Attachment 42. Seed Project Statement Of Objectives 21 Nov 2017

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Base Engineering Requirements (SABER), newest first.
File Type Posted
Attachment_45_-_Education.Experience_Matrix_20_May.pdf PDF
Attachment_46_-_Past_Performance_Information_Sheet_20_May.pdf PDF
FA485518R0003_Amendment_0004.pdf PDF
FA485518R0003_Amendment_0003.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_18_Jan_2018.pdf PDF
Attachment_01-_SABER_General_Requirements_-_12_Jan_2018.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_41_-_Sample_Project_Attachment_-_18_Jan_2018.pdf PDF
FA4855-18-R-0003_Amendment_0002.pdf PDF
FA485518R0003_Q&A_Part_4.pdf PDF
Pre-Proposal_Site_Visit_Memo.Addendum.pdf PDF
FA485518R0003_Q&A_Part_3.pdf PDF
FA485518R0003_Amendment_1.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_10_Jan_2018.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_10_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_2.pdf PDF
Site_Visit_Sign_In_Sheet_Redacted.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part2.MAFR.pdf PDF
FA485518R0003_Q&A_Part_1.pdf PDF
Attachment_20_-_Base_Contractor_Storage_Lot_Agreement_-_no_date.pdf PDF
Attachment_21_-_Contractor_Security_Handbook_-_8_Oct_2015.pdf PDF
Attachment_41_-_Sample_Project_Attachments_-_no_date.pdf PDF
Attachment_11_-_UFC_1-300-8,_Real_Property_Transfer_with_change_-_2_Aug_2011.pdf PDF
Attachment_18_-_Building_Custruction_1354_Checklist_-_7_Feb_2010.pdf PDF
Attachment_15_-_AF_Form_3000_Material_Approval_Submittal_-_1_Sep_2003.pdf PDF
Attachment_07_-_AEC_CAD_Standards_-_Aug_2015.pdf PDF
Attachment_12_-_AF_Form_3064_-_Progress_Schedule_-_1_Sep_2003.pdf PDF
Attachment_19_-_CAFB_Labeling_Standards_for_Communications_-_29_Jan_2009.pdf PDF
Attachment_03_-_Example_Drawings_-_May_1975.pdf PDF
Attachment_06_-_CAFB_Landscape_Development_Plan_-_3_Feb_2012.pdf PDF
Attachment_34-_WD_NM23_Building_Curry_-_22_Sep_2017.pdf PDF
Attachment_05_-_CAFB_Hardware_Specifications_Guideline_-_Nov_2016.pdf PDF
Attachment_36-_WD_NM7_Heavy_Curry_-_15_Sep_2017.pdf PDF
Attachment_37-_WD_NM12_Heavy_Roosevelt_-_15_Sep_17.pdf PDF
Attachment_08_-_AFSOC_Facility_Excellence_Guide_-_2008.pdf PDF
Attachment_04_-_CAFB_Electrical_Standards_-_Apr_2016.pdf PDF
Attachment_27_-_Contractor_Base_Briefing_-_23_Mar_2016.pdf PDF
Attachment_39-_Past.Present_Performance_Questionnaire_-_no_date.pdf PDF
Attachment_13_-_AF_Form_3065_-_Contract_Progress_Report_-_1_Apr_1996.pdf PDF
Attachment_23_-_CAFB_MAFR_Contractor_Env_Guide__Appendix_A_&_B_Forms_-_2_Jul_2015.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_22_Aug_2017.pdf PDF
Attachment_35-_WD_NM34_Building_Roosevelt_-_22_Sep_2017.pdf PDF
Attachment_10_-_US_Army_Corps_Of_Engineer_Design_Manual_-_Mar_2007.pdf PDF
Attachment_38-_Financial_Reference_Worksheet_-_no_date.pdf PDF
Attachment_28_-_Cost_Estimate_Example_-_no_date.pdf PDF
Attachment_02_-_SABER_Specifications_-_14_Nov_2017.pdf PDF
FA485518R0003_-_SABER.pdf PDF
Attachment_22_-_CAFB_MAFR_Contractor_Env_Guide_-_2_Jul_2015.pdf PDF
Attachment_31-_NMGRT_Proposal_Certification_-_no_date.pdf PDF
Show all 50

Simplified Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

Relocate Fuel Tanks to Range Compound

PXL Y 14-0455

Revised 21 Nov 2017

J. OBJECTIVE: Construct a new vehicle fueling station in the Northwest Development Area

(NWDA) on Melrose Air Force Bombing Range, with an option to decommission current vehicle refueling area at the B&G.

2. WORK LOCATION: Melrose Air Force Range, NM.

3. PRINCIPAL FEATURES: The work required is to include but is not limited to the furnishing of materials, equipment, facilities, transportation, labor, and supervision required to accomplish the following:

3.1 Construct

3.1.1 Construct a reinforced concrete pad that will hold the three new fuel tanks, identified in Para. 3 .3 of this document, within the footprint while allowing separation required in NFPA 30. Pad shall incorporate spill containment system outlined in UFC 3-460-01 Para. 8-14.

3.1.2 Construct reinforced concrete fueling pad and drive way adjacent to the fuel tank pad, a minimum of 12' wide. Driveway shall connect to the nearest road way, with a dedicated entryway and exit. Fueling pad and driveway shall be constructed to hold fully laden Fire vehicles and commercial farming equipment.

Concrete fueling pad shall be sloped at 1 percent away from fuel tanks IA W UFC 3-460-01 Para. 7-3.5.

3.1.3 All concrete pads shall be constructed of 5000 PSI concrete, 8" thick with #5 rebar, cen(ered in pad placed at 6" O.C. each way. Footers to be constructed to incorporate the bollards into rebar cage, with minimum of 6" concrete below bottom of bollard. Sawcut 2" deep control joint every 16'. Install 6 mil polyethylene sheeting under fuel tank pad and fueling pad.

3 .1.4 Containment sump in drivepath underneath dispensing area, is required unless the dispenser is located within secondary containment.

3.1.5 Excavate existing soil in pad and driveway footprint three feet below existing grade and replace with compacted engineered fill. Compact engineered fill to 95% in six inch lifts. Excavated soil shall be dumped at a site 3 .3 miles from project site.

3.1.6 Fuel tank pad shall have 6" steel bollards placed at 4 foot O.C. around entire pad perimeter. Adjust as necessary to facilitate placement, with no bollard more than 4' O.C. Bollards shall be concrete filled. Bollards at rear of pad shall be removable to allow servicing/removal of tanks, and need not be concrete filled.

3.1.7 Construct a rigid pre-engineered canopy system, with a minimum clearance height of 12' above finished concrete driveway. Canopy system shall cover fuel tank pad only, IAW UFC 3-460-01 Para. 7-3.7. Slope canopy to drain to back of

PXL Y 14-0455 Page I of 5