Attachment_17_-_AF_Form_592_Hot_Work_Permit_-_4_Sep_2012.pdf

PDF 82 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4855-18-R-0003
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 17. AF Form 592 Hot Works Permit 4 Sep 2012

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER), newest first.
File Type Posted
FA485518R0003_Amendment_5.pdf PDF
Attachment_46_-_Past_Performance_Information_Sheet_20_May.pdf PDF
Questions_and_Answers_Part_6.pdf PDF
FA485518R0003_Amendment_0004.pdf PDF
FA485518R0003_Amendment_0003.pdf PDF
FA485518R0003_Q&A_Part_5.pdf PDF
Attachment_01-_SABER_General_Requirements_-_12_Jan_2018.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_41_-_Sample_Project_Attachment_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_3.pdf PDF
FA485518R0003_Amendment_1.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_10_Jan_2018.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_10_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_2.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part1.CAFB.pdf PDF
Site_Visit_Sign_In_Sheet_Redacted.pdf PDF
Attachment_33-_WD_NM50_Highway_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_09_-_GeoBase_Initial_Operating_Capability_-_19_May_2010.pdf PDF
Attachment_44_-_Additional_Contractor_Information_-_no_date.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_31_Aug_2017.PDF PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_21_Nov_2017.pdf PDF
Attachment_25_-_AF_Carpet_Standard_-_ETL_07_4_-_28_Mar_2007.pdf PDF
Attachment_24_-_Statement_of_Work_Example_-15_Sep_2017.pdf PDF
Attachment_16_-_AF_Form_103v10_Work_Clearance_Request_-_29_Feb_2015.pdf PDF
Attachment_26_-_As-Built_Submittal_Guidelines_-_3_Feb_2014.pdf PDF
Attachment_01-_SABER_General_Requirements_-_6_Oct_2017.pdf PDF
Attachment_30-_NMGRT_Invoice_Certification_-_no_date.pdf PDF
Attachment_14_-_AF_Form_66_Schedule_of_Material_Submittals_-_no_date.pdf PDF
Attachment_32-_WD_NM5_Residential_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_06_-_CAFB_Landscape_Development_Plan_-_3_Feb_2012.pdf PDF
Attachment_34-_WD_NM23_Building_Curry_-_22_Sep_2017.pdf PDF
Attachment_05_-_CAFB_Hardware_Specifications_Guideline_-_Nov_2016.pdf PDF
Attachment_36-_WD_NM7_Heavy_Curry_-_15_Sep_2017.pdf PDF
Attachment_37-_WD_NM12_Heavy_Roosevelt_-_15_Sep_17.pdf PDF
Attachment_08_-_AFSOC_Facility_Excellence_Guide_-_2008.pdf PDF
Attachment_04_-_CAFB_Electrical_Standards_-_Apr_2016.pdf PDF
Attachment_27_-_Contractor_Base_Briefing_-_23_Mar_2016.pdf PDF
Attachment_39-_Past.Present_Performance_Questionnaire_-_no_date.pdf PDF
Attachment_13_-_AF_Form_3065_-_Contract_Progress_Report_-_1_Apr_1996.pdf PDF
Attachment_23_-_CAFB_MAFR_Contractor_Env_Guide__Appendix_A_&_B_Forms_-_2_Jul_2015.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_22_Aug_2017.pdf PDF
Attachment_35-_WD_NM34_Building_Roosevelt_-_22_Sep_2017.pdf PDF
Attachment_10_-_US_Army_Corps_Of_Engineer_Design_Manual_-_Mar_2007.pdf PDF
Attachment_38-_Financial_Reference_Worksheet_-_no_date.pdf PDF
Attachment_28_-_Cost_Estimate_Example_-_no_date.pdf PDF
Attachment_02_-_SABER_Specifications_-_14_Nov_2017.pdf PDF
FA485518R0003_-_SABER.pdf PDF
Attachment_22_-_CAFB_MAFR_Contractor_Env_Guide_-_2_Jul_2015.pdf PDF
Attachment_31-_NMGRT_Proposal_Certification_-_no_date.pdf PDF
Show all 50

Simplified Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 592, 20120904

USAF HOT WORK PERMIT

1. Control Number

2. Date Permit Issued 3. Time Permit Issued 4. Expiration (Date and Time)

5. Company/Organization 6. Company/Organization Phone Number

7. Location

8. Description of Work

9. Is Fire Watch required?

Performed by: Permit Authorizing Individual (PAI)

Fire Watch

10. Before approving any hot work permit, the PAI shall inspect the work area and confirm that precautions have been taken to prevent fire IAW AFI 91-203 and NFPA 51B.

Sprinklers in service

Adequate ventilation

Hot work equipment in good repair

Pressure cylinders are secured properly

Portable fire extinguishers are provided (20 BC rated - immediate area / 80 BC rating back-up wheeled extinguisher)

Explosive atmosphere eliminated (WITHIN 16 M (50 FT) OF WORK)

Flammable liquids, vapors and gases removed

Remove combustibles where possible. Otherwise protect with fire-resistant tarpaulins or metal shields

Floors swept clean of combustibles

Appropriate shields are used

Wall and floor openings are covered

Combustible floors wet down, covered with damp sand, or fire-resistant shields

Any special precautions needed

11. The location where the work is to be performed has been examined, necessary precautions taken and permission is granted for stated work.

Name:

Signed:

Permit Authorizing Individual (PAI)

12. I am fully qualified to perform this operation, understand my responsibilities and my equipment meets all requirements as outlined in AFI 91-203 and NFPA 51B.

Name:

Signed:

Operator or On-scene supervisor

13. Has this process been evaluated by installation Bioenvironmental Engineering? If “Yes,” attach documentation (BE Survey Report, PPE List, etc.). If “No,” obtain BE coordination below.

Name:

Signed/Date:

14. FINAL CHECK: Work area and all adjacent areas to which sparks and heat might spread, including floors above and below and opposite side of walls, were inspected at least 30 minutes or later after the work was completed and were found fire safe.

Name:

Signed:

Facility Number

Aircraft Tail Number

Other:

Floor Number

Inside Hanger Outside Hanger

Yes No

Operator/Supervisor

Contact Number:

Duty Title:

File details come from the government source that posted it.