About this file
From the source
A. The purpose of this amendment is to remove the column titled Base Year and the column titled increase from bidders schedule option years 1 through 6 of attachment 6. B. This change does not affect the proposal and the closing date is unchanged. C. All other terms and conditions remain unchanged.
Other files for this federal contract opportunity
Other files attached to Paving Requirements Joint Base Elmendorf-Richardson AK, newest first.
File
Type
Posted
Atch 6 Option Year 2.pdf
PDF
May 10, 2012
Atch 6 Option Year 4.pdf
PDF
May 10, 2012
Atch 6 Option Year 1.pdf
PDF
May 10, 2012
Atch 6 Option Year 5.pdf
PDF
May 10, 2012
Atch 6 Option Year 3.pdf
PDF
May 10, 2012
atch 1 1020 scope
—
May 8, 2012
Bid Questions 8 May 12.pdf
PDF
May 8, 2012
atch 4 Wage 20 Apr 12.pdf
PDF
May 2, 2012
FA5000-12-R-0001 solicitation.doc
DOC document
Apr 19, 2012
FA5000-12-R-0001 Sol 18 Apr 12.doc
DOC document
Apr 19, 2012
atch 6 Contractor Bid Schedules Summary.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules option 5.pdf
PDF
Apr 18, 2012
atch 1 1121 Accumulation.pdf
PDF
Apr 18, 2012
atch 4 Wage AK1 13 Apr 12.pdf
PDF
Apr 18, 2012
atch 1 2550 Hot Mix Asphalt.pdf
PDF
Apr 18, 2012
atch 1 2590 Pavement Markings for Airfields.pdf
PDF
Apr 18, 2012
atch 1 2575 Spall Repair.pdf
PDF
Apr 18, 2012
atch 8 Past Performance Instruction.pdf
PDF
Apr 18, 2012
atch 1 1020 scope.pdf
PDF
Apr 18, 2012
atch 1 1010 General Requirements.pdf
PDF
Apr 18, 2012
atch 1 1120 Environmental.pdf
PDF
Apr 18, 2012
atch 1 16375 Electrical Distribution System Underground.pdf
PDF
Apr 18, 2012
atch 1 2570 Joint Sealing.pdf
PDF
Apr 18, 2012
atch 1 2567 Rubberized Tar Seal Coat.pdf
PDF
Apr 18, 2012
atch 9 Past Performance Questionnaire.pdf
PDF
Apr 18, 2012
Atch 2 drawings Apt 11.pdf
PDF
Apr 18, 2012
atch 7 EPA CLINS.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules Option 4.pdf
PDF
Apr 18, 2012
atch 1 2530 Asphalt Pavemnet Crack Seal.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules Option 3.pdf
PDF
Apr 18, 2012
atch 1 2572 Re-Sealing.pdf
PDF
Apr 18, 2012
atch 1 2576 Hydraulic Cement Repair.pdf
PDF
Apr 18, 2012
atch 1 2515 Concrete Pavements.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules Option 1.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules Option 2.pdf
PDF
Apr 18, 2012
atch 1 16370 Electrical Distribution Systems Aerial.pdf
PDF
Apr 18, 2012
atch 1 2510 Concrete Sidewalks.pdf
PDF
Apr 18, 2012
atch 1 2100 Asphalt pavements.pdf
PDF
Apr 18, 2012
atch 10 Subcontractor Teaming Partner Consent Form.pdf
PDF
Apr 18, 2012
Atch 5 WeDateElm.pdf
PDF
Apr 18, 2012
atch 1 2936 Hydro Seeding.pdf
PDF
Apr 18, 2012
atch 1 2560 Asphalt Tack.pdf
PDF
Apr 18, 2012
atch 1 2230 Crusher Agg Base Airfields.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules option 6.pdf
PDF
Apr 18, 2012
atch 1 2595 Pavement Markings for Roads.pdf
PDF
Apr 18, 2012
atch 3 Form66.pdf
PDF
Apr 18, 2012
atch 1 2540 Cold Planing.pdf
PDF
Apr 18, 2012
atch 1 2225 Sub Base.pdf
PDF
Apr 18, 2012
atch 1 2235 Crusher Agg Base roads.pdf
PDF
Apr 18, 2012
atch 6 Contractor Bid Schedules Base Year.pdf
PDF
Apr 18, 2012
Show all 50
Paving Requirements Joint Base Elmendorf-Richardson AK has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Nov 14, 2017 .