Attachment_28_-_Cost_Estimate_Example_-_no_date.pdf

PDF 733 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA4855-18-R-0003
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 28. Cost Estimate Example no date

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER), newest first.
File Type Posted
Attachment_46_-_Past_Performance_Information_Sheet_20_May.pdf PDF
FA485518R0003_Amendment_5.pdf PDF
FA485518R0003_Amendment_0004.pdf PDF
Questions_and_Answers_Part_6.pdf PDF
FA485518R0003_Amendment_0003.pdf PDF
Attachment_01-_SABER_General_Requirements_-_12_Jan_2018.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_5.pdf PDF
Attachment_41_-_Sample_Project_Attachment_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_3.pdf PDF
FA485518R0003_Amendment_1.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_10_Jan_2018.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_10_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_2.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part1.CAFB.pdf PDF
Site_Visit_Sign_In_Sheet_Redacted.pdf PDF
Attachment_06_-_CAFB_Landscape_Development_Plan_-_3_Feb_2012.pdf PDF
Attachment_34-_WD_NM23_Building_Curry_-_22_Sep_2017.pdf PDF
Attachment_05_-_CAFB_Hardware_Specifications_Guideline_-_Nov_2016.pdf PDF
Attachment_36-_WD_NM7_Heavy_Curry_-_15_Sep_2017.pdf PDF
Attachment_37-_WD_NM12_Heavy_Roosevelt_-_15_Sep_17.pdf PDF
Attachment_08_-_AFSOC_Facility_Excellence_Guide_-_2008.pdf PDF
Attachment_04_-_CAFB_Electrical_Standards_-_Apr_2016.pdf PDF
Attachment_27_-_Contractor_Base_Briefing_-_23_Mar_2016.pdf PDF
Attachment_39-_Past.Present_Performance_Questionnaire_-_no_date.pdf PDF
Attachment_13_-_AF_Form_3065_-_Contract_Progress_Report_-_1_Apr_1996.pdf PDF
Attachment_23_-_CAFB_MAFR_Contractor_Env_Guide__Appendix_A_&_B_Forms_-_2_Jul_2015.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_22_Aug_2017.pdf PDF
Attachment_35-_WD_NM34_Building_Roosevelt_-_22_Sep_2017.pdf PDF
Attachment_10_-_US_Army_Corps_Of_Engineer_Design_Manual_-_Mar_2007.pdf PDF
Attachment_38-_Financial_Reference_Worksheet_-_no_date.pdf PDF
Attachment_33-_WD_NM50_Highway_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_09_-_GeoBase_Initial_Operating_Capability_-_19_May_2010.pdf PDF
Attachment_44_-_Additional_Contractor_Information_-_no_date.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_31_Aug_2017.PDF PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_21_Nov_2017.pdf PDF
Attachment_25_-_AF_Carpet_Standard_-_ETL_07_4_-_28_Mar_2007.pdf PDF
Attachment_24_-_Statement_of_Work_Example_-15_Sep_2017.pdf PDF
Attachment_16_-_AF_Form_103v10_Work_Clearance_Request_-_29_Feb_2015.pdf PDF
Attachment_26_-_As-Built_Submittal_Guidelines_-_3_Feb_2014.pdf PDF
Attachment_17_-_AF_Form_592_Hot_Work_Permit_-_4_Sep_2012.pdf PDF
Attachment_01-_SABER_General_Requirements_-_6_Oct_2017.pdf PDF
Attachment_30-_NMGRT_Invoice_Certification_-_no_date.pdf PDF
Attachment_14_-_AF_Form_66_Schedule_of_Material_Submittals_-_no_date.pdf PDF
Attachment_32-_WD_NM5_Residential_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_02_-_SABER_Specifications_-_14_Nov_2017.pdf PDF
FA485518R0003_-_SABER.pdf PDF
Attachment_22_-_CAFB_MAFR_Contractor_Env_Guide_-_2_Jul_2015.pdf PDF
Attachment_31-_NMGRT_Proposal_Certification_-_no_date.pdf PDF
Show all 50

Simplified Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTE 1: The above example is only one component (the Cost Proposal) of the SABER

Design Package (SDP). The cost shown for the line items are not from current RS MEAN cost data. The example calculations, the CCI, Coefficient, and Taxes, show the calculation process of the software only and do not represent actual CCI, Coefficients, or Tax rate for this contract.

NOTE 2: The unit price per unit of measure above shall have a further breakdown of labor, material and equipment by accessing the computer software. The detailed estimate should be prepared using the computer software which breaks down the Cost Proposal PPI.

NOTE 3: The total of all items shown above is a “raw” cost or the total for UPB Bare Cost and must be multiplied by the applicable coefficient factor to arrive at the total TO cost

Attachment 28 FA4855-18-R-0003

File details come from the government source that posted it.