MACC Solicitation Questions Part II.pdf

PDF 51 KB Posted

Attached to
Multiple Award Construction Contract
Solicitation number
FA4855-10-R-0006
Issued by

View the file

Other files

File Type Posted
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 56 - Bldg 206 H208 Area.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf PDF
Attachment 62 - Bldg 206 Roof Plan.pdf PDF
Attachment 55 - Bldg 206 Square Footage.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
MACC Conformed Solicitation per Amendment 2.doc DOC document
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 60 - Bldg 206 Fire Inspection Reports.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
MACC Amendment 2.doc DOC document
Attachment 39 - Bldg 206 Roof Location Plan.pdf PDF
Attachment 63 - ETL 07-4 Air Force Carpet Standard.pdf PDF
Attachment 54 - Bldg 206 ADAL Base Warehouse Addition Mechanical Plumbing Plan.pdf PDF
Attachment 58 - Bldg 206 Lead Based Paint Removal.pdf PDF
Attachment 57 - Bldg 206 Layout Asbestos Removal.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
Agenda for MACC Pre-Proposal Conference and Site Visit.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
MACC solicitation Amendment.doc DOC document
Pre-Proposal Meeting Site Visit Instructions Revised.pdf PDF
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CONTRACTING SQUADRON

(AFSOC)

CANNON AIR FORCE BASE, NEW MEXICO

MACC FA4855-10-R-0006

FROM: 27TH SPECIAL OPERATIONS CONTRACTING SQUADRON BFLT

110 E. SEXTANT AVE, BLDG 600

CANNON AFB, NM 88103

SUBJECT: FA4855-10-R-0006

MACC Pre-Proposal Conference and Site Visit Questions, Part II

Question 1:

Centennial Contractors Enterprises, Inc.

Please confirm the appropriate point(s) of contact for receipt of the completed Past Performance Questionnaires. The instructions on p. 57 of 66 of the solicitation note that the questionnaires should be submitted by the evaluator to SSgt Kendra Strnad. However, the language of Attachment 36 invites the evaluator to return the questionnaires to either SSgt Strnad or Mr. Bill Shockley.

Answer: Questionnaires may be submitted to either individual listed in Attachment 36 and Section A (page 3 of 66) of the solicitation.

Question 2:

Contractors Enterprises, Inc.

Please confirm the due date of the completed Past Performance Questionnaires. Page 57 of 66 notes questionnaires are due to the Government “no later than 7 calendar days after [the evaluator’s] receipt of the questionnaire,” while Attachment 36 still includes the draft due date of July 1, 2010.

Answer: The date in Attachment 36 was corrected in Amendment 2 of the solicitation which was posted to FBO on 27 July 2010.

Question 3:

Contractors Enterprises, Inc.

Regarding Factor 2, Past Performance (Volume II), on pp. 55–56 of 66: It is our understanding that each prime, teaming partner, and/or joint venture partner should submit Past Performance Information Sheets on a total of 3–5 relevant contracts in Volume II, with an understanding that Section 2.3.3 serves to clarify the requirements of Section 2.3.2 and is not a separate requirement. If this not correct, please clarify the total number of Past Performance Information Sheets to be submitted in Volume II by each prime, teaming partner, and/or joint venture partner.

Answer: Correct.

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CONTRACTING SQUADRON

(AFSOC)

CANNON AIR FORCE BASE, NEW MEXICO

MACC FA4855-10-R-0006

Question 4:

Overland Corporation

It is indicated on p. 52 of 66 that the page limit for Volume I excludes the drawings and specifications for the sample project. Please confirm that this means that all material to be submitted under Factor 1, Subfactor 2, is excluded from the 40-page limit. If all Subfactor 2 material is not excluded from the 40-page limit, will the Government please specify which Subfactor 2 elements will be counted against the page limit?

Answer: That is incorrect. The only items excluded from the page for all portions of Volume II are drawings and specifications. Examples of items that will be included in the page limit are, but not limited to, written discussions, supporting engineering and planning documents, and project schedules.

Question 5:

Contractors Enterprises, Inc.

Please confirm that all completed SF 294 and SF 295 forms, including any supplied by subcontractors/teaming partners, should be submitted as part of Volume IV, and that the offeror may cross-reference Volume IV when responding to Paragraph 2.3.7 on p. 57 of 66 instead of including completed SF 294 and SF 295 forms in Volume II.

Question 6:

Contractors Enterprises, Inc.

Please confirm that the required SF 294 and SF 295 forms are excluded from the 5-page limit for Volume IV, Small Business Subcontracting Plan.

File details come from the government source that posted it. Updated .