1 RFP No Attachments and Exhibits.pdf
PDF 479 KB Posted
- Solicitation number
- FA8307-12-R-0003
About this file
DRAFT RFP Sections A-M No Exhibits Attachments
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
26 March 12
SOLICITATION, OFFER AND AWARD
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)
RATING
DO-A7
PAGE OF PAGES
1 59
2. CONTRACT NO. 3. SOLICITATION NO. 4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
5. DATE ISSUED
6. REQUISITION/PURCHASE NO.
FA8307-12-R-0003
7. ISSUED BY ESC/HNSK CODE FA8307 8. ADDRESS OFFER TO (If other than Item 7)
AIR FORCE MATERIEL COMMAND, USAF
ELECTRONIC SYSTEMS CENTER
5 EGLIN STREET
HANSCOM AFB, MA 01731-2100
CHRISTOPHER D. LINSKEY 781-271-1305
CHRISTOPHER.LINSKEY@HANSCOM.AF.MIL
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
SOLICITATION
9.
10. FOR
INFORMATION
CALL:
A. NAME
TIMOTHY M. FRANK
B. TELEPHONE (Include area code)
(NO COLLECT CALLS)
271-7188
C. E-MAIL ADDRESS
timothy.frank@hanscom.af.mil
11. TABLE OF CONTENTS
() SEC. DESCRIPTION PAGE(S) () SEC DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES 50
B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACH.
C DESCRIPTION/SPECS./WORK STATEMENT 29 J LIST OF ATTACHMENTS 57
D PACKAGING AND MARKING 35 PART IV - REPRESENTATIONS AND INSTRUCTIONS
E INSPECTION AND ACCEPTANCE 36 K REPRESENTATIONS, CERTIFICATIONS, K - 1
F DELIVERIES OR PERFORMANCE 39 AND OTHER STATEMENTS OF OFFERORS
G CONTRACT ADMINISTRATION DATA 41 L INSTRS, CONDS, AND NOTICES TO OFFERORS L - 1
H SPECIAL CONTRACT REQUIREMENTS 42 M EVALUATION FACTORS FOR AWARD M - 1
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within ____ ____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date of receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
10 CALENDAR DAYS
20 CALENDAR DAYS
30 CALENDAR DAYS
CALENDAR DAYS
14. ACKNOWLEDGEMENTS OF AMENDMENTS
(The offeror acknowledges receipt of amend-
AMENDMENT NO. DATE AMENDMENT NO. DATE
ments to the SOLICITATION for offerors and related documents numbered and dated:
15A. NAME
AND
CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
ADDRESS
OF
OFFEROR
15B. TELEPHONE NO. (Include area code)
15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETI-
TION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)
PREVIOUS EDITION IS UNUSABLE Prescribed by GSA ConWrite Version 6.13.1 FAR (48 CFR) 53.21(c) Created 26 Mar 2012 2:47 PM
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION B FA8307-12-R-0003
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0001 1 __________ Lot __________ Noun: FAB-T CPT W/PNVC; ENGINEERING MANUFACTURING
AND DEVELOPMENT (EMD)
NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. The contractor shall start the design, development and test efforts for the Family of Advanced Beyond Line-of-Sight Terminal (FAB-T) Command Post Terminal (CPT) with Presidential National Voice Conferencing (PNVC). This CLIN also includes contractor proposed IMP event 1 at month 9 for test/demonstration of capability in accordance with the documents set forth in Section C.
B. Period of Performance: 10 months from contract award.
C. Inspection and Acceptance: After successful completion of IMP event 1, final inspection and acceptance will be evidenced by Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.
D. This CLIN will be incrementally funded at time of award.
E.
Target Cost: Contractor Proposed_________ Target Profit: Contractor Proposed_________ Target Price: Contractor Proposed_________ Share Ratio:
Under-Target Share Ratio: 100/0 Over-Target Share Ratio: 0/100 Ceiling: Contractor Proposed (NTE $70,000,000.00)_________
0002 0 __________ Lot __________ Noun: DATA FOR CLIN 0001, AND IF EXERCISED CLINS 0003, 0004, 0005, 0013 & 0020 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. Data for CLIN 0001, and if options are exercised CLIN 0003, 0004, 0005, 0013 & 0020 in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit B.
B. This CLIN is Not Separately Priced (NSP). Price is included in CLIN 0001, and If the options are exercised, prices will be included in CLINs 0003, 0004, 0005, 0013 and 0020 respective to the data reported on each CLIN.
C. Points of inspection and acceptance (Destination) will be IAW applicable CDRL.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0003 OPTION CLIN (supply) __________
Noun: FAB-T CPT W/PNVC EMD; COMPLETION OF CLIN 0001 TO
IMP EVENT 2
NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. If this option is exercised the contractor shall continue remaining design, development, and test efforts for the FAB-T CPT W/PNVC from CLIN 0001 completion through the completion of the contractor proposed IMP event 2 in accordance with the documents set forth in Section C.
B. Period of Performance: 2 months from option exercise.
C. Inspection and Acceptance: After successful completion of IMP event 2 and delivery of CDRL data, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.
D. This CLIN will be incrementally funded at option exercise.
E. Target Cost: Contractor Proposed_________ Target Profit: Contractor Proposed_________ Target Price: Contractor Proposed_________ Share Ratio:
Under-Target Share Ratio: 100/0
0004 OPTION CLIN (supply) __________
Noun: FAB-T CPT W/PNVC EMD; IMP EVENT 2 TO IMP EVENT 3 NSN: N - Not Applicable Contract type: L - FIXED PRICE INCENTIVE FIRM Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. If this option is exercised the contractor shall continue design, development, and test efforts for the FAB-T CPT from CLIN 0003 completion through completion of contractor proposed IMP event 3 in accordance with the documents set forth in Section C.
B. Period of Performance: 2 months from option exercise.
C. Inspection and Acceptance: After successful completion of IMP event 3 and delivery of CDRL data, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Sections C.
D. This CLIN will be incrementally funded at option exercise.
E. Target Cost: Contractor Proposed_________ Target Profit: Contractor Proposed_________ Target Price: Contractor Proposed_________ Share Ratio:
Under-Target Share Ratio: 100/0
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0005 OPTION CLIN (supply) Noun: FAB-T CPT W/PNVC EMD; IMP 3 TO PNVC EMD
COMPLETION
NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall finish the remaining design, development, and test efforts for the FAB-T CPT from CLIN 0004 completion through PNVC EMD completion, including 3 site surveys for ground EDMs and the delivery of 6 air and ground EDMs in accordance with the documents set forth in Section C.
B. Period of Performance: contractor proposed C. Inspection and Acceptance: After successful completion of all development efforts, final inspection and acceptance will be evidenced by a Requisition and Invoice/Shipping Document (DD Form 1149) for the 6 EDMs in accordance with the terms and conditions of the documents referenced in Section C.
D. This CLIN will be incrementally funded at option exercise.
E. Total Price: $__________
0006 OPTION CLIN (service) Noun: FLIGHT TEST AIRCRAFT Descriptive Data:
A. If this option is exercised the contractor shall provide use of an aircraft to support both contractor and Government required flight testing. The contractor shall perform all necessary aircraft modifications to support terminal installation and demonstrate terminal capability.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After successful A/C and FLT tests, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for Government flight tests are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Pricing for the flight test aircraft shall be developed for a Firm Fixed Price environment. Separate SubCLINs may be awarded for Mod / De-mod of the aircraft, contractor flights, and/or Government flights in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0007 OPTION CLIN (service) Noun: INSTALLATION OF ENGINEERING DESIGN MODELS (EDM) Descriptive Data:
A. If this option is exercised the contractor shall install 3 ground EDMs in support of CLIN 0005 in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each ground EDM has been installed, final inspection and acceptance will be evidenced by a Requisition and Invoice/Shipping Document (DD Form 1149) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for EDM installations shall be developed for a CPFF environment. This CLIN will be incrementally funded at option exercise.
E. Estimated Cost: $__________ Fixed Fee: $__________ Total: $__________
0008 OPTION CLIN (supply) Noun: DATA RIGHTS NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. The Government shall consider all data rights unlimited unless the contractor contests these rights. All data and software items shall be listed in Attachment 8, FAB-T Data Rights Assertions List, and the contractor shall provide available pricing for purchase of Government Purpose Rights for any contested rights.
B. If this option is exercised the Government may use this option to purchase any or all of the items listed in Attachment 8. Total price for this CLIN will be the sum of all items priced as Government Purpose Rights. SubCLINs may be established for the purchase of a variable amount of data rights at the prices listed in Attachment 8.
C. Government may exercise this option any time during the contract period of performance.
D. This contract line item is specifically to allow the Government to purchase additional rights in technical data and software, with the goal to obtain Government Purpose Data Rights consistent with DFARS Part 227. This does not negate the Government's rights under DFARS Part 227 to technical data and/or computer software and computer software documentation developed under the contract exclusively with Government funds or mixed funding.
E. Delivery Date: Contractor Proposed F. Inspection and Acceptance: After successful delivery of data rights, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
G. Each SubCLIN will be fully funded.
H. Total Price: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0009 OPTION CLIN (supply) __________
Noun: TECHNICAL MANUALS NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall provide Technical Manuals in accordance with Contract Data Requirements List, DD Form 1423, Exhibit B, CDRL TM-8601.
B. Delivery Date: 48 months after Option 0003 has been exercised. Additionally, updates as driven by the exercise of option CLIN 0020 shall be delivered 48 months after exercise of CLIN 0020.
C. Inspection and Acceptance: After successful delivery of all technical manuals, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
0010 OPTION CLIN (service) Noun: TRAINING CLASSES Descriptive Data:
A. If this option is exercised the contractor shall conduct operator and maintainer type 1 training classes. If the option has been exercised before training materials are scheduled to be completed, the contractor shall use the training materials that have been developed up to the date of training class to be conducted in accordance with the documents set forth in Section C.
B. Period of Performance: 60 months from option exercise.
C. Inspection and Acceptance: After completion of each course, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for training classes are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Pricing for training classes shall be developed for a Firm Fixed Price environment. Separate SubCLINs will be awarded for each training class in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0011 OPTION CLIN (service) Noun: PREOPERATIONAL SUPPORT FOR EDMS Descriptive Data:
A. The contractor shall provide the necessary labor and parts to support hardware maintenance for EDMs in accordance with the documents set forth in Section C.
B. Period of Performance: 24 months from option exercise
C. Inspection and Acceptance: After each repair has been completed, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for Preoperational shall be developed for a CPFF environment. This CLIN will be incrementally funded at option exercise.
E. Estimated Cost: $__________
0012 OPTION CLIN (service) Noun: AIRBORNE PLATFORM INTEGRATION Descriptive Data:
A. If this option is exercised the contractor shall provide technical support and equipment to airborne platform users during the contractors design, build and terminal integration test phases. The contractor shall also provide technical support to facilitate integration, installation and qualification in accordance with the documents set forth in Section C.
B. Period of Performance: 36 months from option exercise
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Certificate of Completion in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for Airborne Platform Integration shall be developed for a CPFF environment.
This CLIN will be incrementally funded at option exercise.
E. Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0013 OPTION CLIN (service) Noun: IOT&E SUPPORT Descriptive Data:
A. If this option is exercised the contractor shall provide technical and maintenance support for Initial Operational Test and Evaluation by review and execution of the Government provided IOT&E procedures in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After IOT&E is completed as evidenced by acceptance of final reports resulting from Exhibit C CDRLs, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for IOT&E Support shall be developed for a CPFF environment. This CLIN will be incermentally funded at option exercise.
E. Estimated Cost: $__________
0014 OPTION CLIN (supply) __________
Noun: SUSTAINMENT TECHNICAL DATA PACKAGE NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall provide product drawings and associated lists to enable sustainment of FAB-T terminals in accordance with the documents set forth in section C.
B. Period of performance: Contractor Proposed C. Inspection and Acceptance: After acceptance of the data package, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250), in accordance with the terms and conditions of the documents referenced in Section C.
D. This CLIN will be fully funded at option exercise.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0020 OPTION CLIN (supply) __________
Noun: TT&C EMD COMPLETION NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. If this option is exercised the contractor shall complete development of the FAB-T Block 2 capability including CPT Tracking, Telemetry & Commanding (TT&C) capability as well as deliver and install the capability into two EDM terminals in time for IOT&E in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After successful completion of TT&C development and successful upgrades of two EDMs, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0100 OPTION CLIN (supply) Noun: LOW RATE INITIAL PRODUCTION 1 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Low Rate Initial Production 1 in accordance with the documents set forth in Section C.
B. Delivery Dates: The first terminal shall be delivered no later than the fourth quarter in fiscal year 2015.
C. Inspection and Acceptance; Ground Terminals: After each successful completion of factory ATP, a partial Material Inspection and Receiving Report (DD Form 250) will be executed with a 50% withhold. After successful installation with the installation and checkout procedures, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
Inspection and Acceptance; Airborne Terminals: After terminal delivery, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0101 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:
A. If this option is exercised the contractor shall perform LRIP 1 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
E. Estimated Cost: $__________
0102 0 __________ Noun: DATA FOR CLINS 0013, 0100 & 0200 (IF EXERCISED) NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If the options are exercised data for CLINs 0013, 0100 & 0200 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit C.
B. This CLIN is Not Separately Priced (NSP). If the options are exercised, prices will be included in CLINs 0013, 0100 and 0200 respective to the data reported on each CLIN.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0103 OPTION CLIN (supply) Noun: GROUND SITE SURVEY NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall conduct site surveys for installation at locations to be provided in Attachment 9, Notional Terminal Delivery Schedule, in support of production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed
C. Inspection and Acceptance: After completion of each site survey and approval of the
PSA, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
0104 RESERVED CLIN (supply) Noun: SUPPORT EQUIPMENT NSN: N - Not Applicable Descriptive Data:
A. If this option is exercised the contractor shall provide Support Equipment as identified through the Government approved Support Equipment Requirement Document (SERD) process to install, repair and maintain terminals in accordance with the documents set forth in Section C.
B. Delivery Date: Based on SERD recommendation date
C. Inspection and Acceptance: After each successful delivery of support equipment, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
D. This CLIN will be fully funded at option exercise.
E. Total Price: To Be Negotiated
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0105 OPTION CLIN (supply) Noun: SPARES NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: SOURCE
FOB: SOURCE
Descriptive Data:
A. If this option is exercised the contractor shall provide spares to support terminal operations in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each successful completion of factory spare ATP, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form 250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for spares are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINs may be awarded to purchase any or all of the spares listed in Attachment 10 in variable quantities in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
0106 OPTION CLIN (service) Noun: IOT&E FLIGHT TEST AIRCRAFT Descriptive Data:
A. If this option is exercised the contractor shall provide use of an aircraft to support Government required IOT&E flight testing. The contractor shall perform all necessary aircraft modifications to support terminal installation in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise
C. Inspection and Acceptance: After successful A/C and FLT tests, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for Government flight tests are developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Pricing for IOT&E Flight Test Aircraft shall be developed for a Firm Fixed Price environment. Separate SubCLINs may be awarded for Mod / De-mod of the aircraft, contractor flights, and/or Government flights in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0200 OPTION CLIN (supply) Noun: LOW RATE INITIAL PRODUCTION 2 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Low Rate Initial Production 2 in accordance with the documents set forth in Section C.
B. Delivery Dates: Contractor Proposed C. Inspection and Acceptance; Ground Terminals: After each successful completion of factory ATP, a partial Material Inspection and Receiving Report (DD Form 250) will be executed with a 50% withhold. After successful installation with the installation and checkout procedures, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
Inspection and Acceptance; Airborne Terminals: After terminal delivery, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0201 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:
A. If this option is exercised the contractor shall perform LRIP 2 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
E. Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0300 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 1 NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 1 in accordance with the documents set forth in Section C.
B. Delivery Dates: Contractor Proposed C. Inspection and Acceptance; Ground Terminals: After each successful completion of factory ATP, a partial Material Inspection and Receiving Report (DD Form 250) will be executed with a 50% withhold. After successful installation with the installation and checkout procedures, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
Inspection and Acceptance; Airborne Terminals: After terminal delivery, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0301 OPTION CLIN (service) Noun: GROUND INSTALLATION Descriptive Data:
A. If this option is exercised the contractor shall perform FRP 1 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
E. Estimated Cost: $__________
0302 0 __________ Noun: DATA FOR CLINS 0300, 0400, 0500 & 0600 (IF EXERCISED) NSN: N - Not Applicable DD1423 is Exhibit: D Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If the options are exercised data for CLINs 0300, 0400, 0500 & 0600 will be provided in accordance with the Contract Data Requirements List (CDRL), DD Form 1423, Exhibit D.
B. This CLIN is Not Separately Priced (NSP). If the options are exercised, prices will be included in CLINs 0300, 0400, 0500 & 0600 respective to the data reported on each
CLIN.
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0400 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 2 NSN: N - Not Applicable DD1423 is Exhibit: D Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 2 in accordance with the documents set forth in Section C.
B. Delivery Dates: Contractor Proposed C. Inspection and Acceptance; Ground Terminals: After each successful completion of factory ATP, a partial Material Inspection and Receiving Report (DD Form 250) will be executed with a 50% withhold. After successful installation with the installation and checkout procedures, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
Inspection and Acceptance; Airborne Terminals: After terminal delivery, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0401 OPTION CLIN (service) Noun: GROUND INSTALLATION DD1423 is Exhibit: D Descriptive Data:
A. If this option is exercised the contractor shall perform FRP 2 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
E. Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0500 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 3 NSN: N - Not Applicable DD1423 is Exhibit: D Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 3 in accordance with the documents set forth in Section C.
B. Delivery Dates: Contractor Proposed C. Inspection and Acceptance; Ground Terminals: After each successful completion of factory ATP, a partial Material Inspection and Receiving Report (DD Form 250) will be executed with a 50% withhold. After successful installation with the installation and checkout procedures, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
Inspection and Acceptance; Airborne Terminals: After terminal delivery, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0501 OPTION CLIN (service) Noun: GROUND INSTALLATION DD1423 is Exhibit: D Descriptive Data:
A. If this option is exercised the contractor shall perform FRP 3 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
E. Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0600 OPTION CLIN (supply) Noun: FULL RATE PRODUCTION 4 NSN: N - Not Applicable DD1423 is Exhibit: D Contract type: J - FIRM FIXED PRICE Inspection: SOURCE Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
A. If this option is exercised the contractor shall produce the Family of Advanced Beyond- Line-of-Sight Terminal for Full Rate Production 4 in accordance with the documents set forth in Section C.
B. Delivery Dates: Contractor Proposed C. Inspection and Acceptance; Ground Terminals: After each successful completion of factory ATP, a partial Material Inspection and Receiving Report (DD Form 250) will be executed with a 50% withhold. After successful installation with the installation and checkout procedures, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
Inspection and Acceptance; Airborne Terminals: After terminal delivery, final inspection and acceptance will be evidenced by a DD Form 250 in accordance with the terms and conditions of the documents referenced in Section C. In the event that the initial spares kit identified for each site is not delivered at the time of terminal acceptance, the final DD Form 250 will not be executed and a Requisition and Invoice/Shipping Document (DD Form 1149) will be used to transfer custody and use to the customer. When the identified spares arrive the final acceptance with executed with a DD Form 250.
D. Pricing for this CLIN is developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables). Separate SubCLINS will be awarded for each configuration in accordance with the documents set forth in Section C. Each SubCLIN will be fully
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
0601 OPTION CLIN (service) Noun: GROUND INSTALLATION DD1423 is Exhibit: D Descriptive Data:
A. If this option is exercised the contractor shall perform FRP 4 terminal installations in accordance with the schedule as outlined in each locations project support agreement in accordance with the documents set forth in Section C.
B. Period of Performance: Contractor Proposed C. Inspection and Acceptance: After each terminal installation, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for ground installations shall be developed in accordance with Attachment 10, Variable Quantity Pricing Tables (B-Tables) in a CPFF environment. Separate SubCLINs may be awarded based on configuration type for CONUS, or OCONUS destinations in accordance with the documents set forth in Section C. Each SubCLIN will be fully funded.
E. Estimated Cost: $__________
1001 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $7,940,000.00.
Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
1002 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $13,148,000.00.
Estimated Cost: $__________
1003 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $18,956,000.00.
Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
1004 OPTION CLIN (service) Noun: ICS - HARDWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall provide the necessary labor and parts to support Hardware Maintenance for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $26,730,000.00.
Estimated Cost: $__________
1101 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $12,757,000.00.
Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
1102 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $13,104,000.00.
Estimated Cost: $__________
1103 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary labor and software support efforts to support software drops based on a 12 month cycle for production terminals in accordance with the documents set forth in Section C.
B. Period of Performance: 12 months from option exercise.
C. Inspection and Acceptance: After services have been rendered, final inspection and acceptance will be evidenced by a Material Inspection and Receiving Report (DD Form
250) in accordance with the terms and conditions of the documents referenced in Section C.
D. Pricing for this CLIN shall be developed for a CPFF environment. This CLIN will be fully funded at option exercise.
E. Total shall not exceed $13,881,000.00.
Estimated Cost: $__________
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
1104 OPTION CLIN (service) Noun: ICS - SOFTWARE MAINTENANCE Descriptive Data:
A. If this option is exercised the contractor shall maintain/renew any software licenses, patches, updates and Government information assurance updates needed to operate and maintain FAB-T software as well as provide the necessary…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .