atch 9 Past Performance Questionnaire.pdf

PDF 71 KB Posted

Attached to
Paving Requirements Joint Base Elmendorf-Richardson AK Federal contract opportunity
Solicitation number
FA5000-12-R-0001
Issued by
Department of the Air Force Pacific Air Forces

About this file

atch 9 Past Performance Questionaire

View the file

Other files for this federal contract opportunity

Other files attached to Paving Requirements Joint Base Elmendorf-Richardson AK, newest first.
File Type Posted
Atch 6 Option Year 2.pdf PDF
Atch 6 Option Year 4.pdf PDF
Atch 6 Option Year 3.pdf PDF
Atch 6 Option Year 6.pdf PDF
Atch 6 Option Year 5.pdf PDF
Atch 6 Option Year 1.pdf PDF
Bid Questions 8 May 12.pdf PDF
atch 1 1020 scope —
atch 4 Wage 20 Apr 12.pdf PDF
FA5000-12-R-0001 solicitation.doc DOC document
FA5000-12-R-0001 Sol 18 Apr 12.doc DOC document
atch 6 Contractor Bid Schedules Summary.pdf PDF
atch 6 Contractor Bid Schedules option 5.pdf PDF
atch 1 1121 Accumulation.pdf PDF
atch 4 Wage AK1 13 Apr 12.pdf PDF
atch 1 2550 Hot Mix Asphalt.pdf PDF
atch 1 2590 Pavement Markings for Airfields.pdf PDF
atch 1 2575 Spall Repair.pdf PDF
atch 8 Past Performance Instruction.pdf PDF
atch 1 1020 scope.pdf PDF
Atch 5 WeDateElm.pdf PDF
atch 1 2936 Hydro Seeding.pdf PDF
atch 1 2560 Asphalt Tack.pdf PDF
atch 1 2230 Crusher Agg Base Airfields.pdf PDF
atch 6 Contractor Bid Schedules option 6.pdf PDF
atch 1 2595 Pavement Markings for Roads.pdf PDF
atch 3 Form66.pdf PDF
atch 1 2540 Cold Planing.pdf PDF
atch 1 2225 Sub Base.pdf PDF
atch 1 2235 Crusher Agg Base roads.pdf PDF
atch 6 Contractor Bid Schedules Base Year.pdf PDF
atch 1 1 title and table of contents.pdf PDF
atch 7 EPA CLINS.pdf PDF
atch 6 Contractor Bid Schedules Option 4.pdf PDF
atch 1 2530 Asphalt Pavemnet Crack Seal.pdf PDF
atch 6 Contractor Bid Schedules Option 3.pdf PDF
atch 1 2572 Re-Sealing.pdf PDF
atch 1 2576 Hydraulic Cement Repair.pdf PDF
atch 1 2515 Concrete Pavements.pdf PDF
atch 6 Contractor Bid Schedules Option 1.pdf PDF
atch 6 Contractor Bid Schedules Option 2.pdf PDF
atch 1 16370 Electrical Distribution Systems Aerial.pdf PDF
atch 1 2510 Concrete Sidewalks.pdf PDF
atch 1 2100 Asphalt pavements.pdf PDF
atch 10 Subcontractor Teaming Partner Consent Form.pdf PDF
atch 1 1010 General Requirements.pdf PDF
atch 1 1120 Environmental.pdf PDF
atch 1 16375 Electrical Distribution System Underground.pdf PDF
atch 1 2570 Joint Sealing.pdf PDF
atch 1 2567 Rubberized Tar Seal Coat.pdf PDF
Show all 50

Paving Requirements Joint Base Elmendorf-Richardson AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5000-12-R-0001

Attachment 9

Past Performance Questionnaire Cover Sheet\

WHEN FILLED IN THIS DOCUMENT IS SOURCE SELECTION SENSITIVE INFORMATION IAW FAR 3.104

SECTION A: Contractor Information (to be completed by the contractor requesting information prior to mailing)

A. Contractor’s name and address: _____________________________________________________________ B. Point of Contact: _______________________________________________________ C. Phone/Fax/Email Address: _______________________________________________ D. Contract Number: ______________________________________________________ E. Project Title/Description of Work: ___________________________________________________________ F. Contract Type: Firm-Fixed Price Indefinite-Delivery/Indefinite-Quantity Cost-Reimbursement G. Project Award Date: _________________________ Scheduled Completion Date ______________

Current/Final Completion Date ____________ H. Project Award Amount: _____________________ Current/Final Project Amount ____________________ I. Contractor being evaluated performed as the: Prime Contractor Subcontractor Supplier J. Authorization is hereby granted to provided the information requested in SECTION B of this Questionnaire

(Name and Title of Authorizing Official) (Date)

(Signature)

SECTION B: To be completed by the Reference/Evaluator: Please complete the information below, complete the Past Performance Questionnaire on Pages 2 & 3, and return by fax to: Mike Lankford, 673 CONS/LGCA, FAX

907-552-7497, NO LATER THAN THE PROPOSAL DUE DATE.

EVALUATED BY:

(Signature) (Date)

_____________________________________ Address: _____________________________ (Typed or Printed Name) _____________________________________ (Title)

(Phone) (Fax) (/Email)

NOTE: The identity of individual(s) providing reference information SHALL NOT be disclosed.

URGENT! PLEASE RESPOND PROMPTLY

Past Performance Questionnaire

E S M U N

EXCEPTIONAL SATISFACTORY MARGINAL UNSATISFACTORY NOT APPLICABLE

Performance met all contract requirements and exceeded many to the Customer’s benefit. Problems if any were negligible and resolved in a timely, highly effective manner.

Performance met contract requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.

Performance did not meet some contractual requirements. There were some problems of a serious nature, for which corrective action was only marginally effective.

Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.

No past performance record or the record is inconclusive.

EVALUATION AREAS

I. Quality / Technical Performance E S M U N

1. Contractor provided effective quality control and inspection procedures that resulted in a quality-finished project. □ □ □ □ □

2. Contractor developed and submitted realistic progress schedules. □ □ □ □ □

3. Contractor provided well researched and clearly identified submittals that matched contract requirements. □ □ □ □ □

4.

Contractor completed all work with good workmanship and in conformance with the specifications, resulting in minor, if any, punchlist items.

5. Contractor thoroughly reviewed correspondence for accuracy, completeness, and compliance with contract requirements. □ □ □ □ □

6. Adequacy/effectiveness of environmental / safety procedures. □ □ □ □ □ II. Timely Performance E S M U N

1. Contractor met established project schedules to complete the project on time. □ □ □ □ □

2. Contractor proposed alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the customer □ □ □ □ □

3.

Contractor submitted the progress schedule and interim progress reports as required in a timely manner and the schedule was approved prior to actual construction.

4. Contractor provided submittals on time as required. □ □ □ □ □

5. Contractor provided payrolls for both their firm and their subcontractor’s employees as required and scheduled □ □ □ □ □

6. Contractor provided timely resolution of all punchlist items. □ □ □ □ □ III. Management Effectiveness E S M U N

1.

Contractor provided experienced qualified managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

2. Contractor hired quality subcontractors and effectively managed and coordinated their work. □ □ □ □ □

3. Contractor understood/complied with customer objectives and technical requirements. □ □ □ □ □

4. Contractor hired, maintained, and replaced as necessary, qualified personnel and subcontractors/suppliers. □ □ □ □ □

5.

Contractor ensured the site manager had sufficient authority to make decisions and take actions during project performance to keep the project on schedule.

6. Contractor provided timely and satisfactory response to warranty □ □ □ □ □ issues after project completion.

7. Contractor paid employees/subcontractors/suppliers as required. □ □ □ □ □

8. Provided timely/effective contract problem resolution without extensive customer guidance. □ □ □ □ □

9. Contractor proposed alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the customer □ □ □ □ □

IV. Compliance with Labor Standards E S M U N

1. Contractor facilitated labor inspections for determination of compliance with wage determinations and labor standards. □ □ □ □ □

2. Labor posters and wage determinations were displayed as required. □ □ □ □ □

3. Subcontractor acceptance of labor standard clauses submitted as required. □ □ □ □ □

4. Statement of Compliance for payroll reports was submitted as required. □ □ □ □ □

V. Compliance with Safety Standards E S M U N

1. Adequacy of Safety Plan □ □ □ □ □

2. Implementation of Safety Plan □ □ □ □ □ VI. Cost Performance

1. Accuracy in forecasting contract costs □ □ □ □ □

2. Ability to meet forecasted costs and perform within contract costs □ □ □ □ □

3. Ability to alert Government of unforeseen costs before they occur □ □ □ □ □ VII. Overall Performance E S M U N

1. Please rate the contractor’s overall performance □ □ □ □ □

Please discuss each and every response for which you indicated E (Exceptional), M (Marginal) or U (Unsatisfactory) in response to the questions above (use additional sheets, if necessary).

1. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?

Yes___ Default___ Convenience___ Pending Terminations___ No ___

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc).

NARRATIVE SUMMARY:

What were the contractor’s most positive aspects in the performance of the contract?

What were the contractor’s most negative aspects in the performance of the contract?

Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?

Please provide any additional comments concerning this contractor’s performance, as desired.

Thank you for your prompt response and assistance!

Evaluator’s Signature Date

Please return this completed questionnaire to:

673 CONS/LGCA

Attn: Mike Lankford 10480 22nd Street, Suite 254 JBER Elmendorf Richardson AK 99506 907-552-5362 michael.lankford@elmendorf.af.mil mailto:michael.lankford@elmendorf.af.mil�

File details come from the government source that posted it. Updated .