Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf

PDF 16 MB Posted

Attached to
Multiple Award Construction Contract
Solicitation number
FA4855-10-R-0006
Issued by

About this file

Revised or Additional Attachment

View the file

Other files

File Type Posted
MACC Solicitation Questions Part II.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 56 - Bldg 206 H208 Area.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf PDF
Attachment 62 - Bldg 206 Roof Plan.pdf PDF
Attachment 55 - Bldg 206 Square Footage.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
MACC Conformed Solicitation per Amendment 2.doc DOC document
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 60 - Bldg 206 Fire Inspection Reports.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
MACC Amendment 2.doc DOC document
Attachment 39 - Bldg 206 Roof Location Plan.pdf PDF
Attachment 63 - ETL 07-4 Air Force Carpet Standard.pdf PDF
Attachment 54 - Bldg 206 ADAL Base Warehouse Addition Mechanical Plumbing Plan.pdf PDF
Attachment 58 - Bldg 206 Lead Based Paint Removal.pdf PDF
Attachment 57 - Bldg 206 Layout Asbestos Removal.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
Agenda for MACC Pre-Proposal Conference and Site Visit.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
MACC solicitation Amendment.doc DOC document
Pre-Proposal Meeting Site Visit Instructions Revised.pdf PDF
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 49 FA4855-10-R-0006 25 February 1998

ADAL_Base_Supply_1_General_Info
ADAL_Base_Supply_2_Location_Map
ADAL_Base_Supply_3A_Boring_Logs
ADAL_Base_Supply_4_Demo_Plan
ADAL_Base_Supply_5_Site_Plan_Layout
ADAL_Base_Supply_6_Grading_Plan
ADAL_Base_Supply_7_Paving_Plan
ADAL_Base_Supply_8_Utility_Plan
ADAL_Base_Supply_9_Site_Details
ADAL_Base_Supply_10_Site_Details
ADAL_Base_Supply_11_Site_Details
ADAL_Base_Supply_12_Site_Details
ADAL_Base_Supply_13_Irrigation_Plan
ADAL_Base_Supply_14_Lanscape_Const_Paving_Plan
ADAL_Base_Supply_15_Landscape_Details
ADAL_Base_Supply_16_Demo_Plans
ADAL_Base_Supply_17_Floor_Plan_North
ADAL_Base_Supply_18_Floor_Plan_South
ADAL_Base_Supply_19_Refl_Ceiling_Plan_South
ADAL_Base_Supply_20_Roof_Plan
ADAL_Base_Supply_21_Door_Frame_Elevs_Dets
ADAL_Base_Supply_22_Exterior_Elevations
ADAL_Base_Supply_23_Exterior_Elevations
ADAL_Base_Supply_24_Bldg_Sections
ADAL_Base_Supply_25_Wall_Sects_Dets
ADAL_Base_Supply_26_Wall_Sections
ADAL_Base_Supply_28_Furnishing_Plan_North
ADAL_Base_Supply_29_Foundation_Plan
ADAL_Base_Supply_30_Roof_Framing_Plan
ADAL_Base_Supply_31_Gen_Notes_Scheds
ADAL_Base_Supply_32_Gen_Notes_Scheds
ADAL_Base_Supply_33_Grade_Beam_Sched
ADAL_Base_Supply_34_Foundation_Details
ADAL_Base_Supply_35_Foundation_Details
ADAL_Base_Supply_36_Framing_Details
ADAL_Base_Supply_37_Mech_Plumb_Plan
ADAL_Base_Supply_38_Mech_Plumb_Details
ADAL_Base_Supply_40_Fire_Protect_Plan
ADAL_Base_Supply_41_Fire_Protect_Plan_North
ADAL_Base_Supply_42_Lighting_Plan_North
ADAL_Base_Supply_43_Power_Spec_Syst_Plan_North
ADAL_Base_Supply_44_Riser_Wiring_Diagrams

File details come from the government source that posted it. Updated .