atch 6 Contractor Bid Schedules Option 1.pdf
PDF 92 KB Posted
- Attached to
- Paving Requirements Joint Base Elmendorf-Richardson AK Federal contract opportunity
- Solicitation number
- FA5000-12-R-0001
About this file
atch 6 Contractor Bid Schedules Option 1
View the file
Other files for this federal contract opportunity
Show all 50
Paving Requirements Joint Base Elmendorf-Richardson AK has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ESTIMATED
WORK ITEM ESTIMATED UNIT BID UNIT DOLLAR
QUANTITY PRICE AMOUNT
Removal for Roads and Airfields: Base Year % Increase
B 001 Remove Existing Asphalt to On-Base / On-Post Site 10,000 TONS B 002 Remove Existing Asphalt to Off-Base / Off-Post Site 2,500 TONS B 003 Remove Existing Asphalt [< 2,500 Tons] 6,250 TONS B 004 Cold Plane Existing Asphalt 20,000 SY-IN B 005 Cold Plane Existing Asphalt [< 50,000 SY-IN] 10,000 SY-IN B 006 Sawcut Existing/New Asphalt 15,000 IN-LF B 007 Sawcut Existing/New Concrete 12,200 IN-LF B 008 Remove Existing Base/Subbase 1,500 CY B 009 Remove Existing Base/Subbase [<3,000 CY] 750 CY B 010 Remove Unusable Soil / On-Base / On-Post Site 3,500 CY B 011 Remove Unsuitable Soil / On-Base / On-Post Site 2,500 CY B 012 Remove Unuseable/Unsuitable/ Soil [< 2,000CY] 2,000 CY B 013 Trench Excavation/Backfill 500 CY B 014 Excavation/Backfill Existing Underground Utilities 100 CY B 015 Locates/Potholing for Underground Utilities 50 HR B 016 Soil Excavation/Backfill 40 HR B 017 Drainage Ditch Grading 80 HR B 018 Clearing and Grubbing 10 MSF B 019 Clearing and Grubbing [< 10 MSF] 5 MSF B 020 Clearing and Grubbing / Tree Removal 2 MSF B 021 Remove Underground Storage Tanks 1 EA B 022 Remove Materials to MOA Landfill (Dumping Fees) 50 TONS B 023 Remove Materials to MOA Landfill (No Dumping Fees) 150 TONS B 024 Remove Conduits/Concrete Encased 100 LF B 025 Remove Concrete Vaults 2 EA
New Materials for Roads and Airfields:
B 026 New Classified Backfill/Fill [2" minus] 2,000 TON B 027 New Subbase [3" minus] 4,000 TON B 028 New Pit Run Gravel 2,000 TON B 029 New Subbase/Classified /Pit Run [< 7,500 Tons] 4,000 TONS
Site Work:
B 030 Re-Use Existing Base as Subbase On-site 6,000 CY B 031 Re-Use Exist Base as Subbase On-site [<7,500 CY] 3,000 CY B 032 New Geotextile Fabric 2,000 SY B 033 Surface Prep Existing Subbase/Subgrade 16,500 SY B 034 Surface Prep Existing Base Course 10,500 SY B 035 Surface Prep [<5,000 SY] 2,000 SY B 036 Spray Asphalt Emulsion 2,000 SY
Work Items Predominately for Airfields (AF):
B 037 New Airfield Base Course / Processing 12,500 TONS B 038 New Airfield Base Course / Placement 9,500 TONS B 039 New Airfield Base Course / Drainage Layer 3,000 TONS B 040 New Airfield Base Course / [< 3,500 Tons] 6,250 TONS
B 041 New AF Base Course / [First 10,000 Tons] 10,000 TONS B 042 New AF Base Course / [ > 20,000 Tons] 5,000 TONS
B 043 New AF Asphalt Pavement / Processing 8,500 TONS B 044 New AF Asphalt Pavement (PG52-28) / Placement 2,000 TONS B 045 New AF Asphalt Pavement (PG58-28) / Placement 6,500 TONS B 046 New AF Asphalt Pavement / AF Shoulders / Lights 1,000 TONS B 047 New AF Asphalt Pavement / Runway Patches 1,000 TONS B 048 New AF Asphalt Pavement / Transitions 200 TONS B 049 New AF Asphalt Pavement / [< 2,500 Tons] 5,500 TONS
B 050 New AF AC Pavement / Cold Joint Removal 5,000 LF B 051 Runway Grooving 33,300 SY
FA5000-12-R-0001
Bid Schedule / Option Year 1
FXSB 11-2102 Attachment 6 /Exhibit B Pavements - IDIQ
BID Item #
Section B
JBER Elmendorf-Richardson
WORK ITEM ESTIMATED UNIT BID UNIT DOLLAR
QUANTITY PRICE AMOUNT
FA5000-12-R-0001
Bid Schedule / Option Year 1
FXSB 11-2102 Attachment 6 /Exhibit B Pavements - IDIQ
BID Item #
Section B
JBER Elmendorf-Richardson
B 052 AC Crack Sealing (Routing) 75,000 LF B 053 AC Crack Sealing (No Routing) 7,500 LBS B 054 AC/PCC and AC/AC Joint Sealing 5,000 LF B 055 New JFR Seal Coat (Squeegee-on) 1,000 SY B 056 New JFR Seal Coat (Trowel-on) 250 SY
B 057 Remove Existing Concrete Slabs (Isolated) 750 CY B 058 Remove Existing Concrete Slabs (Continuous) 3,000 CY B 059 Remove Concrete [> 12" Thick] 2,000 CY B 060 Remove Concrete [< 1,200 CY] 1,500 CY B 061 Remove Existing Concrete [Reinforced] 500 CY B 062 Remove Existing Concrete / Sawcutting 5,000 IN-LF
B 063 New Concrete Slabs (Isolated)-Replacement 750 CY B 064 New Concrete Slabs (Continuous)-Replacement 2,000 CY B 065 New Concrete Slabs (Continuous) 1,000 CY B 066 New Concrete Slabs [Crushed Rock] 500 CY B 067 New Concrete Slabs [15% Fly Ash] 500 CY B 068 New Concrete Slabs [25% Fly Ash] 500 CY B 069 New Concrete Slabs [< 12" Thick] 500 CY B 070 New Concrete Slabs [< 600 CY] 600 CY B 071 New Dowels Into Existing Concrete 2,000 EA
B 072 Cold Plane Exist PCC / AC Overlay / Continuous 10,000 SY-IN B 073 Cold Plane Exist PCC / AC Overlay [< 50,000 SY-IN] 5,000 SY-IN B 074 Repair Deteriorated Concrete Joints 2,500 SF
B 075 Concrete Spall Repairs (Isolated) 555 SF B 076 Concrete Spall Repairs (Continuous) 975 SF B 077 Concrete Spall Repairs (Quartz) 275 SF B 078 Concrete Spall Repairs [<250 SF] 250 SF B 079 Concrete Spall Repairs/Sawcutting 500 IN-LF
B 080 Concrete Crack Sealing 1,100 LF B 081 ReSeal Existing Concrete Joints 20,000 LF B 082 New Concrete Joint Sealing 5,000 LF B 083 Replace Grounding / Anchor Rods 25 EA B 084 Pavement Surface Repairs 200 SF B 085 Airfield FOD Clean-up 50 HR B 086 New Blast Deflectors-Taxi Power 200 LF B 087 New Blast Deflectors-Engine Run-up 200 LF B 088 New Pavement Markings for Airfields 20,000 LF B 089 Remove Pavement Markings for Airfields 5,000 LF
Work Items Predominately for Roads:
B 090 Pulverize Existing Asphalt in Place 10,000 SY
B 091 New D-1 Base Course / Processing 13,000 TONS B 092 New D-1 Base Course / Placement 13,000 TONS B 093 New D-1 Base Course / 2"-4" Leveling Course 2,000 TONS B 094 New D-1 Base Course / AF Shoulders Placement 2,000 TONS B 095 New D-1 Base Course / Parking Lots [< 4,000 Tons] 3,000 TONS B 096 New D-1 Base Course / Roads [< 2,500 Tons] 2,500 TONS B 097 New D-1 Base Course / [First 10,000 Tons] 10,000 TONS B 098 New D-1 Base Course / [> 20,000 Tons] 5,000 TONS
B 099 New Road/Parking Lot Asphalt Pavement / Processing 6,500 TONS B 100 New Asphalt Pavement (PG52-28) / Placement 2,000 TONS B 101 New Asphalt Pavement (PG58-28) / Placement 4,500 TONS B 102 New Asphalt Pavement / [Transitions] 200 TONS B 103 New Asphalt Pavement / [Leveling Course] 500 TONS
WORK ITEM ESTIMATED UNIT BID UNIT DOLLAR
QUANTITY PRICE AMOUNT
FA5000-12-R-0001
Bid Schedule / Option Year 1
FXSB 11-2102 Attachment 6 /Exhibit B Pavements - IDIQ
BID Item #
Section B
JBER Elmendorf-Richardson
B 104 New Asphalt Pavement / Parking Lots [< 2,000 Tons] 2,000 TONS B 105 New Asphalt Pavement / Roads [< 1,500 Tons] 1,500 TONS B 106 New Asphalt Pavement / [< 750 Tons] 500 TONS
Asphalt Pavement Adjustment [Airfield & Roads]:
B 107 New AC Pavement (AF & Roads) / [First 10,000 Tons] 10,000 TONS B 108 New AC Pavement (AF & Roads) / [> 25,000 Tons] 5,000 TONS
B 109 5,000 TONS
B 110 5,000 TONS
B 111 5,000 TONS
B 112 5,000 TONS
B 113 New Asphalt Pavement / [PG64-28] 1,000 TONS B 114 New Asphalt Pavement / [PG64-34] 1,000 TONS
Work Items Predominately for Roads:
B 115 New Pavement Markings for Roads/Parking Lots 15,150 LF B 116 New Road Pavement / Cold Joint Removal 5,000 LF B 117 Not Used
B 118 Remove Curbs/Gutters (Isolated) 1,500 LF B 119 Remove Curb/Gutter (Isolated)/Sawcutting 500 LF B 120 Remove Curbs/Gutters (Continuous) 6,000 LF B 121 New Concrete Curbs & Gutters (Isolated) 1,000 LF B 122 New Concrete Curbs & Gutters (Continuous) 2,000 LF B 123 New Concrete Curbs & Gutters (Radius) 500 LF B 124 New Concrete Curbs & Gutters [< 3,600 LF ] 4,000 LF B 125 Remove Concrete Sidewalks (Isolated) 2,000 SY B 126 Remove Sidewalks (Isolated)/Sawcutting 500 LF B 127 Remove Concrete Sidewalks (Continuous) 2,500 SY B 128 New Concrete Sidewalks (Isolated) 2,000 SF B 129 New Concrete Sidewalks (Continuous) 3,000 SF B 130 New Concrete Sidewalks [< 4000 SF] 4,000 SF
B 131 Repair Catch Basins 10 EA B 132 Remove Catch Basins 5 EA B 133 New Curb Opening Catch Basins 5 EA B 134 New Guard Rails 100 LF
Work Items for Repairing Roads:
B 135 AC Crack Sealing (Routing) 25,000 LF B 136 AC Crack Sealing (No Routing) 2,500 LBS B 137 UPM Cold Patch Repair 100 SF B 138 Patching / Pothole Repair / Utility Trench Repairs 1,000 SY B 139 Minor Asphalt Repair 2,000 SY
New Work Items :
B 140 New 4" Topsoil 10 MSF B 141 New 4" Topsoil [< 10 MSF] 5 MSF B 142 New Hydroseeding 10 MSF B 143 New Hydroseeding [< 10 MSF] 5 MSF B 144 New Grass Sod 500 SF B 145 New Trees Planted In Place 20 EA B 146 New Shrubs Planted In Place 50 EA B 147 New Shredded Bark Mulch 2,000 SF B 148 New Contour Grading for Landscaping 2,000 SY B 149 New Bike Trails / Paths 5,000 SY B 150 New Bike/Handicap Access Ramps 25 EA B 151 New Concrete Driveways 1,000 SF B 152 New Concrete Barrier Walls 200 LF B 153 New Concrete Wheel Stops 10 EA B 154 New Encase Conduits in Concrete 20 CY B 155 New Concrete Loading Docks/Handicap Platforms 100 CY B 156 New Metal Handrails 200 LF B 157 New Protective Pipe Bollards 8 EA
New AC Pavement (Non-Airfield) with 30% RAP Added New AC Pavement (Non-Airfield) with 40% RAP Added New AC Pavement (Non-Airfield) with 50% RAP Added
New AC Pavement (Non-Airfield) with 20% RAP Added
WORK ITEM ESTIMATED UNIT BID UNIT DOLLAR
QUANTITY PRICE AMOUNT
FA5000-12-R-0001
Bid Schedule / Option Year 1
FXSB 11-2102 Attachment 6 /Exhibit B Pavements - IDIQ
BID Item #
Section B
JBER Elmendorf-Richardson
B 158 New Traffic / Information Signs on Sign Posts 5 EA
B 159 New 4" diameter PVC Conduit 400 LF B 160 New 4" diameter GRC Conduit 700 LF B 161 New 2" diameter PVC Conduit 150 LF B 162 New 2" diameter GRC Conduit 150 LF B 163 New 4" diameter Split Duct Conduit 50 LF
B 164 New 12" diameter Culvert 200 LF B 165 New 12" diameter Drain Pipe 100 LF B 166 New 24" diameter Drain Pipe 120 LF B 167 New 36" diameter Drain Pipe 60 LF B 168 New Manholes/Catch Basins/Aircraft rated 2 EA B 169 New Drain Rock 200 TONS B 170 New Thaw Pipe In Culverts 100 LF B 171 New EPS Insulation Board 600 SF
Miscellaneous Work Items :
B 172 Adjust Pavement Structures 25 EA B 173 Replace Manhole Covers and Rings 10 EA B 174 Adjust Existing Utilities 10 EA B 175 Relocate Fire Hydrants 2 EA B 176 Relocate POL Pit 1 EA
B 177 Asphalt Crushing 10,000 TONS B 178 Crush Existing Concrete in Place 20,000 TONS B 179 Recycled Asphalt Pavement (Placement) 5,000 TONS B 180 Flagging/Traffic Operation 50 MH B 181 Hauling Material 15,000 TON-MI B 182 Slope Reclamation Using Reject 2,500 TONS B 183 Silt Fencing 500 LF B 184 SWPP Plan 5 EA B 185 Free Zone Barriers 2,000 LF B 186 Remove Unusable Soil (North End of North/South Runway) 500,000 BCY
Testing / Quality Control / Surveying :
B 187 Asphalt Cores 20 EA B 188 Concrete Cores 20 EA B 189 Construction Surveying 350 HOURS B 190 As-Built Survey on CAD 50 HOURS
B 191 Indep Quality Control-Base Course / Subbase 50 LOTS B 192 Indep Quality Control-AC Pavement 100 SUBLOTS B 193 Indep Quality Control-Concrete Pavement 8 LOTS B 194 Testing-Base Course / Subbase 50 LOTS B 195 Testing-Asphalt Pavement 100 SUBLOTS B 196 Testing-Concrete Pavement 8 LOTS
Fuel Contaminated Soils:
B 197 Test Fuel-Contaminated Soil 20 EA B 198 Remediate Fuel-Contaminated Soil 50 TONS
Traffic Lights and Control System:
B 199 Mast/Arm/Post Assembly 4 EA B 200 Extension Pole for Street Light & Photocell 2 EA B 201 Traffic Signal Head & Hardware Type I 2 EA B 202 Traffic Signal Head & Hardware Type II/III/IV 2 EA B 203 Pedestrian Signals, Push Buttons & Signs 4 EA SYS B 204 Traffic Signal Controller Sys / Intersection Style I 1 EA SYS B 205 Traffic Sensor Loop System 4 EA SYS B 206 Secondary Power Service 1 LS B 207 Directional Traffic Signs 6 EA
Light Bases, Light Poles, Heater Outlets:
B 208 Remove Existing Concrete Light Bases 5 EA
WORK ITEM ESTIMATED UNIT BID UNIT DOLLAR
QUANTITY PRICE AMOUNT
FA5000-12-R-0001
Bid Schedule / Option Year 1
FXSB 11-2102 Attachment 6 /Exhibit B Pavements - IDIQ
BID Item #
Section B
JBER Elmendorf-Richardson
B 209 New Concrete Light Bases 5 EA B 210 Raise/Lower Concrete Light Bases in Place 10 EA B 211 New Airfield Light Fixtures / Existing Conc Base 10 EA B 212 Re-Use Existing Airfield Light Fixtures 20 EA B 213 New Airfield Lighting Fixtures-Flush / New Conc Bases 25 EA B 214 New Airfield Lighting Fixtures-Elevated/New Conc Bases 50 EA B 215 New Airfield Lighting Cabling 2,000 LF B 216 New Street/Parking Lot Light Poles 3 EA
B 217 5 EA
B 218 5 EA
B 219 5 EA
B 220 New Head Bolt Heater Outlet Posts / Multiple 16 EA B 221 New Head Bolt Heater Outlet Posts / Singular 4 EA B 222 Secondary Power Service 1 LS
Borrow Pit Materials for Purchase B 223 D-1 Base Course for BCE (On-base Source) 20,000 TONS B 224 Hot Mix PG52-28 Asphalt for BCE (On-base Source) 5,000 TONS
Total of Line Items Bonding
B 225 Bonding Premium 1 LS
PG 52-28 Asphalt oil cost per ton:
PG 58-28 Asphalt oil cost per ton:
Bid Items B001 thru B225:
New Street/Parking Lot Light New Street/Parking Lot Light Pole Arm
Estimated Total for Base Year
New Airfield Ramp Security Lighting
Option 1