Attachment 15 - Wage Determination-NM9.pdf

PDF 53 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4855-10-R-0006
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 15 - Wage Determination-NM9 Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
MACC Solicitation Questions Part II.pdf PDF
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 56 - Bldg 206 H208 Area.pdf PDF
Attachment 55 - Bldg 206 Square Footage.pdf PDF
Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf PDF
Attachment 62 - Bldg 206 Roof Plan.pdf PDF
MACC Conformed Solicitation per Amendment 2.doc DOC document
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
Agenda for MACC Pre-Proposal Conference and Site Visit.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
Pre-Proposal Meeting Site Visit Instructions Revised.pdf PDF
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 2 - Cannon AFB Standards for Draft Solicitation.doc DOC document
Attachment 32 - Form DD1354 Transfer and Acceptance of Military Real Property.pdf PDF
Attachment 16 - Seed Project Statement of Objective.pdf PDF
Attachment 17 - Cannon AFB Bldg 206 Existing Layout 8 June 2010.pdf PDF
Attachment 4 - US Army Corps Of Engineer Mobile District Design Manual.pdf PDF
Attachment 9 - UNC-13 Tech Data Sheet.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 26 - AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Attachment 3 - Cannon AFB Architectural Compatibility Plan for Draft Solicitation.pdf PDF
Attachment 37 - Past Performance Project Data.doc DOC document
Attachment 25 - AF Form 3064 Contract Progress Schedule.xls XLS spreadsheet
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 1 - General Provisions - MACC new.doc DOC document
Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf PDF
Attachment 18 - Cannon AFB Bldg 206 Areas 25 June 2010.pdf PDF
MACC solicitation.doc DOC document
Attachment 7 - Asbestos Documentation.pdf PDF
Attachment 14 - Wage Determination-NM2.pdf PDF
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 15 FA4855-10-R-0006 12 March 2010

General Decision Number: NM100009 03/12/2010 NM9

Superseded General Decision Number: NM20080009

State: New Mexico

Construction Types: Residential

Counties: Catron, Chaves, Curry, De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna, Otero, Roosevelt, Sierra and Socorro Counties in New Mexico.

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 03/12/2010

SUNM1999-004 08/05/1999

Rates Fringes

Carpenter (excluding form work, and installation of drywall and soft floors).......$ 11.69 .30

Carpenter Form Work Only..............$ 10.50

Cement Mason...................$ 12.50

Drywall Finisher...............$ 10.00

Electrician (excluding HVAC wiring)........................$ 12.00 .26

Laborer, Unskilled.............$ 8.36

Painter (excluding drywall finishing).....................$ 10.57

Plasterer......................$ 12.00

Plumber (excluding HVAC work)..........................$ 12.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

General Decision Number: NM100009 03/12/2010 NM9
Superseded General Decision Number: NM20080009
State: New Mexico
Construction Types: Residential
Counties: Catron, Chaves, Curry, De Baca, Eddy, Grant,
Hidalgo, Lea, Lincoln, Luna, Otero, Roosevelt, Sierra and
Socorro Counties in New Mexico.
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family
homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 03/12/2010
SUNM1999-004 08/05/1999
Rates Fringes
Carpenter (excluding form
work, and installation of
drywall and soft floors).......$ 11.69 .30
Carpenter
Form Work Only..............$ 10.50
Cement Mason...................$ 12.50
Drywall Finisher...............$ 10.00
Electrician (excluding HVAC
wiring)........................$ 12.00 .26
Laborer, Unskilled.............$ 8.36
Painter (excluding drywall
finishing).....................$ 10.57
Plasterer......................$ 12.00
Plumber (excluding HVAC
work)..........................$ 12.00
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates. Other designations
indicate unions whose rates have been determined to be
prevailing.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
================================================================
END OF GENERAL DECISION

File details come from the government source that posted it. Updated .