Q- AF IMT 3000_Material Approval Submittal.pdf

Air Force Form PDF 78 KB Posted

Attached to
Repair South Deer Fence
Solicitation number
FA309923R0003
Issued by

View the file

Other versions and copies of AF Form 3000

File Revision Posted Attached to
Attachment D AF Form 3000.pdf Revision not stated Robins AFB Paving Multi-Award IDIQ
SOW App 001 AF IMT 3000 Submittal.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
G_23 05 93-1 TAB Shops - AF FORM 3000 Submittal_JV.pdf Revision not stated ASOG Complex EMCS Camp Murray, WA
AF IMT 3000 - Material Approval Submittal.pdf Revision not stated Repair Airfield Pavement Spalling
12 AF Form 3000.pdf Revision not stated Construct T-1A Static Display
AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair Storm Drain Bldg 1788
Appendix C - AF Form 3000.pdf Revision not stated Static Display Aerospace Vehicles Restoration
Attachment 15 - AF Form 3000.pdf Revision not stated Construct Honor Guard Facility, Tyndall AFB, FL
Appendix H - AF Form 3000.pdf Revision not stated Construct AFTP Fence, Louisiana Avenue Bridge
Attachment 2_AF IMT 3000_2003091_VI_ Submittal.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 2.10 - AF Form 3000 Material Submittals Template.pdf Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 6 - AF Form 3000.pdf Revision not stated Camp Sparta Access Road
J. AF IMT 3000 Material Approval Submittal.pdf Revision not stated Repair_Replace Liner, Wastewater Lagoon One
Attachment 1j Mini-MACC SOW AF IMT 3000 Submittal.pdf Revision not stated JBER Mini-MACC
Attachment 9 AF Form 3000.pdf Revision not stated B729 Parking Lot Improvements, Tyndall AFB, FL
AF Form 3000.pdf Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
15. AF Form 3000 Material Approval Submittal (2 pages) - BLANK.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Attachment 10. AF Form 3000.pdf Revision not stated Repair Beacon Beach Road, Tyndall AFB, FL
Attachment 7 AF Form 3000.pdf Revision not stated Ammo Phase III
Attachment 11 AF Form 3000.pdf Revision not stated Construct Honor Guard Facility
Show all 20

Who attaches AF Form 3000

Other files

File Type Posted
Amendment 0003 Attachment 2.JPG JPG image
Amendment 0003 Attachment 1.pdf PDF
Amendment 0003 - RFI Responses.pdf PDF
Amendment 0002 - Extended Proposal Due Date.pdf PDF
Amendment 0001 - Site Visit and RFI update.pdf PDF
Solicitation - FA309923R0003.pdf PDF
O- Notification of Compliance with Contract Insurance Requirements.pdf PDF
R- DD 1354.pdf PDF
S- Financial Institution Reference Sheet.pdf PDF
T- Past Performance Questionnaire.pdf PDF
D- Division 01 Specifications_31 May 22.docx DOCX document
L - AETC Installation Excellence Guide.pdf PDF
F - MXDP 21-1012 Schedule of Material Submittals.xlsx XLSX spreadsheet
B- Environmental Quality Construction Specifications March 20 2022.pdf PDF
E - Progress Schedule Form and Progress Report.xlsx XLSX spreadsheet
H - UFGS 32 31 13.53 High-Security Fences Chain Link and Gates.docx DOCX document
I - MXDP21-1012 Drawings.pdf PDF
J - Work Clearance Request Form.pdf PDF
K - UFC_3_260_01_2019_c1.pdf PDF
P- EAL Template.pdf PDF
G - UFC 4-022-03 Security Fences and Gates.pdf PDF
C - Blank FAA Form 7460-01.pdf PDF
H - UFGS 32 31 13.53 High-Security Fences Chain Link and Gates.pdf PDF
N- Wage Determination.pdf PDF
M - LAFB Architectural Compatibility Guide.pdf PDF
A- Photos.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For Evaluation and Action

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

(YYYYMMDD)

Form Approved OMB No 9000-0062 Expires May 31, 2005

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.

TO: (Contracting Officer) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Base Civil Engineering Officer)

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (AF Contracting Office)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE

DATE TYPE OR PRINT NAME AND GRADE SIGNATURE

TO: (Contractor)

DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUESTAPPROVED

RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.

DATE TYPE OR PRINT NAME AND GRADE

SIGNATURE

AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.

NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.

AF IMT 3000, 20030901, V1 (REVERSE)

File details come from the government source that posted it. Updated .