Multiple Award Construction Contract (MACC)

Awarded Award Notice Posted

Solicitation number
FA9401-12-R-0002
Agency
Global Strike Command Air Force, Department of Defense
Awarded
to Dawn Incorporated And Mctech Corp, JV
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
FA9401-14-D-0006 Federal IDV award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Kirtland AFB, NM 87117 Kirtland AFB, New Mexico 87117, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Feb 02, 2012 12:53 pm Modified: Mar 22, 2012 4:56 pmTrack Changes

General Information


Document Type: Solicitation Notice
Solicitation Number: FA9401-12-R-0002
Classification Code: Y - Construction of Structures and facilities
Set Aside: Competitive 8(a) Set-Aside
NAICS Code: 236220 - Commercial and Institutional Building Construction


Contracting Office Address


AFNWC/PKO
2000 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKOD is soliciting a Competitive 8(a) Set-Aside, Firm Fixed Price Multiple Award Construction Contract (MACC) to provide indefinite delivery/indefinite quantity and design-build construction efforts to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. Competition will be restricted to companies with a bona fide place of business in the State of New Mexico, SBA's Acceptance Letter #0682/12/201593/01. A determination/approval of a bona fide place of business must be acquired through the Small Business Administration. Current A&E contractors on contract at Kirtland AFB are not permitted to participate. Foreign contractors will not be permitted to participate at the prime contractor level. This acquisition will encompass requirements that have, in the past, been acquired utilizing the Base Maintenance Contract. Individual Task Order work will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. Task Order limits will be $2,000 to $3,000,000. The contractor shall provide all material, equipment, labor and general conditions to accomplish design, maintenance, repair, and minor construction projects in an expeditious manner. The maximum program value (combined value of all task orders from all awarded contracts) is not to exceed $64M over a five-year period. Each contract awarded will contain a basic 12-month base period and four 12-month option periods.



Work to be performed under the MACC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 Construction, Subsection 236 Construction of Buildings size standard $33.5M and Subsection 237 Heavy and Civil Engineering Construction, size standard $33.5M. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement and removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, painting, roofing and paving. Locations of work will be at Kirtland AFB, NM. Offers are solicited only from business concerns current in the Central Contractor Registration (CCR), and North American Industry Classification System (NAICS)
Code 236220 must specifically be included in the Offerors approved business plan.


The Request for Proposal (RFP) utilizes best value source selection procedures described in Federal Acquisition Regulation (FAR) 15.3, Defense Federal Acquisition Regulation Supplement (DFARS) 215.3, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3 and MP 5315.3, targeted toward a Competitive 8(a) set-a-side with a 30-day response time (offers due 30 days after issuing). In using this approach, the Government seeks to award up to six (6) contracts to 8(a) small businesses, who give the Air Force the greatest confidence that they can meet the requirements for up to 100% design and construction expertise on infrastructure renovation, repair, new construction, roads, and/or airfield work. The solicitation will include a design/build seed project that will be used to evaluate these capabilities. The seed project consists of a facility expansion, LRPD Advanced HPM Research Facility Expansion (Project # MHMV 110112). The seed project magnitude is between $1,000,000 to $5,000,000.


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors:


1) Technical/Technical Risk
2) Past Performance
3) Cost/Price


Within the Technical/Technical Risk Factor the following 4 sub-factors will be used:


a) Organizational Structure and Staffing
b) Technical Capability/Execution and Completeness of the Seed Project
c) Change and Cost Control Management
d) Quality Control Program


The Technical/Technical Risk and Past Performance factors will be afforded primary emphasis in the evaluation, are considered equal in importance, and, when combined, are significantly more important than the Cost/Price factor. Cost/Price, however, will contribute substantially to the selection decision and will be assessed for reasonableness. The sub-factors within the Technical/Technical Risk Factor are considered equal in importance.


The price for the Seed Project will be evaluated IAW DFARS 252.236-7007. The priorities in the price schedule (RFP Attachment 32) apply and are as follows:


1. Additive Bid Item #1 - Crane
2. Additive Bid Item #2 - Future Power


Up to six (6) highest rated offerors from the source selection will receive a basic contract award. The highest rated offeror will be awarded the seed project, which satisfies the contract minimum requirement. All remaining awardees will be awarded an initial $2,000 Task Order for the MACC Orientation Seminar to satisfy the contract minimum requirement. All future task orders will be competed among all the contract awardees.


The solicitation is available in electronic format only. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.


 

Update #5 ·

Added: Feb 02, 2012 12:53 pm Modified: Mar 20, 2012 9:43 amTrack Changes

General Information


Document Type: Solicitation Notice
Solicitation Number: FA9401-12-R-0002
Classification Code: Y - Construction of Structures and facilities
Set Aside: Competitive 8(a) Set-Aside
NAICS Code: 236220 - Commercial and Institutional Building Construction


Contracting Office Address


AFNWC/PKO
2000 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKOD is soliciting a Competitive 8(a) Set-Aside, Firm Fixed Price Multiple Award Construction Contract (MACC) to provide indefinite delivery/indefinite quantity and design-build construction efforts to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. Competition will be restricted to companies with a bona fide place of business in the State of New Mexico, SBA's Acceptance Letter #0682/12/201593/01. A determination/approval of a bona fide place of business must be acquired through the Small Business Administration. Current A&E contractors on contract at Kirtland AFB are not permitted to participate. Foreign contractors will not be permitted to participate at the prime contractor level. This acquisition will encompass requirements that have, in the past, been acquired utilizing the Base Maintenance Contract. Individual Task Order work will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. Task Order limits will be $2,000 to $10,000,000. The contractor shall provide all material, equipment, labor and general conditions to accomplish design, maintenance, repair, and minor construction projects in an expeditious manner. The maximum program value (combined value of all task orders from all awarded contracts) is not to exceed $64M over a five-year period. Each contract awarded will contain a basic 12-month base period and four 12-month option periods.



Work to be performed under the MACC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 Construction, Subsection 236 Construction of Buildings size standard $33.5M and Subsection 237 Heavy and Civil Engineering Construction, size standard $33.5M. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement and removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, painting, roofing and paving. Locations of work will be at Kirtland AFB, NM. Offers are solicited only from business concerns current in the Central Contractor Registration (CCR), and North American Industry Classification System (NAICS)
Code 236220 must specifically be included in the Offerors approved business plan.


The Request for Proposal (RFP) utilizes best value source selection procedures described in Federal Acquisition Regulation (FAR) 15.3, Defense Federal Acquisition Regulation Supplement (DFARS) 215.3, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3 and MP 5315.3, targeted toward a Competitive 8(a) set-a-side with a 30-day response time (offers due 30 days after issuing). In using this approach, the Government seeks to award up to six (6) contracts to 8(a) small businesses, who give the Air Force the greatest confidence that they can meet the requirements for up to 100% design and construction expertise on infrastructure renovation, repair, new construction, roads, and/or airfield work. The solicitation will include a design/build seed project that will be used to evaluate these capabilities. The seed project consists of a facility expansion, LRPD Advanced HPM Research Facility Expansion (Project # MHMV 110112). The seed project magnitude is between $1,000,000 to $5,000,000.


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors:


1) Technical/Technical Risk
2) Past Performance
3) Cost/Price


Within the Technical/Technical Risk Factor the following 4 sub-factors will be used:


a) Organizational Structure and Staffing
b) Technical Capability/Execution and Completeness of the Seed Project
c) Change and Cost Control Management
d) Quality Control Program


The Technical/Technical Risk and Past Performance factors will be afforded primary emphasis in the evaluation, are considered equal in importance, and, when combined, are significantly more important than the Cost/Price factor. Cost/Price, however, will contribute substantially to the selection decision and will be assessed for reasonableness. The sub-factors within the Technical/Technical Risk Factor are considered equal in importance.


The price for the Seed Project will be evaluated IAW DFARS 252.236-7007. The priorities in the price schedule (RFP Attachment 32) apply and are as follows:


1. Additive Bid Item #1 - Crane
2. Additive Bid Item #2 - Future Power


Up to six (6) highest rated offerors from the source selection will receive a basic contract award. The highest rated offeror will be awarded the seed project, which satisfies the contract minimum requirement. All remaining awardees will be awarded an initial $2,000 Task Order for the MACC Orientation Seminar to satisfy the contract minimum requirement. All future task orders will be competed among all the contract awardees.


The solicitation is available in electronic format only. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.


 

Update #4 ·

Added: Feb 02, 2012 12:53 pm Modified: Feb 24, 2012 3:03 pmTrack Changes

General Information


Document Type: Pre-solicitation Notice
Solicitation Number: FA9401-12-R-0002
Classification Code: Y - Construction of Structures and facilities
Set Aside: Competitive 8(a) Set-Aside
NAICS Code: 236220 - Commercial and Institutional Building Construction


Contracting Office Address


AFNWC/PKO
2000 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKOD will be soliciting a Competitive 8(a) Set-Aside, Firm Fixed Price Multiple Award Construction Contract (MACC) to provide indefinite delivery/indefinite quantity and design-build construction efforts to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. Competition will be restricted to companies with a bona fide place of business in the State of New Mexico, SBA's Acceptance Letter #0682/12/201593/01. A determination/approval of a bona fide place of business must be acquired through the Small Business Administration. Current A&E contractors on contract at Kirtland AFB are not permitted to participate. Foreign contractors will not be permitted to participate at the prime contractor level. This acquisition will encompass requirements that have, in the past, been acquired utilizing the Base Maintenance Contract. Individual Task Order work will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. Task Order limits will be $2,000 to $10,000,000. The contractor shall provide all material, equipment, labor and general conditions to accomplish design, maintenance, repair, and minor construction projects in an expeditious manner. The maximum program value (combined value of all task orders from all awarded contracts) is not to exceed $64M over a five-year period. Each contract awarded will contain a basic 12-month base period and four 12-month option periods.



Work to be performed under the MACC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 Construction, Subsection 236 Construction of Buildings size standard $33.5M and Subsection 237 Heavy and Civil Engineering Construction, size standard $33.5M. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement and removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, painting, roofing and paving. Locations of work will be at Kirtland AFB, NM. Offers are solicited only from business concerns current in the Central Contractor Registration (CCR), and North American Industry Classification System (NAICS)
Code 236220 must specifically be included in the Offerors approved business plan.


A Request for Proposal (RFP) is contemplated utilizing best value source selection procedures described in Federal Acquisition Regulation (FAR) 15.3, Defense Federal Acquisition Regulation Supplement (DFARS) 215.3, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3 and MP 5315.3, targeted toward a Competitive 8(a) set-a-side with a 30-day response time (offers due 30 days after issuing). In using this approach, the Government seeks to award up to six (6) contracts to 8(a) small businesses, who give the Air Force the greatest confidence that they can meet the requirements for up to 100% design and construction expertise on infrastructure renovation, repair, new construction, roads, and/or airfield work. The solicitation will include a design/build seed project that will be used to evaluate these capabilities. The seed project consists of a facility expansion, LRPD Advanced HPM Research Facility Expansion (Project # MHMV 110112). The seed project magnitude is between $1,000,000 to $5,000,000.


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors:


1) Technical/Technical Risk
2) Past Performance
3) Cost/Price


Within the Technical/Technical Risk Factor the following 4 sub-factors will be used:


a) Organizational Structure and Staffing
b) Technical Capability/Execution and Completeness of the Seed Project
c) Change and Cost Control Management
d) Quality Control Program


The Technical/Technical Risk and Past Performance factors will be afforded primary emphasis in the evaluation, are considered equal in importance, and, when combined, are significantly more important than the Cost/Price factor. Cost/Price, however, will contribute substantially to the selection decision and will be assessed for reasonableness. The sub-factors within the Technical/Technical Risk Factor are considered equal in importance.


Up to six (6) highest rated offerors from the source selection will receive a basic contract award. The highest rated offeror will be awarded the seed project, which satisfies the contract minimum requirement. All remaining awardees will be awarded an initial $2,000 Task Order for the MACC Orientation Seminar to satisfy the contract minimum requirement. All future task orders will be competed among all the contract awardees.


The solicitation will be available in electronic format only. The RFP will be posted on the website at http://www.fbo.gov/ on or about 9 March 2012 and close on or about 30 calendar days thereafter. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.


 

Update #3 ·

Added: Feb 02, 2012 12:53 pm Modified: Feb 24, 2012 12:44 pmTrack Changes

General Information


Document Type: Pre-solicitation Notice
Solicitation Number: FA9401-12-R-0002
Classification Code: Y - Construction of Structures and facilities
Set Aside: Competitive 8(a) Set-Aside
NAICS Code: 236220 - Commercial and Institutional Building Construction


Contracting Office Address


AFNWC/PKO
2000 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKOD will be soliciting a Competitive 8(a) Set-Aside, Firm Fixed Price Multiple Award Construction Contract (MACC) to provide indefinite delivery/indefinite quantity and design-build construction efforts to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. Competition will be restricted to companies with a bona fide place of business in the State of New Mexico, SBA's Acceptance Letter #0682/12/201593/01. A determination/approval of a bona fide place of business must be acquired through the Small Business Administration. Current A&E contractors on contract at Kirtland AFB are not permitted to participate. Foreign contractors will not be permitted to participate at the prime contractor level. This acquisition will encompass requirements that have, in the past, been acquired utilizing the Base Maintenance Contract. Individual Task Order work will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. Task Order limits will be $2,000 to $3,000,000. The contractor shall provide all material, equipment, labor and general conditions to accomplish design, maintenance, repair, and minor construction projects in an expeditious manner. The maximum program value (combined value of all task orders from all awarded contracts) is not to exceed $64M over a five-year period. Each contract awarded will contain a basic 12-month base period and four 12-month option periods.



Work to be performed under the MACC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 Construction, Subsection 236 Construction of Buildings size standard $33.5M and Subsection 237 Heavy and Civil Engineering Construction, size standard $33.5M. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement and removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, painting, roofing and paving. Locations of work will be at Kirtland AFB, NM. Offers are solicited only from business concerns current in the Central Contractor Registration (CCR), and North American Industry Classification System (NAICS)
Code 236220 must specifically be included in the Offerors approved business plan.


A Request for Proposal (RFP) is contemplated utilizing best value source selection procedures described in Federal Acquisition Regulation (FAR) 15.3, Defense Federal Acquisition Regulation Supplement (DFARS) 215.3, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3 and MP 5315.3, targeted toward a Competitive 8(a) set-a-side with a 30-day response time (offers due 30 days after issuing). In using this approach, the Government seeks to award up to six (6) contracts to 8(a) small businesses, who give the Air Force the greatest confidence that they can meet the requirements for up to 100% design and construction expertise on infrastructure renovation, repair, new construction, roads, and/or airfield work. The solicitation will include a design/build seed project that will be used to evaluate these capabilities. The seed project consists of a facility expansion, LRPD Advanced HPM Research Facility Expansion (Project # MHMV 110112). The seed project magnitude is between $1,000,000 to $5,000,000.


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors:


1) Technical/Technical Risk
2) Past Performance
3) Cost/Price


Within the Technical/Technical Risk Factor the following 4 sub-factors will be used:


a) Organizational Structure and Staffing
b) Technical Capability/Execution and Completeness of the Seed Project
c) Change and Cost Control Management
d) Quality Control Program


The Technical/Technical Risk and Past Performance factors will be afforded primary emphasis in the evaluation, are considered equal in importance, and, when combined, are significantly more important than the Cost/Price factor. Cost/Price, however, will contribute substantially to the selection decision and will be assessed for reasonableness. The sub-factors within the Technical/Technical Risk Factor are considered equal in importance.


Up to six (6) highest rated offerors from the source selection will receive a basic contract award. The highest rated offeror will be awarded the seed project, which satisfies the contract minimum requirement. All remaining awardees will be awarded an initial $2,000 Task Order for the MACC Orientation Seminar to satisfy the contract minimum requirement. All future task orders will be competed among all the contract awardees.


The solicitation will be available in electronic format only. The RFP will be posted on the website at http://www.fbo.gov/ on or about 9 March 2012 and close on or about 30 calendar days thereafter. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.


 

Update #2 ·

Added: Feb 02, 2012 12:53 pm Modified: Feb 07, 2012 12:04 pmTrack Changes

General Information


Document Type: Pre-solicitation Notice
Solicitation Number: FA9401-12-R-0002
Classification Code: Y - Construction of Structures and facilities
Set Aside: Competitive 8(a) Set-Aside
NAICS Code: 236220 - Commercial and Institutional Building Construction


Contracting Office Address


AFNWC/PKO
2000 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKOD will be soliciting a Competitive 8(a) Set-Aside, competitive Multiple Award Construction Contract (MACC) to provide indefinite delivery/indefinite quantity and design-build construction efforts to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. Competition will be restricted to companies within the State of New Mexico. Contractors shall have a bona fide place of business in the State of New Mexico. A determination/approval of a bona fide place of business must be acquired through the Small Business Administration. Current A&E contractors on contract at Kirtland AFB are not permitted to participate. This acquisition will encompass requirements that have, in the past, been acquired utilizing the Base Maintenance Contract. Individual Task Order work will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. Task Order limits will be $2,000 to $3,000,000. The contractor shall provide all material, equipment, labor and general conditions to accomplish design, maintenance, repair, and minor construction projects in an expeditious manner. The maximum program value (combined value of all task orders from all awarded contracts) is not to exceed $64M over a five-year period. Each contract awarded will contain a basic 12-month base period and four 12-month option periods.



Work to be performed under the MACC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 Construction, Subsection 236 Construction of Buildings size standard $33.5M and Subsection 237 Heavy and Civil Engineering Construction, size standard $33.5M. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement and removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, painting, roofing and paving. Locations of work will be at Kirtland AFB, NM. Offers are solicited only from business concerns current in the Central Contractor Registration (CCR), and North American Industry Classification System (NAICS)
Code 236220 must specifically be included in the Offerors approved business plan.


A Request for Proposal (RFP) is contemplated utilizing best value source selection procedures described in Federal Acquisition Regulation (FAR) 15.3, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3, and AFFARS Mandatory Procedures 5315.3, targeted toward competitive offerors with a 30-day response time (offers due 30 days after issuing). In using this approach, the Government seeks to award up to six (6) contracts to 8(a) small businesses, who give the Air Force the greatest confidence that they can meet the requirements for up to 100% design and construction expertise on infrastructure renovation, repair, new construction, roads, and/or airfield work. The solicitation will include a design/build seed project that will be used to evaluate these capabilities. The seed project consists of a facility expansion, LRPD Advanced HPM Research Facility Expansion (Project # MHMV 110112). The seed project magnitude is between $1,000,000 to $5,000,000.


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors and sub-factors:


1) Mission Capability
2) Past Performance
3) Price/Cost


Within the Mission Capability Factor the following 4 sub-factors will be used:


a) Organizational Structure and Staffing
b) Technical Capability/Execution and Completeness of the Seed Project
c) Change and Cost Control Management
d) Quality Control Program


The Mission Capability and Past Performance factors will be afforded primary emphasis in the evaluation, are considered equal in importance, and, when combined, are significantly more important than the Price/Cost factor. Price/Cost, however, will contribute substantially to the selection decision and will be assessed for reasonableness. The sub-factors within each factor are considered equal in importance.


Up to six (6) highest rated offerors from the source selection will receive a basic contract award. The highest rated offeror will be awarded the seed project.
All future task orders will be competed among all the contract awardees. All contractors receiving award will receive a not-to-exceed $2,000 Task Order for the MACC Orientation Seminar to satisfy the contract minimum requirement.


The solicitation will be available in electronic format only. The RFP will be posted on the website at http://www.fbo.gov/ on or about 15 Feb 2012 and close on or about 30 calendar days thereafter. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.


 

Update #1 ·

Added: Feb 02, 2012 12:53 pm

General Information


Document Type: Pre-solicitation Notice
Solicitation Number: FA9401-12-R-0002
Classification Code: Y - Construction of Structures and facilities
Set Aside: Competitive 8(a) Set-Aside
NAICS Code: 236220 - Commercial and Institutional Building Construction


Contracting Office Address


AFNWC/PKO
2000 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKO will be soliciting a Competitive 8(a) Set-Aside, competitive Multiple Award Construction Contract (MACC) to provide indefinite delivery/indefinite quantity and design-build construction efforts to support the 377 MSG/CE mission at Kirtland AFB, New Mexico. Competition will be restricted to companies within the State of New Mexico. Current A&E contractors on contract at Kirtland AFB are not permitted to participate. Contractors shall also have a functional office in the State of New Mexico not a satellite office. This acquisition will encompass requirements that have, in the past, been acquired utilizing the Base Maintenance Contract. Individual Task Order work will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. Task Order limits will be $2,000 to $3,000,000. The contractor shall provide all material, equipment, labor and general conditions to accomplish design, maintenance, repair, and minor construction projects in an expeditious manner. The maximum program value (combined value of all task orders from all awarded contracts) is not to exceed $64M over a five-year period. Each contract awarded will contain a basic 12-month base period and four 12-month option periods.



Work to be performed under the MACC will be within the North American Industry Classification System (NAICS) codes as follows: Sector 23 Construction, Subsection 236 Construction of Buildings size standard $33.5M and Subsection 237 Heavy and Civil Engineering Construction, size standard $33.5M. The work may include facility upgrades, utility work, airfield pavement, roads, roofs and other assorted repair and maintenance projects. The construction work includes tasks in various trades such as carpentry, asbestos abatement and removal, demolition, mechanical, electrical, plumbing, concrete masonry, welding, painting, roofing and paving. Locations of work will be at Kirtland AFB, NM. Offers are solicited only from business concerns current in the Central Contractor Registration (CCR), and North American Industry Classification System (NAICS) Code 236220 must specifically be included in the Offerors approved business plan.


A Request for Proposal (RFP) is contemplated utilizing best value source selection procedures described in Federal Acquisition Regulation (FAR) 15.3, Air Force Federal Acquisition Regulation Supplement (AFFARS) 5315.3, and AFFARS Mandatory Procedures 5315.3, targeted toward competitive offerors with a 30-day response time (offers due 30 days after issuing). In using this approach, the Government seeks to award up to six (6) contracts to 8(a) small businesses, who give the Air Force the greatest confidence that they can meet the requirements for up to 100% design and construction expertise on infrastructure renovation, repair, new construction, roads, and/or airfield work. The solicitation will include a design/build seed project that will be used to evaluate these capabilities. The seed project consists of a facility expansion, LRPD Advanced HPM Research Facility Expansion (Project # MHMV 110112). The seed project magnitude is between $1,000,000 to $5,000,000.


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors and sub-factors:


1) Mission Capability
2) Past Performance
3) Price/Cost


Within the Mission Capability Factor the following 4 sub-factors will be used:


a) Organizational Structure and Staffing
b) Technical Capability/Execution and Completeness of the Seed Project
c) Change and Cost Control Management
d) Quality Control Program


The Mission Capability and Past Performance factors will be afforded primary emphasis in the evaluation, are considered equal in importance, and, when combined, are significantly more important than the Price/Cost factor. Price/Cost, however, will contribute substantially to the selection decision and will be assessed for reasonableness. The sub-factors within each factor are considered equal in importance.


Up to six (6) highest rated offerors from the source selection will receive a basic contract award. The highest rated offeror will be awarded the seed project.
All future task orders will be competed among all the contract awardees. All contractors receiving award will receive a not-to-exceed $2,000 Task Order for the MACC Orientation Seminar to satisfy the contract minimum requirement.


The solicitation will be available in electronic format only. The RFP will be posted on the website at http://www.fbo.gov/ on or about 15 Feb 2012 and close on or about 30 calendar days thereafter. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.


 

Attachments

Files attached to this notice, newest first
File Type Posted
Attch_3_-_Wage_Determination_(Bernalillo_County)__Heavy_dated_7-20-2012.pdf PDF
Attch_2_-_Wage_Determination_(Bernalillo_County)__Residential_dated_4-6-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_10.pdf PDF
Attch_1_-_Wage_Determination_(Bernalillo_County)__Building_dated_7-20-2012.pdf PDF
MACC_RFP_FA9401-12-R-0002_Amendment_9.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 7.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 9.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 8.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 6-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 7.pdf PDF
RFP FA9401-12-R-0002 Pre-Proposal Conference-Site Visit Final Sign-in Sheet.pdf PDF
MACC Pre-Proposal Brief.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 4.pdf PDF
MACC RFP FA9401-12-R-0002 Q A Round 3.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 5-Conformed Copy.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 4-Conformed Copy.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
MACC RFP FA9401-12-R-0002 Amendment 4.pdf PDF
MACC RFP FA9401-12-R-0002 Amendment 3.pdf PDF
Attch 10 - Appendix 4.1 - 13280 Asbestos Containing Materials Remediation.pdf PDF
Attch 13 - Appendix 4.4 - 16721 New Construction Automatic Fire Detection and Alarm System.pdf PDF
Attch 26 - Appendix 14.2 - Guidance and Standards-Backflow Prevention.pdf PDF
Attch 15 - Appendix 4.6 - Native Grass Seeding Specification.pdf PDF
Attch 9 - Appendix 3 - DUSD —
Attch 41 - Historical Data by Project Type and Cost.pdf PDF
MACC RFP FA9401-12-R-0002.doc DOC document
Attch 14 - Appendix 4.5 - 16721 Existing Bldg Remodel-Automatic Fire Detection and Alarm System.pdf PDF
Attch 33 - Seed Project Building 909-Study - Cost Removed.pdf PDF
Attch 23 - Appendix 12 - Waste Diversion Report.pdf PDF
Attch 36 - Seed Project - Westside Shoppette Geotechnical Report.pdf PDF
Attch 31 - Seed Project Price Schedule - AF3052.xlsx XLSX spreadsheet
Attch 30 - Seed Project Statement of Work.pdf PDF
Attch 22 - Appendix 11 - DoD Minimum Antiterrorism Construction Standards Pre-Final Checklist.pdf PDF
Attch 39 - AF Form 3065 - Progress Report.pdf PDF
Attch 21 - Appendix 10 - Base Access Procedures KAFB.pdf PDF
Attch 24 - Appendix 13 - AF LEED SDD Implementation Guidance.pdf PDF
Attch 12 - Appendix 4.3 - 16710 Communications.pdf PDF
Attch 27 - Appendix 14.3 - Guidance and Standards-Toilet Accessory Requirements.pdf PDF
Attch 7 - Appendix 1 - General Design Guidelines.pdf PDF
Attch 40 - Kirtland AFB-West Map.pdf PDF
Attch 37 - Seed Project - Future Expansion Power Requirements Table.pdf PDF
Attch 35 - Seed Project Water flow Test Results.pdf PDF
Attch 25 - Appendix 14.1 - Guidance and Standards-Irrigation.pdf PDF
Attch 18 - Appendix 7 Air Force Federal Mandates Quick Reference.pdf PDF
Attch 2 - Wage Determination —
Attch 16 - Appendix 5 - AF Form 592 —
Attch 28 - Appendix 14.4 Guidance Standards-Minimum Communication Standards.pdf PDF
Attch 6 - MACC General Provisions.pdf PDF
Attch 5 - Past Performance Information Questionnaire Package.docx DOCX document
Show all 50

This notice has more attachments on GovTribe.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity