Attachment_19_-_CAFB_Labeling_Standards_for_Communications_-_29_Jan_2009.pdf

PDF 665 KB Posted

Attached to
Simplified Base Engineering Requirements (SABER)
Solicitation number
FA4855-18-R-0003
Issued by

About this file

Attachment 19. CAFB Labeling Standards for Communications 29 Jan 2009

View the file

Other files

File Type Posted
Attachment_46_-_Past_Performance_Information_Sheet_20_May.pdf PDF
FA485518R0003_Amendment_5.pdf PDF
Attachment_45_-_Education.Experience_Matrix_20_May.pdf PDF
Questions_and_Answers_Part_6.pdf PDF
FA485518R0003_Amendment_0004.pdf PDF
FA485518R0003_Amendment_0003.pdf PDF
Attachment_41_-_Sample_Project_Attachment_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_5.pdf PDF
Attachment_01-_SABER_General_Requirements_-_12_Jan_2018.pdf PDF
FA4855-18-R-0003_Amendment_0002.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_18_Jan_2018.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_18_Jan_2018.pdf PDF
FA485518R0003_Q&A_Part_4.pdf PDF
Pre-Proposal_Site_Visit_Memo.Addendum.pdf PDF
FA485518R0003_Q&A_Part_3.pdf PDF
Attachment_43_-_Seed_Project_Attachments_-_10_Jan_2018.pdf PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_10_Jan_2018.pdf PDF
FA485518R0003_Amendment_1.pdf PDF
FA485518R0003_Q&A_Part_2.pdf PDF
Site_Visit_Sign_In_Sheet_Redacted.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part2.MAFR.pdf PDF
Pre-Proposal_Site_Visit_Memo.Part1.CAFB.pdf PDF
FA485518R0003_Q&A_Part_1.pdf PDF
Attachment_32-_WD_NM5_Residential_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_03_-_Example_Drawings_-_May_1975.pdf PDF
Attachment_30-_NMGRT_Invoice_Certification_-_no_date.pdf PDF
Attachment_14_-_AF_Form_66_Schedule_of_Material_Submittals_-_no_date.pdf PDF
Attachment_01-_SABER_General_Requirements_-_6_Oct_2017.pdf PDF
Attachment_38-_Financial_Reference_Worksheet_-_no_date.pdf PDF
Attachment_12_-_AF_Form_3064_-_Progress_Schedule_-_1_Sep_2003.pdf PDF
Attachment_10_-_US_Army_Corps_Of_Engineer_Design_Manual_-_Mar_2007.pdf PDF
Attachment_06_-_CAFB_Landscape_Development_Plan_-_3_Feb_2012.pdf PDF
Attachment_33-_WD_NM50_Highway_Curry_&_Roosevelt_-_6_Jan_2017.pdf PDF
Attachment_28_-_Cost_Estimate_Example_-_no_date.pdf PDF
Attachment_02_-_SABER_Specifications_-_14_Nov_2017.pdf PDF
Attachment_05_-_CAFB_Hardware_Specifications_Guideline_-_Nov_2016.pdf PDF
Attachment_34-_WD_NM23_Building_Curry_-_22_Sep_2017.pdf PDF
Attachment_36-_WD_NM7_Heavy_Curry_-_15_Sep_2017.pdf PDF
Attachment_37-_WD_NM12_Heavy_Roosevelt_-_15_Sep_17.pdf PDF
Attachment_08_-_AFSOC_Facility_Excellence_Guide_-_2008.pdf PDF
FA485518R0003_-_SABER.pdf PDF
Attachment_31-_NMGRT_Proposal_Certification_-_no_date.pdf PDF
Attachment_22_-_CAFB_MAFR_Contractor_Env_Guide_-_2_Jul_2015.pdf PDF
Attachment_09_-_GeoBase_Initial_Operating_Capability_-_19_May_2010.pdf PDF
Attachment_44_-_Additional_Contractor_Information_-_no_date.pdf PDF
Attachment_40_-_Sample_Project_Statement_of_Objectives_-_31_Aug_2017.PDF PDF
Attachment_42_-_Seed_Project_Statement_of_Objectives_-_21_Nov_2017.pdf PDF
Attachment_25_-_AF_Carpet_Standard_-_ETL_07_4_-_28_Mar_2007.pdf PDF
Attachment_04_-_CAFB_Electrical_Standards_-_Apr_2016.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATCH PANEL

TELECOMMUNICATIONS RACK

PORT ON PANEL

R1 -A -1

HORIZONTAL CABLES

TR1 - TR2

100 PR 24 AWG

CA01 301 - 400

CABLE NUMBER TERMINATED COUNT

TERMINATION LOCATIONS

CABLE SIZE

TR1 - TR2

12 FIBER MM

FO 01 1-12

TERMINATION LOCATIONS

FIBER CABLE NUMBER

SINGLE ORCABLE SIZE

CABLE GUAGE

FIBER TERMINATIONS

BUILDING BACKBONE CABLES

MMAC - 1 - X

R1 -A - X

TELECOMMUNICATIONS RACK PATCH PANEL

JACK NUMBER

DEVICE

CARD NUMBER

PORT NUMBER

PATCH CABLES

MULTIMODE

WARNING

IF THIS CLAMP OR CABLE

IS LOOSE OR MUST BE

REMOVED PLEASE CALL THE

BUILDING TELECOMMUNICATIONS

MANAGER

TMGB

TR1

ER1

TELECOMMUNICATIONS

MAIN GROUNDING

BUSBAR

TELECOMMUNICATIONS

ROOM

EQUIPMENT ROOM

GROUNDING

TBB

TGB

TGB

TBB

Attachment 19 FA4855-18-R-0003

Premises Wiring - 27 SOCS/SCOS Cable labeling program 1/29/09 Questions can be directed to 575-784-2710

OUTLET PORT

R1-A 1 2

PATCH PANEL LETTER

(Patch Panels will be lettered in order starting with A)

TELECOMMUNICATIONS RACK NUMBER

(Telecommunications Racks will be numbered numerically, starting with 1, i.e. R1, R2)

3 R1-A 4

JACK LOCATION LABELS

R1-A 1 2

R1-A 5 6

Jacks shall be arranged and labeled according to their location in a room. They shall be arranged clockwise in ascending order around the room while standing in the doorway looking into the room. Floor jack number arrangement should work in clockwise order, looking out the TR doorway. The 27 SOCS labeling scheme adheres to the requirements outlined in the TIA/EIA 606 telecommunication standard.

A

PATCH PANEL

NUMBER

OUTLET PORT

LOCATION

PATCH PANEL

SINGLE GANG DOUBLE GANG

R1-A 3 4 R1-A

3 4 R1-A

7 8

OUTLET PORT

(Ports will be numbered according to port number on patch panel. Ports will be numbered consecutively per quad face plate.)

1 R1-A 2

100 PR 24 AWG

CA01 301 - 400

CABLE NUMBER TERMINATED COUNT

CABLE SIZE

FO Bxx- Bxx 1-12 MM or SM

Fiber Optic Cable I.D.

FIBER CABLE NUMBER

SINGLE OR

CABLE GUAGE

FIBER Cable Strand Count

OUTSIDE PLANT CABLES

MULTIMODE

Copper Cable I.D.

CA-01, 301-400

P1-24PF

Example

FO B10-B355

1-12, SM

Example

File details come from the government source that posted it.