Amendment 2 - KC-135 CCR Pricing Matrix.xlsx
XLSX spreadsheet 96 KB Posted
- Attached to
- KC-135 Center Console Refresh (CCR)
- Solicitation number
- FA810523RB004
About this file
This document provides pricing details for the KC-135 Center Console Refresh solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base. Key requirements include development, certification, installation and support for fuel system and flight display upgrades. Offerors must provide unit pricing and proposed profits for various contract line items covering hardware and software development, prototyping, installation kits, logistics support and training. Pricing methodologies include firm-fixed-price, fixed-price incentive fee, and cost reimbursement elements. Incentive pools reward cost control and early delivery. The period of performance spans nine years in multiple option periods.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of Changes
| Summary of Pricing Matrix Chagnes after release of Solicitation | |
| Amendment 1 | CLIN X037 - Option 3 (Year 4) quantity is reduced FROM: 6 TO: 5 |
| CLIN X027 - The unit of issue (U/I) is changed |
FROM: LOT TO: EACH
CLIN X027 - Quantities have changed:
Basic (Year 1): FROM: 1 LOT TO: 2 EACH Option 1 (Year 2): FROM: 1 LOT TO: 2 EACH Option 2 (Year 3): FROM: 1 LOT TO: 2 EACH Option 3 (Year 4): FROM: 1 LOT TO: 4 EACH Option 4 (Year 5): FROM: 1 LOT TO: 10 EACH Option 5 (Year 6): FROM: 1 LOT TO: 10 EACH Option 6 (Year 7): FROM: 1 LOT TO: 10 EACH Option 7 (Year 8): FROM: 1 LOT TO: 2 EACH Option 8 (Year 9): FROM: 1 LOT TO: 1 EACH Amendment 2 CLIN X005 -Fixed an error related to the AVERAGING to include Option 4 CLIN X0012 - Fixed an error related to the AVERAGING to include Option 4
CLIN X020:
Option 1 Qty changed FROM: 30 TO: 25 Option 2 Qty changed FROM: 30 TO: 25 Option 3 Qty changed FROM: 30 TO: 25
Added Option 3 (year 4) to the TEP average
CLIN X021:
Basic Qty changed FROM: 30 TO: 25 Option 1 Qty changed FROM: 30 TO: 25
Added Option 2 (year 3) to the TEP average
CLIN X023:
Basic Qty changed FROM: 30 TO: 25 Option 1 Qty changed FROM: 30 TO: 25
Instructions
| INSTRUCTIONS |
| 1. Complete sheets Fuel System Dev X001-X007, Flight Display Systm X008-X014, Digtl Devlpmnt Statn 0015, Prototype X016-X019, Install & Kits X020-X024, and Kits & Spares X037-X038 by providing your unit price in the YELLOW Cells, and your proposed profit in the YELLOW cells. |
| 2. Complete sheet FFP X025-X036 by providing your Firm Fixed Unit Price in the YELLOW cells. CLINs X031 contain material handling rate, and O&A labor rates. Please input your proposed material handling rate in the YELLOW cells, and labor rates in the YELLOW cells. |
| TABLE OF CONTENTS | |
| Sheet | Description |
| Calculation Methodology | Explanation of CLIN calculation methodology |
| Summary | Summary of all CLINs by Basic and Options and total. Showing Total Evaluated Price (TEP) |
| Fuel System Dev X001 - X007 | Fuel System Development CLINs (X001 - X007) |
| Flight Display Systm X008-X014 | Flight Display System Development CLINs (X008 - X014) |
| Digtl Devlpmnt Statn 0015 | Displays Development Station CLIN (0015) |
| Prototype X016 - X019 | Prototype CLINs (X016 - X019) |
| Install & Kits X020 - X024 | Installation and Kits CLINS (X020 - X024) |
| FFP X025 - X036 | FFP CLINs (X025 - X036) |
| Kits & Spares X037-X038 | Simulator Kits and Prototype Spares CLINs (X037 and X038) |
Calculation Methodology
| CLIN | Description | Contract Type | Calculation Methodology |
| X001 - X003 | Fuel System Development | FPIF | The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.) |
CLIN X004 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.
CLIN X005
CLIN X006
X004 - X007 Fuel System Development The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.
CLIN X007 is Not Separately Priced (NSP)
CLIN X004 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.
CLIN X005 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, Option 3 and Option 4.
CLIN X006 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.
| X008 - X010 | Flight Display System | FPIF | The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.) |
| X011-X014 | Flight Display System | FPIF | The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below. |
CLIN X014 is Not Separately Priced (NSP)
CLIN X011 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.
CLIN X012 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, Option 3 and Option 4.
CLIN X013 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.
| X015 | Displays Development Station | FPIF | The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.) |
| X016 - X019 | Prototype | FPIF | The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below. |
CLIN X017, X018 and X019 are Not Separately Priced (NSP)
CLIN X016 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year and Option 1.
X020 - X024 Installation and Kits FPIF The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit.
These CLINs have averaging in some years.
For the CLIN/and year listed below as averaging, the Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.
For the remaining years not averaged, the Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.)
CLIN X022 and X024 are Not Separately Priced (NSP)
X020 - The extended pricing for Option 1 and 2 will be calculated using averaging. The total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Option 1 and Option 2.
X021 - The extended pricing for the Basic Year and Option 1 will be calculated using averaging. The total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year and Option 1.
X023 - The extended pricing for Option 1 and 2 will be calculated using averaging. The total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Option 1 and Option 2.
| X025 | Production Configuration Control/Engineering Change Orders | FFP | Proposed hourly labor rate multiplied by estimated labor hours for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total proposed price for each labor category. |
| X026 | Maintenance & Repair Support | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. For Option 1 and Option 2 the extended totals will be averaged. The remaining priced years will not be averaged. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below. |
| X027 | LRU Spares | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. For the Basic Year and Option 1 the extended totals will be averaged. The remaining priced years will not be averaged. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below. |
| X028 | Training | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. For the Basic Year and Option 1 the extended totals will be averaged. The remaining priced years will not be averaged. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below. |
| X029 | CDRLS | NSP | Not Separately Priced (NSP) |
| X030 | Travel | CR | Travel, shall be cost reimbursable and shall not be used in calculating the TEP. |
| X031 | Material Handling Rate | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. |
| Labor Rate | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. | |
| X032 | Data/Intellectual Property | NSP | Not Separately Priced (NSP) |
| X0032AA | Fuel System & Flight Display System | ||
| X033 | Warranty | ||
| X034 | Earned Value Management | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. |
| X035 | Program Management | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. |
| X036 | Technical Orders | FFP | Proposed unit price multiplied by the evaluation quantity for the Basic Year and Options Periods 1-4. The extended total for each performance period is then added to calculate the total CLIN price. |
| X037 | Simulator Kits | FPIF | The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.) |
| X038 | Prototype Spares |
Summary
| OFFEROR |
| Input Offeror Name here |
| KC-135 Center Console Refresh (CCR) |
| Best Estimated Quantities (BEQ) | Proposed Unit Prices / Ceiling Prices | Proposed Total Extended Price | ||||||||||||||||||||||||||||||
| CLIN | Description | Contract Type | Unit of Issue | Basic Year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Option 6 | Option 7 | Option 8 | Basic Year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Option 6 | Option 7 | Option 8 | Basic Year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Option 6 | Option 7 | Option 8 | Total Evaluated Price by CLIN | |
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | ||||||
| FY24-25 | FY25-26 | FY26-27 | FY27-28 | FY28-29 | FY29-30 | FY30-31 | FY31-32 | FY32-33 | ||||||||||||||||||||||||
| FUEL SYSTEM DEVELOPMENT | ||||||||||||||||||||||||||||||||
| X001 | Fuel Interface Line Replaceable Unit (LRU) Development – PDR (Min Order) | FPIF | LOT | 1 | Pricing only occurs in the basic year | $0.00 | Pricing only occurs in the basic year | $0.00 | Pricing only occurs in the basic year | $0.00 | ||||||||||||||||||||||
| X002 | Fuel Interface LRU Development – CDR | FPIF | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| X003 | Fuel System Software DevOps –IDR | FPIF | LOT | 1 | 1 | Pricing only occurs in Basic Year and Option 1 | $0.00 | $0.00 | Pricing only occurs in the basic year | $0.00 | $0.00 | Pricing only occurs in the basic year | $0.00 | |||||||||||||||||||
| Average Years 1-4 | X004 | Fuel System Certification Black Label Hardware and Software | FPIF | LOT | 1 | 1 | 1 | 1 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | ||||||||||||
| Average Years 1-5 | X005 | Fuel System Qualification/Developmental/Operational Testing | FPIF | LOT | 1 | 1 | 1 | 1 | 1 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | |||||||||
| Average Years 1-4 | X006 | Fuel Systems - Systems Integration Laboratory (SIL) | FPIF | LOT | 1 | 1 | 1 | 1 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | ||||||||||||
| X007 | Fuel System Development - Fuel System Support Equipment | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| FLIGHT DISPLAYS SYSTEM DEVELOPMENT | ||||||||||||||||||||||||||||||||
| X008 | Flight Display System LRUs Development – PDR (Min Order) | FPIF | LOT | 1 | Pricing only occurs in the basic year | $0.00 | Pricing only occurs in the basic year | $0.00 | Pricing only occurs in the basic year | $0.00 | ||||||||||||||||||||||
| X009 | Flight Display System LRUs Development – CDR | FPIF | LOT | 1 | $0.00 | $0.00 | $0.00 | |||||||||||||||||||||||||
| X010 | Flight Display System Software DevOps – IDRs | FPIF | LOT | 1 | 1 | Pricing only occurs in Basic Year and Option 1 | $0.00 | $0.00 | Pricing only occurs in the basic year | $0.00 | $0.00 | Pricing only occurs in the basic year | $0.00 | |||||||||||||||||||
| Average Years 1-4 | X011 | Flight Display System Certification- Black Label Hardware and Software | FPIF | LOT | 1 | 1 | 1 | 1 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | ||||||||||||
| Average Years 1-5 | X012 | Flight Display System Qualification/Developmental/Operational Testing | FPIF | LOT | 1 | 1 | 1 | 1 | 1 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | |||||||||
| Average Years 1-4 | X013 | Flight Display System Systems Integration Laboratory (SIL) | FPIF | LOT | 1 | 1 | 1 | 1 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Basic, Option 1, 2, and 3 | $0.00 | ||||||||||||
| X014 | Flight Display System Development - Flight Display System Support Equipment | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| DISPLAY DEVELOPMENT STATION | ||||||||||||||||||||||||||||||||
| X015 | Display Development Station (Min Order) | FPIF | LOT | 1 | Pricing only occurs in the basic year | $0.00 | Pricing only occurs in the basic year | $0.00 | Pricing only occurs in the basic year | $0.00 | ||||||||||||||||||||||
| PROTOTYPE | ||||||||||||||||||||||||||||||||
| Average Year 1-2 | X016 | Two (2) Prototypes - Prototype Installation/Post Install Checkout (PICO) | FPIF | EA | 2 | 2 | Pricing only occurs in Basic Year and Option 1 | $0.00 | $0.00 | Pricing only occurs in Basic Year and Option 1 | $0.00 | $0.00 | Pricing only occurs in Basic Year and Option 1 | $0.00 | ||||||||||||||||||
| X017 | Prototype A-KIT Tech Data Package | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| X018 | Prototype A-KIT Tech Data Package | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| X019 | Prototype Support Equipment | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| Installation and Kits | ||||||||||||||||||||||||||||||||
| Average Year 2-4 | X020 | Installation | FPIF | EA | No pricing | 25 | 25 | 25 | 75 | 75 | 73 | 10 | 15 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Average Year 1-3 | X021 | Production A-Kits | FPIF | EA | 25 | 25 | 25 | 75 | 75 | 73 | 10 | 15 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No pricing | $0.00 |
| X022 | A-KIT Support Equipment | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| Average Year 1-3 | X023 | Production B-Kits | FPIF | EA | 25 | 25 | 25 | 75 | 75 | 73 | 10 | 15 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No pricing | $0.00 |
| X024 | B-KIT Support Equipment | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| Firm Fixed Price | ||||||||||||||||||||||||||||||||
| X025 | Production Configuration Control/Engineering Change Orders | FFP | Hourly Rate | 500 | 500 | 500 | 500 | 500 | 500 | 500 | 500 | 500 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Average Year 2-3 | X026 | Maintenance & Repair Support | FFP | LOT | No pricing | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Average Year 1-2 | X027 | LRU Spares | FFP | EACH | 2 | 2 | 2 | 4 | 10 | 10 | 10 | 2 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Average Years 1-2 | X028 | Training | FFP | LOT | 1 | 1 | 1 | 1 | 1 | Pricing only occurs in Basic Option 1, 2, 3 and 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Pricing only occurs in Baisic Option 1, 2, 3 and 4 | $0.00 | |||||||||
| X029 | CDRLS | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| X030 | Travel | CR | LOT | Not Evaluated | Not Evaluated | Not Evaluated | ||||||||||||||||||||||||||
| X031 | Over and Above | FFP | LOT | |||||||||||||||||||||||||||||
| 1 | Material Handling Rate | FFP | LOT | $3,000.00 | $3,000.00 | $5,000.00 | $75,000.00 | $225,000.00 | $225,000.00 | $225,000.00 | $30,000.00 | $45,000.00 | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% | $3,000.00 | $3,000.00 | $5,000.00 | $75,000.00 | $225,000.00 | $225,000.00 | $225,000.00 | $30,000.00 | $45,000.00 | $836,000.00 | |
| 2 | Labor Rate | FFP | Hourly Rate | 65 | 130 | 1 | 1625 | 4875 | 4875 | 4875 | 650 | 975 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| X032 | Data/Intellectual Property | NSP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| X0032AA | Fuel System & Flight Display System | FFP | LOT | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| X033 | Warranty | FFP | NSP | NSP | NSP | NSP | ||||||||||||||||||||||||||
| X034 | Earned Value Management | FFP | LOT | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| X035 | Program Management | FFP | LOT | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| X036 | Technical Orders | FFP | LOT | 1 | 1 | 1 | 1 | 1 | No Pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No Pricing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | No Pricing | $0.00 | ||||||||||
| Simulator Kits & Prototype Spares | ||||||||||||||||||||||||||||||||
| X037 | Simulator Kits | FPIF | LOT | 1 | No Pricing | 7 | 5 | 6 | No Pricing | $0.00 | No Pricing | $0.00 | $0.00 | $0.00 | No Pricing | $0.00 | No Pricing | $0.00 | $0.00 | $0.00 | No Pricing | $0.00 | ||||||||||
| X038 | Prototype Spares | FPIF | LOT | 2 | 2 | No Pricing | $0.00 | $0.00 | No Pricing | $0.00 | $0.00 | No Pricing | $0.00 | |||||||||||||||||||
| Basic Year | Option 1 | Option 2 | Option 3 | Option 4 | Option 5 | Option 6 | Option 7 | Option 8 | $836,000.00 |
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | |
| Total per Basic & Option years** | $3,000.00 | $3,000.00 | $5,000.00 | $75,000.00 | $225,000.00 | $225,000.00 | $225,000.00 | $30,000.00 | $45,000.00 |
Total Evaluated Price (TEP)* = $836,000.00
Notes
Averaged CLINs: Since it is not known when the ordering will take place on the averaged CLINS in ORANGE, CLINs are priced for each year, and then averaged in order to calculate the TEP.
*Because the government does not know when ordering will take place for the ORANGE averaged CLINs the governments TEP calcuation takes into account the average price for those CLINs and it is for evaluation purposes ONLY.
**The total per basic & Option years will not add up to the TEP. Because some CLINs are averaged this total takes into account the estimated total per year that utilizes the proposed unit price/ceiling price.
Fuel System Dev X001-X007
| Offeror: | Input Offeror Name here | |||||||||||||||||||
| Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars. | ||||||||||||||||||||
| Note: FPIF CLINs will be evaluated at the Price Ceiling ($) | ||||||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Basic Year | FUEL SYSTEM DEVELOPMENT | |||||||||||||||||||
| 0001 | Fuel Interface Line Replaceable Unit (LRU) Development – PDR (Min Order) | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0002 | Fuel Interface LRU Development – CDR | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0003 | Fuel System Software DevOps –IDR | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0004 | Fuel System Certification Black Label Hardware and Software | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0005 | Fuel System Qualification/Developmental/Operational Testing | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0006 | Fuel Systems - Systems Integration Laboratory (SIL) | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0007 | Fuel System Development - Fuel System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 1 | FUEL SYSTEM DEVELOPMENT | |||||||||||||||||||
| 1001 | Fuel Interface Line Replaceable Unit (LRU) Development – PDR | FPIF | Pricing does not occur in Option 1 | |||||||||||||||||
| 1002 | Fuel Interface LRU Development – CDR | FPIF | ||||||||||||||||||
| 1003 | Fuel System Software DevOps –IDR | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1004 | Fuel System Certification Black Label Hardware and Software | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1005 | Fuel System Qualification/Developmental/Operational Testing | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1006 | Fuel Systems - Systems Integration Laboratory (SIL) | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1007 | Fuel System Development - Fuel System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 2 | FUEL SYSTEM DEVELOPMENT | |||||||||||||||||||
| 2001 | Fuel Interface Line Replaceable Unit (LRU) Development – PDR | FPIF | Pricing does not occur in Option 2 | |||||||||||||||||
| 2002 | Fuel Interface LRU Development – CDR | FPIF | ||||||||||||||||||
| 2003 | Fuel System Software DevOps –IDR | FPIF | ||||||||||||||||||
| 2004 | Fuel System Certification Black Label Hardware and Software | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2005 | Fuel System Qualification/Developmental/Operational Testing | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2006 | Fuel Systems - Systems Integration Laboratory (SIL) | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2007 | Fuel System Development - Fuel System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 3 | FUEL SYSTEM DEVELOPMENT | |||||||||||||||||||
| 3001 | Fuel Interface Line Replaceable Unit (LRU) Development – PDR | FPIF | Pricing does not occur in Option 3 | |||||||||||||||||
| 3002 | Fuel Interface LRU Development – CDR | FPIF | ||||||||||||||||||
| 3003 | Fuel System Software DevOps –IDR | FPIF | ||||||||||||||||||
| 3004 | Fuel System Certification Black Label Hardware and Software | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3005 | Fuel System Qualification/Developmental/Operational Testing | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3006 | Fuel Systems - Systems Integration Laboratory (SIL) | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3007 | Fuel System Development - Fuel System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 4 | FUEL SYSTEM DEVELOPMENT | |||||||||||||||||||
| 4001 | Fuel Interface Line Replaceable Unit (LRU) Development – PDR | FPIF | Pricing does not occur in Option 4 | |||||||||||||||||
| 4002 | Fuel Interface LRU Development – CDR | FPIF | ||||||||||||||||||
| 4003 | Fuel System Software DevOps –IDR | FPIF | ||||||||||||||||||
| 4004 | Fuel System Certification Black Label Hardware and Software | FPIF | ||||||||||||||||||
| 4005 | Fuel System Qualification/Developmental/Operational Testing | FPIF | 1 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 4006 | Fuel Systems - Systems Integration Laboratory (SIL) | FPIF | Pricing does not occur in Option 4 | |||||||||||||||||
| 4007 | Fuel System Development - Fuel System Support Equipment | NSP | NSP |
Flight Display Systm X008-X014
| Offeror: | Input Offeror Name here | |||||||||||||||||||
| Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars. | ||||||||||||||||||||
| Note: FPIF CLINs will be evaluated at the Price Ceiling ($) | ||||||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Basic Year | FLIGHT DISPLAYS SYSTEM DEVELOPMENT | |||||||||||||||||||
| 0008 | Flight Display System LRUs Development – PDR | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0009 | Flight Display System LRUs Development – CDR | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0010 | Flight Display System Software DevOps – IDRs | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0011 | Flight Display System Certification- Black Label Hardware and Software | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0012 | Flight Display System Qualification/Developmental/Operational Testing | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0013 | Flight Display System Systems Integration Laboratory (SIL) | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0014 | Flight Display System Development - Flight Display System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | Assigned Shares | |||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 1 | FLIGHT DISPLAYS SYSTEM DEVELOPMENT | |||||||||||||||||||
| 1008 | Flight Display System LRUs Development – PDR | FPIF | Pricing does not occur in Option 1 | |||||||||||||||||
| 1009 | Flight Display System LRUs Development – CDR | FPIF | ||||||||||||||||||
| 1010 | Flight Display System Software DevOps – IDRs | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1011 | Flight Display System Certification- Black Label Hardware and Software | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1012 | Flight Display System Qualification/Developmental/Operational Testing | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1013 | Flight Display System Systems Integration Laboratory (SIL) | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1014 | Flight Display System Development - Flight Display System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | Assigned Shares | |||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 2 | FLIGHT DISPLAYS SYSTEM DEVELOPMENT | |||||||||||||||||||
| 2008 | Flight Display System LRUs Development – PDR | FPIF | Pricing does not occur in Option 2 | |||||||||||||||||
| 2009 | Flight Display System LRUs Development – CDR | FPIF | ||||||||||||||||||
| 2010 | Flight Display System Software DevOps – IDRs | FPIF | ||||||||||||||||||
| 2011 | Flight Display System Certification- Black Label Hardware and Software | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2012 | Flight Display System Qualification/Developmental/Operational Testing | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2013 | Flight Display System Systems Integration Laboratory (SIL) | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2014 | Flight Display System Development - Flight Display System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | Assigned Shares | |||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 3 | FLIGHT DISPLAYS SYSTEM DEVELOPMENT | |||||||||||||||||||
| 3008 | Flight Display System LRUs Development – PDR | FPIF | Pricing does not occur in Option 3 | |||||||||||||||||
| 3009 | Flight Display System LRUs Development – CDR | FPIF | ||||||||||||||||||
| 3010 | Flight Display System Software DevOps – IDRs | FPIF | ||||||||||||||||||
| 3011 | Flight Display System Certification- Black Label Hardware and Software | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3012 | Flight Display System Qualification/Developmental/Operational Testing | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3013 | Flight Display System Systems Integration Laboratory (SIL) | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3014 | Flight Display System Development - Flight Display System Support Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | Assigned Shares | |||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 4 | FLIGHT DISPLAYS SYSTEM DEVELOPMENT | |||||||||||||||||||
| 4008 | Flight Display System LRUs Development – PDR | FPIF | Pricing does not occur in Option 4 | |||||||||||||||||
| 4009 | Flight Display System LRUs Development – CDR | FPIF | ||||||||||||||||||
| 4010 | Flight Display System Software DevOps – IDRs | FPIF | ||||||||||||||||||
| 4011 | Flight Display System Certification- Black Label Hardware and Software | FPIF | ||||||||||||||||||
| 4012 | Flight Display System Qualification/Developmental/Operational Testing | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 4013 | Flight Display System Systems Integration Laboratory (SIL) | FPIF | Pricing does not occur in Option 4 | |||||||||||||||||
| 4014 | Flight Display System Development - Flight Display System Support Equipment | NSP | NSP |
Digtl Devlpmnt Statn 0015
| Offeror: | Input Offeror Name here | ||||||||||||||||||||
| Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars. | |||||||||||||||||||||
| Note: FPIF CLINs will be evaluated at the Price Ceiling ($) | |||||||||||||||||||||
| Assigned Shares | |||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | |||||||||||||||
| Unit Price | Target Cost | Target Profit | |||||||||||||||||||
| Unit Price | Target Unit Price | Target Profit | |||||||||||||||||||
| Total Target Price | Price Ceiling (%) | Price Ceiling ($) | |||||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | |||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | ||||||||||||||||||
| 0.00% | Government | Contractor | Government | Contractor | |||||||||||||||||
| Basic Year | DISPLAY DEVELOPMENT STATION | ||||||||||||||||||||
| 0015 | DISPLAY DEVELOPMENT STATION (Min Order) | FPIF | 1 | LOT | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 30% | 70% | 70% | 30% | |||
| Incentive Pools (Weighted Average Cost/Delivery (50/50)) | |||||||||||||||||||||
| Cost Incentive Pool (utilizes assigned share ratios and FPIF adjustment formula) | 50% Target Profit | $0.00 | |||||||||||||||||||
| Delivery Incentive Pool (static incetive pool with ascending/descending scale) | 50% Target Profit | $0.00 |
| Delivery Incentive Schedule | ||||
| 61 Days or later (after contract delivery date) | 0% of Delivery Incentive Delivery | $0.00 | ||
| 46- 60 Days late (after contract delivery date) | 2.5% of Delivery Incentive Pool | $0.00 | ||
| 31-45 Days late (after contract delivery date) | 5% of Delivery Incentive Pool | $0.00 | ||
| 16-30 Days late (after contract delivery date) | 7.5% of Delivery Incentive Pool | $0.00 | ||
| 1-15 days late (after contract delivery date) | 10% of Delivery | |||
| Incentive Pool | $0.00 | |||
| On-Time-15 Days after CDR/order (before contractual delivery date) | 12.5% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 16-30 Days early (before contractual delivery date) | 25% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 31-45 Days early (before contractual delivery date) | 50% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 46-60 Days early (before contractual delivery date) | 75% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 61 Days or earlier (before contractual delivery date) | 100% of Delivery Incentive Pool | $0.00 |
Prototype X016-X019
| Offeror: | Input Offeror Name here | ||||||||||||||||||||
| Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars. | |||||||||||||||||||||
| Note: FPIF CLINs will be evaluated at the Price Ceiling ($) | |||||||||||||||||||||
| Assigned Shares | |||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | |||||||||||||||
| Unit Price | Target Cost | Target Profit | |||||||||||||||||||
| Unit Price | Target Unit Price | Target Profit | |||||||||||||||||||
| Total Target Price | Price Ceiling (%) | Price Ceiling ($) | |||||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | |||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | ||||||||||||||||||
| 0.00% | Government | Contractor | Government | Contractor | |||||||||||||||||
| Basic Year | PROTOTYPE | ||||||||||||||||||||
| 0016 | Two (2) Prototypes - Prototype Installation/Post Install Checkout (PICO) | FPIF | 2 | EA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 30% | 70% | 70% | 30% | |||
| 0017 | Prototype A-KIT Tech Data Package | NSP | NSP | ||||||||||||||||||
| 0018 | Prototype A-KIT Tech Data Package | NSP | NSP | ||||||||||||||||||
| 0019 | Prototype Support Equipment | NSP | NSP |
| Incentive Pools (Weighted Average Cost/Delivery (50/50)) | ||
| Cost Incentive Pool (utilizes assigned share ratios and FPIF adjustment formula) | 50% Target Profit | $0.00 |
| Delivery Incentive Pool (static incetive pool with ascending/descending scale) | 50% Target Profit | $0.00 |
| Delivery Incentive Schedule | ||||
| 61 Days or later (after contract delivery date) | 0% of Delivery Incentive Delivery | $0.00 | ||
| 46- 60 Days late (after contract delivery date) | 2.5% of Delivery Incentive Pool | $0.00 | ||
| 31-45 Days late (after contract delivery date) | 5% of Delivery Incentive Pool | $0.00 | ||
| 16-30 Days late (after contract delivery date) | 7.5% of Delivery Incentive Pool | $0.00 | ||
| 1-15 days late (after contract delivery date) | 10% of Delivery | |||
| Incentive Pool | $0.00 | |||
| On-Time-15 Days after CDR/order (before contractual delivery date) | 12.5% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 16-30 Days early (before contractual delivery date) | 25% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 31-45 Days early (before contractual delivery date) | 50% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 46-60 Days early (before contractual delivery date) | 75% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 61 Days or earlier (before contractual delivery date) | 100% of Delivery Incentive Pool | $0.00 |
| Assigned Shares | |||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | |||||||||||||||
| Unit Price | Target Cost | Target Profit | |||||||||||||||||||
| Unit Price | Target Unit Price | Target Profit | |||||||||||||||||||
| Total Target Price | Price Ceiling (%) | Price Ceiling ($) | |||||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | |||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | ||||||||||||||||||
| 0.00% | Government | Contractor | Government | Contractor | |||||||||||||||||
| Option 1 | PROTOTYPE | ||||||||||||||||||||
| 1016 | Two (2) Prototypes - Prototype Installation/Post Install Checkout (PICO) | FPIF | 2 | EA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 30% | 70% | 70% | 30% | |||
| 1017 | Prototype A-KIT Tech Data Package | NSP | NSP | ||||||||||||||||||
| 1018 | Prototype A-KIT Tech Data Package | NSP | NSP | ||||||||||||||||||
| 1019 | Prototype Support Equipment | NSP | NSP |
| Incentive Pools (Weighted Average Cost/Delivery (50/50)) | ||
| Cost Incentive Pool (utilizes assigned share ratios and FPIF adjustment formula) | 50% Target Profit | $0.00 |
| Delivery Incentive Pool (static incetive pool with ascending/descending scale) | 50% Target Profit | $0.00 |
| Delivery Incentive Schedule | ||||
| 61 Days or later (after contract delivery date) | 0% of Delivery Incentive Delivery | $0.00 | ||
| 46- 60 Days late (after contract delivery date) | 2.5% of Delivery Incentive Pool | $0.00 | ||
| 31-45 Days late (after contract delivery date) | 5% of Delivery Incentive Pool | $0.00 | ||
| 16-30 Days late (after contract delivery date) | 7.5% of Delivery Incentive Pool | $0.00 | ||
| 1-15 days late (after contract delivery date) | 10% of Delivery | |||
| Incentive Pool | $0.00 | |||
| On-Time-15 Days after CDR/order (before contractual delivery date) | 12.5% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 16-30 Days early (before contractual delivery date) | 25% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 31-45 Days early (before contractual delivery date) | 50% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 46-60 Days early (before contractual delivery date) | 75% of Delivery | |||
| Incentive Pool | $0.00 | |||
| 61 Days or earlier (before contractual delivery date) | 100% of Delivery Incentive Pool | $0.00 |
Install & Kits X020- X024
| Offeror: | Input Offeror Name here | |||||||||||||||||||
| Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars. | ||||||||||||||||||||
| Note: FPIF CLINs will be evaluated at the Price Ceiling ($) | ||||||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| 0020 | Basic Year | Installation | FPIF | No Pricing | ||||||||||||||||
| 0021 | PRODUCTION A-KITS | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0022 | A-KIT Support Equipment | NSP | NSP | |||||||||||||||||
| 0023 | PRODUCTION B-KITS | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 0024 | B-KIT Suppot Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| 1020 | Option 1 | Installation | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | ||
| 1021 | PRODUCTION A-KITS | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1022 | A-KIT Support Equipment | NSP | NSP | |||||||||||||||||
| 1023 | PRODUCTION B-KITS | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 1024 | B-KIT Suppot Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| 2020 | Option 2 | Installation | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | ||
| 2021 | PRODUCTION A-KITS | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2022 | A-KIT Support Equipment | NSP | NSP | |||||||||||||||||
| 2023 | PRODUCTION B-KITS | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 2024 | B-KIT Suppot Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| 3020 | Option 3 | Installation | FPIF | 25 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | ||
| 3021 | PRODUCTION A-KITS | FPIF | 75 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3022 | A-KIT Support Equipment | NSP | NSP | |||||||||||||||||
| 3023 | PRODUCTION B-KITS | FPIF | 75 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 3024 | B-KIT Suppot Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor | |||||||||||||||||
| 4020 | Option 4 | Installation | FPIF | 75 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | ||
| 4021 | PRODUCTION A-KITS | FPIF | 75 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 4022 | A-KIT Support Equipment | NSP | NSP | |||||||||||||||||
| 4023 | PRODUCTION B-KITS | FPIF | 75 | EA | $0.00 | $0.00 | $0.00 | $0.00 | 125% | $0.00 | $0.00 | $0.00 | $0.00 | 40% | 60% | 60% | 40% | |||
| 4024 | B-KIT Suppot Equipment | NSP | NSP | |||||||||||||||||
| Assigned Shares | ||||||||||||||||||||
| CLIN | Period | Description | Contract Type | BEQ | Unit of Issue | Target Cost | ||||||||||||||
| Unit Price | Target Cost | Target Profit | ||||||||||||||||||
| Unit Price | Target Unit Price | Total Target Price | Price Ceiling (%) | Price Ceiling ($) | ||||||||||||||||
| Unit Price | Price Ceiling ($) | PTA | ||||||||||||||||||
| Unit Price | Total PTA | Under Target | Over Target | |||||||||||||||||
| Government | Contractor | Government | Contractor |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .