accordance with the agreed to schedule as outlined in each locations project support agreement. Pricing of the installations will be CPFF and will be updated following completion of CLIN 0202 site survey.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

F. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0300 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 1 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production in accordance with the documents set forth in Section C. Pricing for this CLIN is developed in accordance with Attachment 12, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will provide for each configuration in accordance with the documents set forth in Section C. Deliveries shall consist of 3 airborne terminals and 4 ground terminals.

B. Delivery Dates: ________, see Attachment 11, Terminal Delivery Schedule, for terminal priority list in the case of variable quantity orders.

C. Inspection and Acceptance: After each successful terminal delivery, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

0301 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0300 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0300 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit F.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0300 .

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0302 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations provided in Attachment 11, Terminal Delivery Schedule, and will update the estimated prices for CLIN 0303 installations. Pricing of the site surveys will be FFP.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After acceptance of CLIN 0303 price updates, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

0303 OPTION CLIN (service)

Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 1 terminal installations in accordance with the agreed to schedule as outlined in each locations project support agreement. Pricing of the installations will be CPFF and will be updated following completion of CLIN 0302 site survey.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

F. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0304 OPTION CLIN (supply) Noun: PRODUCTION SUPPORT EQUIPMENT NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. The contractor shall provide Support Equipment as identified through the Government approved Support Equipment Requirement Document (SERD) process to install, repair and maintain terminals in accordance with the documents set forth in Section C.

B. Delivery Date: 24 months from option exercise

C. Inspection and Acceptance: After each successful delivery of support equipment, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

E. Total Price: To Be Negotiated

0400 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 2 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production in accordance with the documents set forth in Section C. Pricing for this CLIN is developed in accordance with Attachment 12, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will provide for each configuration in accordance with the documents set forth in Section C. Deliveries shall consist of 3 airborne terminals and 4 ground terminals.

B. Delivery Dates: ________, see Attachment 11, Terminal Delivery Schedule, for terminal priority list in the case of variable quantity orders.

C. Inspection and Acceptance: After each successful terminal delivery, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0401 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0400 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0400 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit G.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0400 .

0402 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations provided in Attachment 11, Terminal Delivery Schedule, and will update the estimated prices for CLIN 0403 installations. Pricing of the site surveys will be FFP.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After acceptance of CLIN 0403 price updates, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

0403 OPTION CLIN (service)

Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 2 terminal installations in accordance with the agreed to schedule as outlined in each locations project support agreement. Pricing of the installations will be CPFF and will be updated following completion of CLIN 0402 site survey.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

F. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0500 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 3 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production in accordance with the documents set forth in Section C. Pricing for this CLIN is developed in accordance with Attachment 12, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will provide for each configuration in accordance with the documents set forth in Section C. Deliveries shall consist of 3 airborne terminals and 4 ground terminals.

B. Delivery Dates: ________, see Attachment 11, Terminal Delivery Schedule, for terminal priority list in the case of variable quantity orders.

C. Inspection and Acceptance: After each successful terminal delivery, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in

0501 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0500 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0500 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit H.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0500 .

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0502 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations provided in Attachment 11, Terminal Delivery Schedule, and will update the estimated prices for CLIN 0503 installations. Pricing of the site surveys will be FFP.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After acceptance of CLIN 0503 price updates, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

0503 OPTION CLIN (service)

Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 3 terminal installations in accordance with the agreed to schedule as outlined in each locations project support agreement. Pricing of the installations will be CPFF and will be updated following completion of CLIN 0502 site survey.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

F. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0600 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 4 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production in accordance with the documents set forth in Section C. Pricing for this CLIN is developed in accordance with Attachment 12, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will provide for each configuration in accordance with the documents set forth in Section C. Deliveries shall consist of 3 airborne terminals and 4 ground terminals.

B. Delivery Dates: ________, see Attachment 11, Terminal Delivery Schedule, for terminal priority list in the case of variable quantity orders.

C. Inspection and Acceptance: After each successful terminal delivery, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in

0601 OPTION CLIN (supply) __________

Noun: DATA FOR CLIN 0600 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised data for CLIN 0600 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit J.

B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0600 .

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

0602 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION

FOB: DESTINATION

Descriptive Data:

A. If this option is exercised the contractor shall conduct site surveys for installation at locations provided in Attachment 11, Terminal Delivery Schedule, and will update the estimated prices for CLIN 0603 installations. Pricing of the site surveys will be FFP.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After acceptance of CLIN 0603 price updates, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

0603 OPTION CLIN (service)

Descriptive Data:

A. If this option is exercised the contractor shall perform FRP 4 terminal installations in accordance with the agreed to schedule as outlined in each locations project support agreement. Pricing of the installations will be CPFF and will be updated following completion of CLIN 0602 site survey.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

F. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

1001 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:

A. The contractor shall provide the necessary labor and parts to support Hardware Maintenance in accordance with the documents set forth in Section C. All subsequent SubClin awards will be in accordance with Attachment 13, Manpower Pricing Tables.

B. Period of Performance: 24 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________

1101 OPTION CLIN (service) Noun: ICS - SOFTWARE MAITENANCE Descriptive Data:

A. Provide the necessary labor and software support efforts to support annual software drops in accordance with the documents set forth in Section C. All subsequent SubClin awards will be in accordance with Attachment 13, Manpower Pricing Tables.

B. Period of Performance: 12 months, starting at completion of CLIN 0020.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________

Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount

1102 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:

A. If this option is exercised the contractor shall provide the necessary labor and software support efforts to support annual software drops in accordance with the documents set forth in Section C. All subsequent SubClin awards will be in accordance with Attachment 13, Manpower Pricing Tables.

B. Period of Performance: 12 months from option exercise.

C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form

250) in accordance with the terms and conditions of the documents referenced in Sections C and J.

D. This CLIN will be incrementally funded at option exercise.

E. Estimated Cost: $__________

NO CLAUSES OR PROVISIONS IN THIS SECTION

SECTION C - DESCRIPTION/SPECS./WORK STATEMENT

SECTION C FA8307-12-R-0003

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

C001 WORK DESCRIPTION/SPECIFICATION (MAY 1997) (TAILORED)

Work called for by the contract line items specified in SECTION B shall be performed in accordance with the following:

CONTRACT LINE ITEM

NUMBERS (CLINs) DESCRIPTION/SPECIFICATIONS

0001/0003 0004/0006 0020 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1.

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

c. Family of Advanced Beyond-Line-Of-Sight Terminals Entrance and Exit Criteria for System Requirements Review (SRR), Preliminary Design Review (PDR), and Critical Design Review (CDR), Section J, Attachment 3.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

i. Family of Advanced Beyond-Line-Of-Sight Terminals Government Furnished Property, Information and Materials (GFP, GFI, GFM), Section J, Attachment 9.

j. Family of Advanced Beyond-Line-Of-Sight Terminals Contractor Data Assertions, Section J, Attachment 10.

k. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Delivery Schedule, Section J, Attachment 11.

n. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Configuration Description, Section J, Attachment 14.

0005 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1. .

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

0007 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1.

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

j. Family of Advanced Beyond-Line-Of-Sight Terminals Technical Data Furnished with Other Than Unlimited Rights, Section J, Attachment 10.

0008 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

i. Family of Advanced Beyond-Line-Of-Sight Terminals Government Furnished Property, Information and Materials (GFP, GFI, GFM), Section J, Attachment 9.

j. Family of Advanced Beyond-Line-Of-Sight Terminals Contractor Data Assertions, Section J, Attachment 10.

n. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Configuration Description, Section J, Attachment 14.

0009 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security

Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

0100/0104 0105/0200 0300/0304 0400/0500 0600 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1.

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

i. Family of Advanced Beyond-Line-Of-Sight Terminals Government Furnished Property, Information and Materials (GFP, GFI, GFM), Section J, Attachment 9.

j. Family of Advanced Beyond-Line-Of-Sight Terminals Contractor Data Assertions, Section J, Attachment 10.

k. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Delivery Schedule, Section J, Attachment 11.

0102/0103 0202/0203 0302/0303 0402/0403 0502/0503 0602/0603 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of Work (SOW), Section J, Attachment 1.

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security

Classification/Declassification Guide, Section J, Attachment 7.

i. Family of Advanced Beyond-Line-Of-Sight Terminals Government Furnished Property, Information and Materials (GFP, GFI, GFM), Section J, Attachment 9.

j. Family of Advanced Beyond-Line-Of-Sight Terminals Contractor Data Assertions, Section J, Attachment 10.

k. Family of Advanced Beyond-Line-Of-Sight Terminals Terminal Delivery Schedule, Section J, Attachment 11.

m. Family of Advanced Beyond-Line-Of-Sight Terminals Manpower Pricing Tables, Section J, Attachment 13.

1001-1102 a. Family of Advanced Beyond-Line-Of-Sight Terminals Statement of

b. Family of Advanced Beyond-Line-Of-Sight Terminals Government Technical Requirements Document (GTRD), Section J, Attachment 2.

d. Family of Advanced Beyond-Line-Of-Sight Terminals Preliminary Work Breakdown Structure (PWBS), Section J, Attachment 4.

e. Family of Advanced Beyond-Line-Of-Sight Terminals Integrated Master Schedule (IMS), Section J, Attachment 5.

f. Family of Advanced Beyond-Line-Of-Sight Terminals Contract Security Classification, DD FORM 254, Section J, Attachment 6.

g. Family of Advanced Beyond-Line-Of-Sight Terminals MILSTAR/ Advanced Extremely High Frequency (AEHF) Security Classification/Declassification Guide, Section J, Attachment 7.

i. Family of Advanced Beyond-Line-Of-Sight Terminals Government Furnished Property, Information and Materials (GFP, GFI, GFM), Section J, Attachment 9.

j. Family of Advanced Beyond-Line-Of-Sight Terminals Contractor Data Assertions, Section J, Attachment 10.

m. Family of Advanced Beyond-Line-Of-Sight Terminals Manpower Pricing Tables, Section J, Attachment 13.

ESC--C002 AFMC MP 5335.071(90) FREQUENCY AUTHORIZATION (SEP 2011)

The Contractor must ensure that radio frequencies are available to support electromagnetic radiating devices in their intended environment and that adequate protection from interference can be provided to receiving devices. Accordingly, the Contractor shall submit DD Form 1494, Application for Equipment Frequency Allocation, in triplicate to the buyer at the issuing office indicated on the cover of this document within 45 days after contract award. Instructions for preparing the form are contained in AFI 33-118, Radio Frequency Spectrum Management, and on the form itself. The DD Form 1494 will be routed through the Administrative Activity Quality Control Office indicated on the cover of the form in accordance with AFI 33-118. Upon verification of frequency requirements, the Contractor shall submit, if required, information to prepare a "Standard Frequency Action Format (SFAF) Request" to the person and address specified above. Instructions for preparing an SFAF are contained in AFI 33-118. Attention is directed to DFARS 252.235-7003, Frequency Authorization.

SECTION D - PACKAGING AND MARKING

SECTION D FA8307-12-R-0003

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

D001 PRESERVATION, PACKAGING, PACKING AND MARKING REQUIREMENTS (FEB 1997)

(TAILORED)

Items shall be packaged in accordance with the Contractor's commercial best practices to ensure undamaged arrival at destination.

SECTION E - INSPECTION AND ACCEPTANCE

SECTION E FA8307-12-R-0003

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.246-02 INSPECTION OF SUPPLIES -- FIXED-PRICE (AUG 1996)

52.246-02 INSPECTION OF SUPPLIES -- FIXED-PRICE (AUG 1996) - ALTERNATE I (JUL 1985)

52.246-05 INSPECTION OF SERVICES -- COST-REIMBURSEMENT (APR 1984)

B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES

252.246-7000 MATERIAL INSPECTION AND RECEIVING REPORT (MAR 2008)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

E001 REQUIREMENTS FOR DATA ACCEPTANCE (FINAL DD FORM 250) (MAY 1997)

The Contractor shall prepare and submit a final DD Form 250 on a one-time basis collectively accounting for all completed Exhibit Line/Subline Items which called for submission of the data by letter of transmittal.

The DD Form 250 shall include a list and an account of all data submitted by letter of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .