Attachment_28_-_Cost_Estimate_Example_-_no_date.pdf
PDF 733 KB Posted
- Attached to
- Simplified Base Engineering Requirements (SABER) Federal contract opportunity
- Solicitation number
- FA4855-18-R-0003
About this file
Attachment 28. Cost Estimate Example no date
View the file
Other files for this federal contract opportunity
Show all 50
Simplified Base Engineering Requirements (SABER) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTE 1: The above example is only one component (the Cost Proposal) of the SABER
Design Package (SDP). The cost shown for the line items are not from current RS MEAN cost data. The example calculations, the CCI, Coefficient, and Taxes, show the calculation process of the software only and do not represent actual CCI, Coefficients, or Tax rate for this contract.
NOTE 2: The unit price per unit of measure above shall have a further breakdown of labor, material and equipment by accessing the computer software. The detailed estimate should be prepared using the computer software which breaks down the Cost Proposal PPI.
NOTE 3: The total of all items shown above is a “raw” cost or the total for UPB Bare Cost and must be multiplied by the applicable coefficient factor to arrive at the total TO cost
Attachment 28 FA4855-18-R-0003