Attachment 28 - AF Form 3000 Material Approval Submittal Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For Evaluation and Action
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
Form Approved OMB No 9000-0062 Expires May 31, 2005
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330
TO: (Contracting Officer) FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-
PROVED
DISAP-
PROVED
SEE
REVERSE INITIAL
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
FOR GOVERNMENT USE ONLY
TO: (Base Civil Engineering Officer)
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (AF Contracting Office)
RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (Contractor)
DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST
APPROVED
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.
NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)
Attachment 28 FA4855-10-R-0006 15 June 2010
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
AF IMT 3000, 20030901, V1 (REVERSE)
Attachment 28 FA4855-10-R-0006 15 June 2010