Attachment 61 - Bldg 206 Resurfacing.pdf

PDF 385 KB Posted

Attached to
Multiple Award Construction Contract
Solicitation number
FA4855-10-R-0006
Issued by

About this file

Revised or Additional Attachment

View the file

Other files

File Type Posted
MACC Solicitation Questions Part II.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 56 - Bldg 206 H208 Area.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf PDF
Attachment 62 - Bldg 206 Roof Plan.pdf PDF
Attachment 55 - Bldg 206 Square Footage.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
MACC Conformed Solicitation per Amendment 2.doc DOC document
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 60 - Bldg 206 Fire Inspection Reports.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
MACC Amendment 2.doc DOC document
Attachment 39 - Bldg 206 Roof Location Plan.pdf PDF
Attachment 63 - ETL 07-4 Air Force Carpet Standard.pdf PDF
Attachment 54 - Bldg 206 ADAL Base Warehouse Addition Mechanical Plumbing Plan.pdf PDF
Attachment 58 - Bldg 206 Lead Based Paint Removal.pdf PDF
Attachment 57 - Bldg 206 Layout Asbestos Removal.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
Agenda for MACC Pre-Proposal Conference and Site Visit.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
MACC solicitation Amendment.doc DOC document
Pre-Proposal Meeting Site Visit Instructions Revised.pdf PDF
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Floor Resurfacing is the application of a floor surface overlay that shall meet or exceed the following criteria:

1. Epoxy Primer shall meet or exceed:

a. Bond Strength 350 psi

b. Pot Life @ 77°F 20 mins

c. Set Life @ 77°F 4 hrs

2. All-Purpose Epoxy shall meet or exceed:

a. Compressive Strength (ASTM C-579) 13,500 psi

b. Tensile Strength (ASTM C-307) 2,200 psi

c. Flexural Strength (ASTM C-580) 4,000 psi

d. Hardness (Shore D) (ASTM D-2240) 85-90

e. Bond Strength to Concrete (ASTM D-4541) 425 psi

f. Abrasion Resistance (ASTM D-4060) 80 mg

(CS17 Wheel 1000 Cycles)

g. Coefficient of Friction (ASTM D 2047) Dry 0.98/Wet 0.93

h. Pot Life @ 77°F 35 mins

i. Set Life @ 77°F 24 hrs

3. Epoxy Semi-Rigid Joint Filler shall meet or exceed:

a. Compressive Strength (ASTM C-579) 800-850 psi

b. Tensile Strength (ASTM C-307) 1,050 psi

c. Elongation Break (ASTM D-638) 90%

d. Modulus of Elasticity (ASTM D-638) 2,000 psi

e. Tear Resistance (ASTM D-624) 170 lb/in

f. Hardness (Shore D) (ASTM D-2240) 50-55

g. Abrasion Strength (ASTM D-4541) 375 psi

h. Pot Life @ 77°F 25-30 mins

i. Foot Traffic @ 77°F 4 hrs

j. Set Life @ 77°F 24 hrs

Attachment 61 FA4855-10-R-0006 27 July 2010

File details come from the government source that posted it. Updated .