Amendment 2 - KC-135 CCR Pricing Matrix.xlsx

XLSX spreadsheet 96 KB Posted

Attached to
KC-135 Center Console Refresh (CCR)
Solicitation number
FA810523RB004
Issued by

About this file

This document provides pricing details for the KC-135 Center Console Refresh solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center at Tinker Air Force Base. Key requirements include development, certification, installation and support for fuel system and flight display upgrades. Offerors must provide unit pricing and proposed profits for various contract line items covering hardware and software development, prototyping, installation kits, logistics support and training. Pricing methodologies include firm-fixed-price, fixed-price incentive fee, and cost reimbursement elements. Incentive pools reward cost control and early delivery. The period of performance spans nine years in multiple option periods.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary of Changes

Summary of Pricing Matrix Chagnes after release of Solicitation
Amendment 1CLIN X037 - Option 3 (Year 4) quantity is reduced FROM: 6 TO: 5
CLIN X027 - The unit of issue (U/I) is changed

FROM: LOT TO: EACH

CLIN X027 - Quantities have changed:

Basic (Year 1): FROM: 1 LOT TO: 2 EACH Option 1 (Year 2): FROM: 1 LOT TO: 2 EACH Option 2 (Year 3): FROM: 1 LOT TO: 2 EACH Option 3 (Year 4): FROM: 1 LOT TO: 4 EACH Option 4 (Year 5): FROM: 1 LOT TO: 10 EACH Option 5 (Year 6): FROM: 1 LOT TO: 10 EACH Option 6 (Year 7): FROM: 1 LOT TO: 10 EACH Option 7 (Year 8): FROM: 1 LOT TO: 2 EACH Option 8 (Year 9): FROM: 1 LOT TO: 1 EACH Amendment 2 CLIN X005 -Fixed an error related to the AVERAGING to include Option 4 CLIN X0012 - Fixed an error related to the AVERAGING to include Option 4

CLIN X020:

Option 1 Qty changed FROM: 30 TO: 25 Option 2 Qty changed FROM: 30 TO: 25 Option 3 Qty changed FROM: 30 TO: 25

Added Option 3 (year 4) to the TEP average

CLIN X021:

Basic Qty changed FROM: 30 TO: 25 Option 1 Qty changed FROM: 30 TO: 25

Added Option 2 (year 3) to the TEP average

CLIN X023:

Basic Qty changed FROM: 30 TO: 25 Option 1 Qty changed FROM: 30 TO: 25

Instructions

INSTRUCTIONS
1. Complete sheets Fuel System Dev X001-X007, Flight Display Systm X008-X014, Digtl Devlpmnt Statn 0015, Prototype X016-X019, Install & Kits X020-X024, and Kits & Spares X037-X038 by providing your unit price in the YELLOW Cells, and your proposed profit in the YELLOW cells.
2. Complete sheet FFP X025-X036 by providing your Firm Fixed Unit Price in the YELLOW cells. CLINs X031 contain material handling rate, and O&A labor rates. Please input your proposed material handling rate in the YELLOW cells, and labor rates in the YELLOW cells.
TABLE OF CONTENTS
SheetDescription
Calculation MethodologyExplanation of CLIN calculation methodology
SummarySummary of all CLINs by Basic and Options and total. Showing Total Evaluated Price (TEP)
Fuel System Dev X001 - X007Fuel System Development CLINs (X001 - X007)
Flight Display Systm X008-X014Flight Display System Development CLINs (X008 - X014)
Digtl Devlpmnt Statn 0015Displays Development Station CLIN (0015)
Prototype X016 - X019Prototype CLINs (X016 - X019)
Install & Kits X020 - X024Installation and Kits CLINS (X020 - X024)
FFP X025 - X036FFP CLINs (X025 - X036)
Kits & Spares X037-X038Simulator Kits and Prototype Spares CLINs (X037 and X038)

Calculation Methodology

CLINDescriptionContract TypeCalculation Methodology
X001 - X003Fuel System DevelopmentFPIFThe Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.)

CLIN X004 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.

CLIN X005

CLIN X006

X004 - X007 Fuel System Development The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.

CLIN X007 is Not Separately Priced (NSP)

CLIN X004 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.

CLIN X005 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, Option 3 and Option 4.

CLIN X006 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.

X008 - X010Flight Display SystemFPIFThe Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.)
X011-X014Flight Display SystemFPIFThe Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.

CLIN X014 is Not Separately Priced (NSP)

CLIN X011 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.

CLIN X012 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, Option 3 and Option 4.

CLIN X013 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year, Option 1, Option 2, and Option 3.

X015Displays Development StationFPIFThe Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.)
X016 - X019PrototypeFPIFThe Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.

CLIN X017, X018 and X019 are Not Separately Priced (NSP)

CLIN X016 - Total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year and Option 1.

X020 - X024 Installation and Kits FPIF The Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit.

These CLINs have averaging in some years.

For the CLIN/and year listed below as averaging, the Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity for each year, and then take an average of the years utilized in order to evaluate the extended pricing. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.

For the remaining years not averaged, the Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.)

CLIN X022 and X024 are Not Separately Priced (NSP)

X020 - The extended pricing for Option 1 and 2 will be calculated using averaging. The total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Option 1 and Option 2.

X021 - The extended pricing for the Basic Year and Option 1 will be calculated using averaging. The total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Basic Year and Option 1.

X023 - The extended pricing for Option 1 and 2 will be calculated using averaging. The total extended pricing will be averaged by multiplying Proposed Unit Ceiling Price by BEQ for Option 1 and Option 2.

X025Production Configuration Control/Engineering Change OrdersFFPProposed hourly labor rate multiplied by estimated labor hours for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total proposed price for each labor category.
X026Maintenance & Repair SupportFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. For Option 1 and Option 2 the extended totals will be averaged. The remaining priced years will not be averaged. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.
X027LRU SparesFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. For the Basic Year and Option 1 the extended totals will be averaged. The remaining priced years will not be averaged. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.
X028TrainingFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price. For the Basic Year and Option 1 the extended totals will be averaged. The remaining priced years will not be averaged. Averages for each CLIN are highlighted in ORANGE on the Summary tab for ease and also listed below.
X029CDRLSNSPNot Separately Priced (NSP)
X030TravelCRTravel, shall be cost reimbursable and shall not be used in calculating the TEP.
X031Material Handling RateFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price.
Labor RateFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price.
X032Data/Intellectual PropertyNSPNot Separately Priced (NSP)
X0032AAFuel System & Flight Display System
X033Warranty
X034Earned Value ManagementFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price.
X035Program ManagementFFPProposed unit price multiplied by the evaluation quantity for the Basic and all Option Periods. The extended total for each performance period is then added to calculate the total CLIN price.
X036Technical OrdersFFPProposed unit price multiplied by the evaluation quantity for the Basic Year and Options Periods 1-4. The extended total for each performance period is then added to calculate the total CLIN price.
X037Simulator KitsFPIFThe Government will multiply the offeror’s proposed target profit rate times the offeror’s proposed target cost per unit, yielding the calculated profit dollars per unit. The Government will add the calculated proposed target profit dollars per unit to the proposed target cost per unit yielding the calculated proposed target price per unit. The Government will apply a Ceiling Price rate of one hundred twenty-five percent (125%) times the calculated proposed target price per unit, yielding the calculated proposed target ceiling price per unit. The Government will multiply the calculated proposed target ceiling price per unit times the respective BEQ quantity, yielding the evaluated CLIN price. (The evaluated CLIN price is the extended calculated proposed target ceiling price.)
X038Prototype Spares

Summary

OFFEROR
Input Offeror Name here
KC-135 Center Console Refresh (CCR)
Best Estimated Quantities (BEQ)Proposed Unit Prices / Ceiling PricesProposed Total Extended Price
CLINDescriptionContract TypeUnit of IssueBasic YearOption 1Option 2Option 3Option 4Option 5Option 6Option 7Option 8Basic YearOption 1Option 2Option 3Option 4Option 5Option 6Option 7Option 8Basic YearOption 1Option 2Option 3Option 4Option 5Option 6Option 7Option 8Total Evaluated Price by CLIN
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9
FY24-25FY25-26FY26-27FY27-28FY28-29FY29-30FY30-31FY31-32FY32-33
FUEL SYSTEM DEVELOPMENT
X001Fuel Interface Line Replaceable Unit (LRU) Development – PDR (Min Order)FPIFLOT1Pricing only occurs in the basic year$0.00Pricing only occurs in the basic year$0.00Pricing only occurs in the basic year$0.00
X002Fuel Interface LRU Development – CDRFPIFLOT1$0.00$0.00$0.00
X003Fuel System Software DevOps –IDRFPIFLOT11Pricing only occurs in Basic Year and Option 1$0.00$0.00Pricing only occurs in the basic year$0.00$0.00Pricing only occurs in the basic year$0.00
Average Years 1-4X004Fuel System Certification Black Label Hardware and SoftwareFPIFLOT1111Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00
Average Years 1-5X005Fuel System Qualification/Developmental/Operational TestingFPIFLOT11111Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00$0.00$0.00$0.00$0.00Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00$0.00$0.00$0.00$0.00Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00
Average Years 1-4X006Fuel Systems - Systems Integration Laboratory (SIL)FPIFLOT1111Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00
X007Fuel System Development - Fuel System Support EquipmentNSPNSPNSPNSPNSP
FLIGHT DISPLAYS SYSTEM DEVELOPMENT
X008Flight Display System LRUs Development – PDR (Min Order)FPIFLOT1Pricing only occurs in the basic year$0.00Pricing only occurs in the basic year$0.00Pricing only occurs in the basic year$0.00
X009Flight Display System LRUs Development – CDRFPIFLOT1$0.00$0.00$0.00
X010Flight Display System Software DevOps – IDRsFPIFLOT11Pricing only occurs in Basic Year and Option 1$0.00$0.00Pricing only occurs in the basic year$0.00$0.00Pricing only occurs in the basic year$0.00
Average Years 1-4X011Flight Display System Certification- Black Label Hardware and SoftwareFPIFLOT1111Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00
Average Years 1-5X012Flight Display System Qualification/Developmental/Operational TestingFPIFLOT11111Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00$0.00$0.00$0.00$0.00Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00$0.00$0.00$0.00$0.00Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00
Average Years 1-4X013Flight Display System Systems Integration Laboratory (SIL)FPIFLOT1111Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00$0.00$0.00$0.00Pricing only occurs in Basic, Option 1, 2, and 3$0.00
X014Flight Display System Development - Flight Display System Support EquipmentNSPNSPNSPNSPNSP
DISPLAY DEVELOPMENT STATION
X015Display Development Station (Min Order)FPIFLOT1Pricing only occurs in the basic year$0.00Pricing only occurs in the basic year$0.00Pricing only occurs in the basic year$0.00
PROTOTYPE
Average Year 1-2X016Two (2) Prototypes - Prototype Installation/Post Install Checkout (PICO)FPIFEA22Pricing only occurs in Basic Year and Option 1$0.00$0.00Pricing only occurs in Basic Year and Option 1$0.00$0.00Pricing only occurs in Basic Year and Option 1$0.00
X017Prototype A-KIT Tech Data PackageNSPNSPNSPNSPNSP
X018Prototype A-KIT Tech Data PackageNSPNSPNSPNSPNSP
X019Prototype Support EquipmentNSPNSPNSPNSPNSP
Installation and Kits
Average Year 2-4X020InstallationFPIFEANo pricing2525257575731015No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Average Year 1-3X021Production A-KitsFPIFEA2525257575731015No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00No pricing$0.00
X022A-KIT Support EquipmentNSPNSPNSPNSPNSP
Average Year 1-3X023Production B-KitsFPIFEA2525257575731015No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00No pricing$0.00
X024B-KIT Support EquipmentNSPNSPNSPNSPNSP
Firm Fixed Price
X025Production Configuration Control/Engineering Change OrdersFFPHourly Rate500500500500500500500500500$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Average Year 2-3X026Maintenance & Repair SupportFFPLOTNo pricing11111111No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00No pricing$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Average Year 1-2X027LRU SparesFFPEACH222410101021$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Average Years 1-2X028TrainingFFPLOT11111Pricing only occurs in Basic Option 1, 2, 3 and 4$0.00$0.00$0.00$0.00$0.00Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00$0.00$0.00$0.00$0.00Pricing only occurs in Baisic Option 1, 2, 3 and 4$0.00
X029CDRLSNSPNSPNSPNSPNSP
X030TravelCRLOTNot EvaluatedNot EvaluatedNot Evaluated
X031Over and AboveFFPLOT
1Material Handling RateFFPLOT$3,000.00$3,000.00$5,000.00$75,000.00$225,000.00$225,000.00$225,000.00$30,000.00$45,000.000.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%0.00%$3,000.00$3,000.00$5,000.00$75,000.00$225,000.00$225,000.00$225,000.00$30,000.00$45,000.00$836,000.00
2Labor RateFFPHourly Rate6513011625487548754875650975$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
X032Data/Intellectual PropertyNSPNSPNSPNSPNSP
X0032AAFuel System & Flight Display SystemFFPLOT111111111$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
X033WarrantyFFPNSPNSPNSPNSP
X034Earned Value ManagementFFPLOT111111111$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
X035Program ManagementFFPLOT111111111$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
X036Technical OrdersFFPLOT11111No Pricing$0.00$0.00$0.00$0.00$0.00No Pricing$0.00$0.00$0.00$0.00$0.00No Pricing$0.00
Simulator Kits & Prototype Spares
X037Simulator KitsFPIFLOT1No Pricing756No Pricing$0.00No Pricing$0.00$0.00$0.00No Pricing$0.00No Pricing$0.00$0.00$0.00No Pricing$0.00
X038Prototype SparesFPIFLOT22No Pricing$0.00$0.00No Pricing$0.00$0.00No Pricing$0.00
Basic YearOption 1Option 2Option 3Option 4Option 5Option 6Option 7Option 8$836,000.00
Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9
Total per Basic & Option years**$3,000.00$3,000.00$5,000.00$75,000.00$225,000.00$225,000.00$225,000.00$30,000.00$45,000.00

Total Evaluated Price (TEP)* = $836,000.00

Notes

Averaged CLINs: Since it is not known when the ordering will take place on the averaged CLINS in ORANGE, CLINs are priced for each year, and then averaged in order to calculate the TEP.

*Because the government does not know when ordering will take place for the ORANGE averaged CLINs the governments TEP calcuation takes into account the average price for those CLINs and it is for evaluation purposes ONLY.

**The total per basic & Option years will not add up to the TEP. Because some CLINs are averaged this total takes into account the estimated total per year that utilizes the proposed unit price/ceiling price.

Fuel System Dev X001-X007

Offeror:Input Offeror Name here
Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars.
Note: FPIF CLINs will be evaluated at the Price Ceiling ($)
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Basic YearFUEL SYSTEM DEVELOPMENT
0001Fuel Interface Line Replaceable Unit (LRU) Development – PDR (Min Order)FPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0002Fuel Interface LRU Development – CDRFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0003Fuel System Software DevOps –IDRFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0004Fuel System Certification Black Label Hardware and SoftwareFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0005Fuel System Qualification/Developmental/Operational TestingFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0006Fuel Systems - Systems Integration Laboratory (SIL)FPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0007Fuel System Development - Fuel System Support EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 1FUEL SYSTEM DEVELOPMENT
1001Fuel Interface Line Replaceable Unit (LRU) Development – PDRFPIFPricing does not occur in Option 1
1002Fuel Interface LRU Development – CDRFPIF
1003Fuel System Software DevOps –IDRFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1004Fuel System Certification Black Label Hardware and SoftwareFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1005Fuel System Qualification/Developmental/Operational TestingFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1006Fuel Systems - Systems Integration Laboratory (SIL)FPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1007Fuel System Development - Fuel System Support EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 2FUEL SYSTEM DEVELOPMENT
2001Fuel Interface Line Replaceable Unit (LRU) Development – PDRFPIFPricing does not occur in Option 2
2002Fuel Interface LRU Development – CDRFPIF
2003Fuel System Software DevOps –IDRFPIF
2004Fuel System Certification Black Label Hardware and SoftwareFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2005Fuel System Qualification/Developmental/Operational TestingFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2006Fuel Systems - Systems Integration Laboratory (SIL)FPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2007Fuel System Development - Fuel System Support EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 3FUEL SYSTEM DEVELOPMENT
3001Fuel Interface Line Replaceable Unit (LRU) Development – PDRFPIFPricing does not occur in Option 3
3002Fuel Interface LRU Development – CDRFPIF
3003Fuel System Software DevOps –IDRFPIF
3004Fuel System Certification Black Label Hardware and SoftwareFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3005Fuel System Qualification/Developmental/Operational TestingFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3006Fuel Systems - Systems Integration Laboratory (SIL)FPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3007Fuel System Development - Fuel System Support EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 4FUEL SYSTEM DEVELOPMENT
4001Fuel Interface Line Replaceable Unit (LRU) Development – PDRFPIFPricing does not occur in Option 4
4002Fuel Interface LRU Development – CDRFPIF
4003Fuel System Software DevOps –IDRFPIF
4004Fuel System Certification Black Label Hardware and SoftwareFPIF
4005Fuel System Qualification/Developmental/Operational TestingFPIF1EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
4006Fuel Systems - Systems Integration Laboratory (SIL)FPIFPricing does not occur in Option 4
4007Fuel System Development - Fuel System Support EquipmentNSPNSP

Flight Display Systm X008-X014

Offeror:Input Offeror Name here
Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars.
Note: FPIF CLINs will be evaluated at the Price Ceiling ($)
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Basic YearFLIGHT DISPLAYS SYSTEM DEVELOPMENT
0008Flight Display System LRUs Development – PDRFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0009Flight Display System LRUs Development – CDRFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0010Flight Display System Software DevOps – IDRsFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0011Flight Display System Certification- Black Label Hardware and SoftwareFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0012Flight Display System Qualification/Developmental/Operational TestingFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0013Flight Display System Systems Integration Laboratory (SIL)FPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0014Flight Display System Development - Flight Display System Support EquipmentNSPNSP
Assigned SharesAssigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 1FLIGHT DISPLAYS SYSTEM DEVELOPMENT
1008Flight Display System LRUs Development – PDRFPIFPricing does not occur in Option 1
1009Flight Display System LRUs Development – CDRFPIF
1010Flight Display System Software DevOps – IDRsFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1011Flight Display System Certification- Black Label Hardware and SoftwareFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1012Flight Display System Qualification/Developmental/Operational TestingFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1013Flight Display System Systems Integration Laboratory (SIL)FPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1014Flight Display System Development - Flight Display System Support EquipmentNSPNSP
Assigned SharesAssigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 2FLIGHT DISPLAYS SYSTEM DEVELOPMENT
2008Flight Display System LRUs Development – PDRFPIFPricing does not occur in Option 2
2009Flight Display System LRUs Development – CDRFPIF
2010Flight Display System Software DevOps – IDRsFPIF
2011Flight Display System Certification- Black Label Hardware and SoftwareFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2012Flight Display System Qualification/Developmental/Operational TestingFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2013Flight Display System Systems Integration Laboratory (SIL)FPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2014Flight Display System Development - Flight Display System Support EquipmentNSPNSP
Assigned SharesAssigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 3FLIGHT DISPLAYS SYSTEM DEVELOPMENT
3008Flight Display System LRUs Development – PDRFPIFPricing does not occur in Option 3
3009Flight Display System LRUs Development – CDRFPIF
3010Flight Display System Software DevOps – IDRsFPIF
3011Flight Display System Certification- Black Label Hardware and SoftwareFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3012Flight Display System Qualification/Developmental/Operational TestingFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3013Flight Display System Systems Integration Laboratory (SIL)FPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3014Flight Display System Development - Flight Display System Support EquipmentNSPNSP
Assigned SharesAssigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
Option 4FLIGHT DISPLAYS SYSTEM DEVELOPMENT
4008Flight Display System LRUs Development – PDRFPIFPricing does not occur in Option 4
4009Flight Display System LRUs Development – CDRFPIF
4010Flight Display System Software DevOps – IDRsFPIF
4011Flight Display System Certification- Black Label Hardware and SoftwareFPIF
4012Flight Display System Qualification/Developmental/Operational TestingFPIF1LOT$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
4013Flight Display System Systems Integration Laboratory (SIL)FPIFPricing does not occur in Option 4
4014Flight Display System Development - Flight Display System Support EquipmentNSPNSP

Digtl Devlpmnt Statn 0015

Offeror:Input Offeror Name here
Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars.
Note: FPIF CLINs will be evaluated at the Price Ceiling ($)
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTarget Profit
Total Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
0.00%GovernmentContractorGovernmentContractor
Basic YearDISPLAY DEVELOPMENT STATION
0015DISPLAY DEVELOPMENT STATION (Min Order)FPIF1LOT$0.00$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0030%70%70%30%
Incentive Pools (Weighted Average Cost/Delivery (50/50))
Cost Incentive Pool (utilizes assigned share ratios and FPIF adjustment formula)50% Target Profit$0.00
Delivery Incentive Pool (static incetive pool with ascending/descending scale)50% Target Profit$0.00
Delivery Incentive Schedule
61 Days or later (after contract delivery date)0% of Delivery Incentive Delivery$0.00
46- 60 Days late (after contract delivery date)2.5% of Delivery Incentive Pool$0.00
31-45 Days late (after contract delivery date)5% of Delivery Incentive Pool$0.00
16-30 Days late (after contract delivery date)7.5% of Delivery Incentive Pool$0.00
1-15 days late (after contract delivery date)10% of Delivery
Incentive Pool$0.00
On-Time-15 Days after CDR/order (before contractual delivery date)12.5% of Delivery
Incentive Pool$0.00
16-30 Days early (before contractual delivery date)25% of Delivery
Incentive Pool$0.00
31-45 Days early (before contractual delivery date)50% of Delivery
Incentive Pool$0.00
46-60 Days early (before contractual delivery date)75% of Delivery
Incentive Pool$0.00
61 Days or earlier (before contractual delivery date)100% of Delivery Incentive Pool$0.00

Prototype X016-X019

Offeror:Input Offeror Name here
Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars.
Note: FPIF CLINs will be evaluated at the Price Ceiling ($)
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTarget Profit
Total Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
0.00%GovernmentContractorGovernmentContractor
Basic YearPROTOTYPE
0016Two (2) Prototypes - Prototype Installation/Post Install Checkout (PICO)FPIF2EA$0.00$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0030%70%70%30%
0017Prototype A-KIT Tech Data PackageNSPNSP
0018Prototype A-KIT Tech Data PackageNSPNSP
0019Prototype Support EquipmentNSPNSP
Incentive Pools (Weighted Average Cost/Delivery (50/50))
Cost Incentive Pool (utilizes assigned share ratios and FPIF adjustment formula)50% Target Profit$0.00
Delivery Incentive Pool (static incetive pool with ascending/descending scale)50% Target Profit$0.00
Delivery Incentive Schedule
61 Days or later (after contract delivery date)0% of Delivery Incentive Delivery$0.00
46- 60 Days late (after contract delivery date)2.5% of Delivery Incentive Pool$0.00
31-45 Days late (after contract delivery date)5% of Delivery Incentive Pool$0.00
16-30 Days late (after contract delivery date)7.5% of Delivery Incentive Pool$0.00
1-15 days late (after contract delivery date)10% of Delivery
Incentive Pool$0.00
On-Time-15 Days after CDR/order (before contractual delivery date)12.5% of Delivery
Incentive Pool$0.00
16-30 Days early (before contractual delivery date)25% of Delivery
Incentive Pool$0.00
31-45 Days early (before contractual delivery date)50% of Delivery
Incentive Pool$0.00
46-60 Days early (before contractual delivery date)75% of Delivery
Incentive Pool$0.00
61 Days or earlier (before contractual delivery date)100% of Delivery Incentive Pool$0.00
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTarget Profit
Total Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
0.00%GovernmentContractorGovernmentContractor
Option 1PROTOTYPE
1016Two (2) Prototypes - Prototype Installation/Post Install Checkout (PICO)FPIF2EA$0.00$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0030%70%70%30%
1017Prototype A-KIT Tech Data PackageNSPNSP
1018Prototype A-KIT Tech Data PackageNSPNSP
1019Prototype Support EquipmentNSPNSP
Incentive Pools (Weighted Average Cost/Delivery (50/50))
Cost Incentive Pool (utilizes assigned share ratios and FPIF adjustment formula)50% Target Profit$0.00
Delivery Incentive Pool (static incetive pool with ascending/descending scale)50% Target Profit$0.00
Delivery Incentive Schedule
61 Days or later (after contract delivery date)0% of Delivery Incentive Delivery$0.00
46- 60 Days late (after contract delivery date)2.5% of Delivery Incentive Pool$0.00
31-45 Days late (after contract delivery date)5% of Delivery Incentive Pool$0.00
16-30 Days late (after contract delivery date)7.5% of Delivery Incentive Pool$0.00
1-15 days late (after contract delivery date)10% of Delivery
Incentive Pool$0.00
On-Time-15 Days after CDR/order (before contractual delivery date)12.5% of Delivery
Incentive Pool$0.00
16-30 Days early (before contractual delivery date)25% of Delivery
Incentive Pool$0.00
31-45 Days early (before contractual delivery date)50% of Delivery
Incentive Pool$0.00
46-60 Days early (before contractual delivery date)75% of Delivery
Incentive Pool$0.00
61 Days or earlier (before contractual delivery date)100% of Delivery Incentive Pool$0.00

Install & Kits X020- X024

Offeror:Input Offeror Name here
Offerors: Provide your Target Costs for the FPIF CLINs in the YELLOW cells. Round to the nearest cent. Costs and prices are in US Dollars.
Note: FPIF CLINs will be evaluated at the Price Ceiling ($)
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
0020Basic YearInstallationFPIFNo Pricing
0021PRODUCTION A-KITSFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0022A-KIT Support EquipmentNSPNSP
0023PRODUCTION B-KITSFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
0024B-KIT Suppot EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
1020Option 1InstallationFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1021PRODUCTION A-KITSFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1022A-KIT Support EquipmentNSPNSP
1023PRODUCTION B-KITSFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
1024B-KIT Suppot EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
2020Option 2InstallationFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2021PRODUCTION A-KITSFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2022A-KIT Support EquipmentNSPNSP
2023PRODUCTION B-KITSFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
2024B-KIT Suppot EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
3020Option 3InstallationFPIF25EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3021PRODUCTION A-KITSFPIF75EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3022A-KIT Support EquipmentNSPNSP
3023PRODUCTION B-KITSFPIF75EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
3024B-KIT Suppot EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor
4020Option 4InstallationFPIF75EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
4021PRODUCTION A-KITSFPIF75EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
4022A-KIT Support EquipmentNSPNSP
4023PRODUCTION B-KITSFPIF75EA$0.00$0.00$0.00$0.00125%$0.00$0.00$0.00$0.0040%60%60%40%
4024B-KIT Suppot EquipmentNSPNSP
Assigned Shares
CLINPeriodDescriptionContract TypeBEQUnit of IssueTarget Cost
Unit PriceTarget CostTarget Profit
Unit PriceTarget Unit PriceTotal Target PricePrice Ceiling (%)Price Ceiling ($)
Unit PricePrice Ceiling ($)PTA
Unit PriceTotal PTAUnder TargetOver Target
GovernmentContractorGovernmentContractor

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .