Attachment_17_-_AF_Form_592_Hot_Work_Permit_-_4_Sep_2012.pdf
PDF 82 KB Posted
- Attached to
- Simplified Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4855-18-R-0003
About this file
Attachment 17. AF Form 592 Hot Works Permit 4 Sep 2012
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Base Engineering Requirements (SABER) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 592, 20120904
USAF HOT WORK PERMIT
1. Control Number
2. Date Permit Issued 3. Time Permit Issued 4. Expiration (Date and Time)
5. Company/Organization 6. Company/Organization Phone Number
7. Location
8. Description of Work
9. Is Fire Watch required?
Performed by: Permit Authorizing Individual (PAI)
Fire Watch
10. Before approving any hot work permit, the PAI shall inspect the work area and confirm that precautions have been taken to prevent fire IAW AFI 91-203 and NFPA 51B.
Sprinklers in service
Adequate ventilation
Hot work equipment in good repair
Pressure cylinders are secured properly
Portable fire extinguishers are provided (20 BC rated - immediate area / 80 BC rating back-up wheeled extinguisher)
Explosive atmosphere eliminated (WITHIN 16 M (50 FT) OF WORK)
Flammable liquids, vapors and gases removed
Remove combustibles where possible. Otherwise protect with fire-resistant tarpaulins or metal shields
Floors swept clean of combustibles
Appropriate shields are used
Wall and floor openings are covered
Combustible floors wet down, covered with damp sand, or fire-resistant shields
Any special precautions needed
11. The location where the work is to be performed has been examined, necessary precautions taken and permission is granted for stated work.
Name:
Signed:
Permit Authorizing Individual (PAI)
12. I am fully qualified to perform this operation, understand my responsibilities and my equipment meets all requirements as outlined in AFI 91-203 and NFPA 51B.
Name:
Signed:
Operator or On-scene supervisor
13. Has this process been evaluated by installation Bioenvironmental Engineering? If “Yes,” attach documentation (BE Survey Report, PPE List, etc.). If “No,” obtain BE coordination below.
Name:
Signed/Date:
14. FINAL CHECK: Work area and all adjacent areas to which sparks and heat might spread, including floors above and below and opposite side of walls, were inspected at least 30 minutes or later after the work was completed and were found fire safe.
Name:
Signed:
Facility Number
Aircraft Tail Number
Other:
Floor Number
Inside Hanger Outside Hanger
Yes No
Operator/Supervisor
Contact Number:
Duty Title: